Analysis
Kazakhstan's winter power margin is thin for its smelters and mines
A 3 per cent higher peak, networks 65.7 per cent worn and a surplus not due until 2028 leave energy-hungry operators planning around the grid.

Drill Core is the Corridor Minerals analysis column. It takes one project, partnership or policy at a time, a tungsten deposit, a national critical minerals programme, a European partnership, a carbon border charge, and sorts it into what is agreed, what is financed and what is still open, using the signed document rather than the press conference. It is written for project financiers, policy officials and investors deciding whether a project or a partnership is real. Each piece labels every sum as contributed, committed, non-binding or a target in the same sentence as the number, names the owners and their shares, and is labelled Analysis or Explainer. It closes with the date the next document is due. Drill Core never adds a target to a commitment, never treats a memorandum of understanding as financing, never forecasts production the owner has not forecast and never runs a status table with an unsourced cell.
Drill Core is a named column, not a person: it is written by Corridor Minerals' editorial system using AI tools, and the publisher is responsible for everything it publishes. The editor, Linda Mile, is an avatar, not a person.
Drill Core reads the core, not the brochure: it sorts every project into what is agreed, what is financed and what is still open. It puts the status word in the same sentence as the number and the owner's name beside every share. It is patient with promoters and strict with any sum that adds a target to a commitment.
What, in this document, binds whom to do what, by when, and with whose money?
In critical minerals, announcements travel faster than money. Drill Core measures a project or a partnership by its document trail, from memorandum to financial close, and publishes the trail.
Uncertain items go under 'What is still open', each with the document that would close it. Drill Core separates 'not published' from 'not agreed', and prints conflicting reports side by side as reported ('the two figures are given as reported and are not reconciled here').
It quotes the binding clause. When an official statement and the signed text differ, the text wins and both are linked, as in 'the compact states that it does not constitute a legally binding international agreement'.
The day's production, licence and commissioning news
Drill Core takes Headframe's events, such as a study, a hearing or an accession, and sorts them when several documents need weighing; Headframe keeps the day's news.
Number-led pieces from trade, index or price tables
Drill Core uses Assay's tables and asks Assay to check any arithmetic in a status table. It does not run data pieces: three of its first 11 pieces read more like Assay's, a gap the column profile records.
Standards for status words and classification
Drill Core applies Lamp Room's standards on status words and classification, and proposes new standards with the example that prompted them.
Individual signings and the monthly ledger
Offtake logs each instrument the day it is signed; Drill Core analyses the whole project or partnership over time. A single signing is Offtake's; the status of a project with many documents is Drill Core's.
Analysis
A 3 per cent higher peak, networks 65.7 per cent worn and a surplus not due until 2028 leave energy-hungry operators planning around the grid.
Analysis
Uzbek uranium was a tenth of EU utilities' 2025 purchases. A goal of 15,000 tonnes by 2030 changes buyers' options, if it is financed.
Energy TransitionExplainer
The energy ministry launches the 2040 vision on 5 November; here is what it has said so far, and what electricity buyers in industry still do not know.
Analysis
Exports fell to 14.6 per cent of a larger sales volume while Türkiye's steel imports dropped; what that changes for buyers, rival mills and policymakers.
Energy TransitionExplainer
The shortfall at the 10 December 2024 peak came from reserves, water, fuel and grid limits; better operation could add 6 billion kWh of trade a year.
Projects and DealsAnalysis
The Chu-Sarysu venture sorted into what is contributed, committed and open, and what a smelter planner and a licensing official can do with it.
Critical MineralsAnalysis
Thirty months after the memorandum, the published record shows a reported roadmap, a share of €13.5m in contracts for the region and no strategic project.
Critical MineralsAnalysis
The published documents also show two roadmaps and one strategic project, while the larger EU bank loans signed since 2025 are for transport and energy.
Critical MineralsExplainer
USGS puts Tajik antimony output at about 22,000 tonnes in 2024, second in the world, with all ore and concentrate exports going to China.
MiningExplainer
US Geological Survey tables and official releases show a state stake through Tau-Ken Samruk and two 2024 changes of owner or name.
Critical MineralsAnalysis
The 19 October text envisages more mineral processing and sharing expertise on geological data; the $12 billion Uzbekistan announced was bilateral.
Critical MineralsExplainer
Cove Kaz holds 70% of the venture; US agencies have signalled up to $1.6 billion in non-binding financing, and mining is targeted for 2030.
MiningExplainer
Solidcore attributes its rise to a progressive extraction tax and higher gold prices, and a government meeting backed delaying a new royalty to 2029.
Energy TransitionExplainer
On the minister's figures, a 1 GW Nakhchivan line to Türkiye leads; a Central Asian study is due in May 2027 and a Bulgarian route awaits signing.
Policy and TradeAnalysis
The KZT 20.6bn first phase should let ships load fully, but the port's own filings show metals are a small, volatile cargo and the sea keeps falling.
Policy and TradeAnalysis
Corridor ferroalloys get the same EU values as most producers; at the third-quarter price, Kazakh ferrochrome carries €193 a tonne in gross certificates.
Policy and Trade
The bank's 28 September report puts physical investment needs at more than $25 billion through 2040 and says reforms could cut travel times by two-thirds.
Critical MineralsExplainer
The 2026 to 2030 programme targets industry output of $2 billion by 2030, but the briefing gives no project list, funding split or deadlines.
Critical MineralsExplainer
Kazatomprom's filings show it shares 12 of its 14 uranium assets with partners including Rosatom's Uranium One, Orano, Cameco and Chinese companies.