<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
<channel>
<title>Corridor Minerals</title>
<link>https://corridorminerals.com/</link>
<atom:link href="https://corridorminerals.com/rss.xml" rel="self" type="application/rss+xml"/>
<description>Corridor Minerals covers mining, metals, critical minerals and the energy transition across the Caucasus, Central Asia and wider Eurasia: producers and projects, trade routes, financing, policy and the data behind the headlines.</description>
<image><url>https://corridorminerals.com/img/brand/wordmark-mark-on-light.png?v=955e6486</url><title>Corridor Minerals</title><link>https://corridorminerals.com/</link><width>144</width><height>21</height></image>
<language>en-gb</language>
<copyright>Corridor Minerals</copyright>
<ttl>60</ttl>
<lastBuildDate>Sat, 14 Nov 2026 00:00:00 +0000</lastBuildDate>
<item><title>Kazakhstan sets deadlines for critical metals and uranium reserves</title><link>https://corridorminerals.com/news/kazakhstan-critical-metals-reserve-2026-uranium-reserve-2027-action-plan</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-critical-metals-reserve-2026-uranium-reserve-2027-action-plan</guid><pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate><description>A draft 96-measure government plan sets up a critical metals reserve system by the end of 2026 and a strategic uranium stock for nuclear plants by 2027.</description><category>Critical Minerals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-critical-metals-reserve-2026-uranium-reserve-2027-action-plan.jpg?v=b7c0a178" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh action plan, Metals and uranium reserves set</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-critical-metals-reserve-2026-uranium-reserve-2027-action-plan.jpg?v=b7c0a178" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-critical-metals-reserve-2026-uranium-reserve-2027-action-plan.jpg?v=b7c0a178" length="123798" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan will create a national system for managing critical metals reserves by the end of 2026 and a state strategic uranium reserve by the end of 2027, Deputy Prime Minister Serik Zhumangarin told a government session, <a href="https://primeminister.kz/en/news/kazakhstan-to-revise-investment-policy-and-strengthen-support-for-medium-sized-businesses-32077">the government said</a> on 3 November.</p>
<p>The deadlines are part of a draft nationwide action plan to carry out President Kassym-Jomart Tokayev's address, with 96 measures in 12 areas, which the government <a href="https://primeminister.kz/en/news/government-approved-the-draft-nationwide-action-plan-for-the-implementation-of-the-presidents-address-32075">approved at the session</a> chaired by Prime Minister Olzhas Bektenov. Zhumangarin is also Minister of National Economy.</p>
<p>For subsoil users, the plan commits the government to fill the Unified Subsoil Use Platform information system completely, so that geological data are transparent, and to move exploration to advanced technologies and digital geological maps. The ministry's new 1:50,000 mapping has already produced <a href="https://corridorminerals.com/news/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year">seven targets for auction next year</a>. In 2027 the government plans to introduce mechanisms for accelerated industrial and technological development, Zhumangarin said.</p>
<p>On nuclear power, the plan sets the end of 2027 for the uranium reserve and for signing an intergovernmental agreement on the Moiynqum nuclear power plant, with staff training to follow. The Atomic Industry Development Strategy to 2050 sets a reserve of at least 150,000 tonnes of uranium by 2050, built as a multi-level system that covers uranium in the subsoil, a physical stock of natural uranium and a reserve of finished fuel, <a href="https://forbes.kz/articles/kazahstan-planiruet-sozdat-strategicheskiy-rezerv-urana-do-kontsa-2027-goda-092143">Forbes Kazakhstan reported</a>. Almasadam Satkaliyev, chairman of the Agency for Atomic Energy, gave the 150,000 tonne figure to a committee of the Kurultai, <a href="https://astanatimes.com/?p=122411">The Astana Times reported</a>. Kazatomprom, the national producer, <a href="https://corridorminerals.com/news/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price">raised its group uranium sales by 25 per cent</a> in the third quarter.</p>
<p>For power, the plan names a sustainable energy surplus as the key task, through new plants, modernisation of existing ones, clean coal generation and transmission lines, with an update of the single long-term energy balance to 2035 as the benchmark. The government also expects the Bakhty to Ayagoz railway line to be commissioned by the end of 2027.</p><p><a href="https://corridorminerals.com/news/kazakhstan-critical-metals-reserve-2026-uranium-reserve-2027-action-plan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan&#x27;s winter power margin is thin for its smelters and mines</title><link>https://corridorminerals.com/news/kazakhstan-winter-power-margin-smelters-mines-analysis</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-winter-power-margin-smelters-mines-analysis</guid><pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate><description>A 3 per cent higher peak, networks 65.7 per cent worn and a surplus not due until 2028 leave energy-hungry operators planning around the grid.</description><category>Analysis</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-winter-power-margin-smelters-mines-analysis.jpg?v=71daa2b8" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Analysis, Kazakh power margin and industry</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-winter-power-margin-smelters-mines-analysis.jpg?v=71daa2b8" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-winter-power-margin-smelters-mines-analysis.jpg?v=71daa2b8" length="135776" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan expects electricity demand to peak at up to 18,200 MW this winter, 3 per cent above last season, while generation in the first ten months rose 2.3 per cent to 102 billion kWh, <a href="https://primeminister.kz/en/news/heating-season-in-kazakhstan-is-proceeding-routinely-yerlan-akkenzhenov-32103">the government said</a> on 10 November.</p>
<p>Energy Minister Yerlan Akkenzhenov gave the figures to a government session. For a smelter or a mine that buys power from the grid, those two numbers frame the winter. Drill Core reads the published figures for three readers: the energy manager at a smelter, the operator planning a new mine or plant, and the regulator. The short answer is that the system is being repaired and extended on a published timetable, but the margin before 2028 is thin, and operators who need more power should plan around the grid's dates rather than their own.</p>
<h2>For the energy manager, an old grid under higher load</h2>
<p>The ministry put wear at 52 per cent for power plants, 65.7 per cent for electric networks and 48 per cent for heating networks, and raised repair financing by an average of 27 per cent. Technological disruptions fell 6 per cent year on year. The repairs reduce the risk of failures but do not change the age of the equipment, which is the variable a site's energy manager cannot control.</p>
<p>The grid has handled surges this year. More than 70 sharp load surges hit the North to South line since January, and 95 per cent were resolved without cutting power to households, KEGOC said at a <a href="https://primeminister.kz/en/news/olzhas-bektenov-holds-meeting-on-countrys-electric-power-industry-development-samruk-kazyna-fund-projects-reviewed-32087">meeting on the power industry</a> on 5 November. The government's figure counts households, not industrial users, so a smelter cannot read its own exposure from it. Plants with their own generation are better placed: Kazchrome is building an <a href="https://corridorminerals.com/news/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw">80 MW station running on furnace gas</a> at its Aktobe smelter.</p>
<h2>For the project developer, the grid's dates set the schedule</h2>
<p>KEGOC expects average annual load growth of 5.6 per cent in 2027 to 2033 and a move from deficit to a small capacity surplus in 2028, reaching 2.8 GW by 2029 including the required reserve, its chairman Nabi Aitzhanov told a parliamentary committee, <a href="https://www.trend.az/casia/kazakhstan/4242423.html">Trend reported</a>. That surplus depends on the planned generation being built. Its new transmission arrives on fixed dates: 440 MW more on the southern transit by July 2027 and a link raising throughput for western Kazakhstan to 500 MW by December 2027, as <a href="https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029">we reported</a>.</p>
<p>A developer in the south or the west who needs a large new connection before those dates is competing for capacity that does not yet exist. On Drill Core's reading, a project timetable that assumes full grid supply in 2027 carries more risk than one that starts in 2028 or brings its own generation.</p>
<p>Coal miners sit on the other side of the same balance. Power plants hold 5.8 million tonnes of coal at their depots, and households and municipal users need 7.3 million tonnes this season, of which 62 per cent had been procured by the session, the government said. Demand for thermal coal at home is therefore set by the same winter peak, and a coal producer selling to power plants and households is exposed to the delivery schedule rather than to price alone.</p>
<h2>For the regulator, the balance update is the test</h2>
<p>Prime Minister Olzhas Bektenov told the Ministry of Energy to complete an update of the energy balance by September 2027 and ordered tighter oversight of power investment projects. The update will show whether the 2029 surplus still holds once the new loads of the next two years are counted. For industrial buyers, it is the document to read before committing to new energy-intensive capacity. The winter numbers, set out in <a href="https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes">our report on the heating season</a>, are the baseline it will start from.</p><p><a href="https://corridorminerals.com/news/kazakhstan-winter-power-margin-smelters-mines-analysis">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan signs $1.2bn of wind and gas deals at COP31 in Antalya</title><link>https://corridorminerals.com/news/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay</guid><pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate><description>The package includes a 1 GW wind plant in Kostanay and a 150 MW plant in Turkestan, as renewables reach 8 per cent of the energy mix.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay.jpg?v=06fc380b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan at COP31, $1.2bn of wind and gas deals</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay.jpg?v=06fc380b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay.jpg?v=06fc380b" length="116586" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan signed agreements worth about $1.2 billion on renewable energy and the modernisation of gas infrastructure at the COP31 climate conference in Antalya, including wind power plants of 1 GW in Kostanay region and 150 MW in Turkestan region, <a href="https://primeminister.kz/ru/news/olzhas-bektenov-po-porucheniyu-prezidenta-prinyal-uchastie-v-sammite-cop31-v-antale-32111">the government said</a> on 11 November.</p>
<p>Prime Minister Olzhas Bektenov attended the leaders' summit on the President's instruction. He said the share of renewables in the energy mix had quadrupled in six years to 8 per cent in 2026, against a target of 15 per cent by 2030, and that nuclear, wind, solar and green hydrogen projects were under development. Kazakhstan, Azerbaijan and Uzbekistan have a joint Green Energy Corridor project to export clean electricity, he said. Azerbaijan has four power export links <a href="https://corridorminerals.com/news/azerbaijan-four-power-export-links-under-way-studied-open">under way or under study</a>.</p>
<p>The package also covers 1.35 million smart gas meters with remote data transmission for Aqyl Energy. The government did not name the developers of the two wind plants or give the cost of each. The new capacity adds to the government's plan for 13.3 GW of new generation by 2029, of which 5.9 GW is renewable, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">as we reported</a>.</p>
<p>Before the conference opened, Kazakhstan had prepared a preliminary package of 28 cooperation documents, including 19 memorandums of understanding, with the final list to be set by the Ministry of Ecology and Natural Resources, <a href="https://astanatimes.com/?p=122742">The Astana Times reported</a> on 9 November. The country's pavilion was to host 36 events, <a href="https://caspianpost.com/kazakhstan/kazakhstan-to-sign-28-cooperation-documents-at-cop31-in-turkiye">Caspian Post reported</a>. Projects shown there included methane emissions reduction, recycling of lithium-ion batteries and a green energy corridor across the Caspian Sea to Europe, the government said. COP31 runs in Antalya until 20 November.</p>
<p>The leaders' summit drew heads of state and government from more than 70 countries. Kazakhstan's pavilion programme also covered the restoration of the North Aral Sea, protection of the Caspian Sea environment, the energy transition, carbon markets and green investment, and its digital exhibits included a regional carbon AI platform and a Caspian Climate Shield adaptation system, the government said.</p><p><a href="https://corridorminerals.com/news/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh copper producer prices rise 15.5 per cent as lead falls</title><link>https://corridorminerals.com/news/kazakhstan-producer-prices-october-2026-copper-up-15-5-per-cent-lead-down-20-5</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-producer-prices-october-2026-copper-up-15-5-per-cent-lead-down-20-5</guid><pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate><description>October producer prices for zinc and aluminium also rose on the year, and electricity prices were 32 per cent higher, official data show.</description><category>Metals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-producer-prices-october-2026-copper-up-15-5-per-cent-lead-down-20-5.jpg?v=9dbb08e0" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, official statistics, Copper prices up 15.5 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-producer-prices-october-2026-copper-up-15-5-per-cent-lead-down-20-5.jpg?v=9dbb08e0" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-producer-prices-october-2026-copper-up-15-5-per-cent-lead-down-20-5.jpg?v=9dbb08e0" length="138068" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakh producers of refined copper charged 15.5 per cent more in October than a year earlier, while prices for unwrought lead fell 20.5 per cent, the Bureau of National Statistics said in <a href="https://stat.gov.kz/api/iblock/element/421069/file/en/">its producer price release of 5 November</a>.</p>
<p>The bureau's index for refined copper and copper alloys stood at 115.5 against October 2025, zinc at 110.6 and unwrought aluminium at 109.3. Ferroalloys were almost flat at 99.7 and rolled ferrous metal edged up to 100.5, while lead dropped to 79.5. Over January to October, copper prices were 20.7 per cent higher than in the same months of 2025, aluminium 19.1 per cent and zinc 11.3 per cent, while lead was 11.5 per cent lower.</p>
<p>Most of the move came earlier in the year. Against September, copper rose only 0.2 per cent, aluminium 1.3 per cent, zinc 1.8 per cent and lead 0.7 per cent. Against December 2025, copper was up 12.5 per cent and lead down 17.7 per cent.</p>
<p>Further up the chain, the index for mining of metal ores rose 1.8 per cent on the year in October and was 9.3 per cent higher over the ten months. Industrial producer prices as a whole were 8.0 per cent above October 2025, with crude oil at an index of 119.6.</p>
<p>The steepest rise among the products the bureau tracks was in electricity, where producer prices were 32.0 per cent higher than a year earlier and 31.7 per cent above December 2025. Electricity distribution services rose 22.3 per cent on the year. The power system is now preparing for <a href="https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes">an 18,200 MW winter peak</a>, while coal prices rose just 1.7 per cent.</p>
<p>The direction of the metals moves broadly matches world prices. The World Bank's <a href="https://thedocs.worldbank.org/en/doc/2ac43f46629cf90c2ea5b8929a343593-0050012026/original/CMO-October-2026.pdf">October Commodity Markets Outlook</a> forecasts an average copper price of US$13,200 a tonne in 2026, 32.7 per cent above 2025, with aluminium up 23.5 per cent and zinc up 22.0 per cent, and lead down 2.7 per cent. The bank said copper prices rose 6 per cent in the third quarter and reached new record highs in October, while lead fell 5 per cent in the quarter and declined further in October as inventories rose. We covered <a href="https://corridorminerals.com/news/world-bank-raises-2026-copper-forecast-13200-tonne-zinc-tin-gold-outlook">the forecast in detail</a> when it was published.</p>
<p>Domestic producer prices are only part of the picture for a metal that is largely exported. Türkiye bought <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">59 per cent of Kazakhstan's refined copper exports by value</a> in the first eight months of 2026, our earlier analysis of trade data found, with China taking about a third.</p>
<p>The October spreadsheet is the latest in the bureau's <a href="https://stat.gov.kz/en/industries/economy/prices/spreadsheets/?year=2026&name=37852&period=&type=">monthly series of industrial producer prices</a>. The November index is due on 7 December.</p><p><a href="https://corridorminerals.com/news/kazakhstan-producer-prices-october-2026-copper-up-15-5-per-cent-lead-down-20-5">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan readies for 18,200 MW winter peak with 5.8m tonnes of coal</title><link>https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>Repair budgets rose 27 per cent for plants and grids that are up to 65.7 per cent worn, and 62 per cent of the season&#x27;s coal has been procured.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes.jpg?v=ee4251c9" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh heating season, Winter peak seen at 18,200 MW</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes.jpg?v=ee4251c9" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes.jpg?v=ee4251c9" length="139409" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan expects electricity demand to peak at up to 18,200 MW this winter, 3 per cent above last season, and its power plants hold 5.8 million tonnes of coal in reserve, Energy Minister Yerlan Akkenzhenov told a government session, <a href="https://primeminister.kz/en/news/heating-season-in-kazakhstan-is-proceeding-routinely-yerlan-akkenzhenov-32103">the government said</a> on 10 November.</p>
<p>The minister said the heating season was proceeding routinely and that all consumers were fully supplied with electricity and heat. Power plants also hold 137,000 tonnes of fuel oil. Kazakhstan generated 102 billion kWh of electricity in the first ten months of 2026, 2.3 per cent more than in the same period of 2025, the government said.</p>
<p>Under the System Operator's schedule for the 2026 to 2027 autumn and winter period, 9 power units, 55 boilers and 51 turbines were due for repair. By the session, 8 units, 49 boilers and 37 turbines had been completed, and the remaining work concerns reserve capacity and does not affect the season, the ministry said. Regional grid companies repaired 17,100 km of power lines and 444 substations, all of their plan, as well as 377 km of heating networks.</p>
<p>Repair financing rose by an average of 27 per cent. Power plants received up to 384 billion tenge, electric grids up to 393 billion tenge and heating networks up to 198 billion tenge, the ministry said, which comes to 975 billion tenge on a Corridor Minerals calculation. <a href="https://www.zakon.kz/obshestvo/6538169-teplo-bez-pereboev-i-ugol-bez-ocheredey-glava-minenergo-rasskazal-o-prokhozhdenii-otopitelnogo-sezona.html">Zakon.kz</a> described the total as almost 1 trillion tenge.</p>
<p>The equipment that money goes to remains old. The ministry put wear at 52 per cent for power plants, 65.7 per cent for electric networks and 48 per cent for heating networks. Technological disruptions fell by an average of 6 per cent year on year, and by 8 per cent at power plants.</p>
<p>Summer works under the national project for modernising the energy and utilities sectors replaced some of the most worn pipes. Stepnogorsk rebuilt 9.5 km of heating networks with about 85 per cent wear. Taldykorgan renewed, in a first stage, 3.5 km of a 700 mm trunk pipeline that had been in service for 46 years and was 87 per cent worn, and Petropavl modernised two heating main sections totalling 4.3 km.</p>
<p>Households and municipal users need 7.3 million tonnes of coal this season: 5.7 million tonnes for the population and 1.6 million tonnes for the municipal and household sector. By the reporting date 4.52 million tonnes, 62 per cent of the requirement, had been procured. A republican headquarters at the ministry coordinates supply with coal mining companies, operators, the national railway company KTZ and local authorities.</p>
<p>Regions are also receiving 255,000 tonnes of fuel oil for social needs under a delivery schedule, with shipments running since September, <a href="https://bes.media/news/energosistema-kazahstana-zimoy-budet-rabotat-s-povyshennoy-nagruzkoy-kak-gotovyatsya-k-holodam/">Bes.media reported</a> from the same session. Receivables owed to power producers fell 11 per cent to 72 billion tenge, the outlet added.</p>
<p>The winter forecast sits inside a supply plan that runs to 2029. The government plans 13.3 GW of new generating capacity by that year, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">as we reported</a>, and Samruk-Energy's plants produced 29.6 billion kWh in the first nine months of 2026, <a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">above their plan</a>. The ministry said it was monitoring the remaining plant repairs, the non-reducible regulatory fuel reserve and emergency stocks of materials and equipment, with duty crews on standby.</p><p><a href="https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>KEGOC to add 440 MW to southern transit as Kazakhstan targets surplus</title><link>https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029</link><guid isPermaLink="true">https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>The grid operator plans a 500 MW link for western Kazakhstan by December 2027 and expects digital dispatch to save 5.5 billion tenge a year.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029.jpg?v=6c341577" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh grid, KEGOC to add 440 MW in the south</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029.jpg?v=6c341577" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029.jpg?v=6c341577" length="136392" type="image/jpeg"/><content:encoded><![CDATA[<p>KEGOC, Kazakhstan's grid operator, will add 440 MW of throughput to the transit linking Almaty, Zhambyl and Shymkent by July 2027, its chairman Nabi Aitzhanov told a meeting chaired by Prime Minister Olzhas Bektenov, <a href="https://primeminister.kz/en/news/olzhas-bektenov-holds-meeting-on-countrys-electric-power-industry-development-samruk-kazyna-fund-projects-reviewed-32087">the government said</a> on 5 November.</p>
<p>The meeting reviewed power projects of the Samruk-Kazyna sovereign fund. Bektenov cited President Kassym-Jomart Tokayev's declaration of 2027 as the Year of Large-Scale Nationwide Construction and said a sustainable energy surplus by 2029 requires generation, grids and the growth in consumption to move in step. He instructed officials to speed up development of the national electrical grid, told the Ministry of Energy to complete its update of the energy balance by September 2027 and ordered tighter oversight of investment projects in the power sector, the government said.</p>
<p>Aitzhanov said the project to unite the grid of western Kazakhstan with the Unified Power System will raise throughput to 500 MW, with completion in December 2027. A second stage, due in 2035, will close the high-voltage ring. KEGOC also plans upgrades to the Almaty and Zhetysu grids to take power from hydropower plants and new renewable facilities. The Energy Ministry first set out the western link in March as more than 600 km of new 500 kV line, <a href="https://astanatimes.com/2026/03/kazakhstan-to-link-western-regions-to-national-grid-in-major-network-upgrade-by-2027/">The Astana Times reported</a>.</p>
<p>Aitzhanov gave a fuller outlook to a committee of the National Kurultai, <a href="https://www.trend.az/casia/kazakhstan/4242423.html">Trend reported</a> on 3 November. KEGOC expects average annual load growth of 5.6 per cent in 2027 to 2033 and a capacity surplus of 2.8 GW by 2029, including the required reserve, and 5.9 GW by 2035 if the planned generation projects are built. Its investment programme rises from 48.8 billion tenge in 2024 to 181.8 billion tenge in 2026, the agency reported.</p>
<p>KEGOC expects digital technologies and artificial intelligence to yield 5.5 billion tenge a year, about 3 per cent of its EBITDA, through optimised power flows and lower losses. Connecting power plants to automatic frequency and active power control should save about 4 billion tenge a year. The National Dispatch Centre controls all 83 KEGOC substations and tracks more than 50,000 indicators, the government said.</p>
<p>Since the start of the year the North to South line has seen more than 70 sharp load surges, and 95 per cent of them were resolved without cutting power to households. The AI-KEGOC platform forecasts generation and consumption a day ahead across 21 power hubs and 169 renewable facilities, and synchrophasor monitoring raised the throughput of the North to South link by 250 MW without new construction.</p>
<p>Samruk-Energy chairman Ansar Aidarov, <a href="https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman">appointed at the end of October</a>, reported progress on the modernisation of Almaty CHP-2, the reconstruction of Almaty CHP-3, combined heat and power plants in Kokshetau and Semey, the expansion of Ekibastuz GRES-2, combined cycle plants in the Kyzylorda and Turkestan regions, and renewable projects with energy storage and hydropower. The projects form part of the government's plan for 13.3 GW of new capacity by 2029, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">set out in October</a>.</p><p><a href="https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s October power output rises 7.2 per cent on hydro and solar</title><link>https://corridorminerals.com/news/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>Solar plants produced 729.9 million kWh, 39.2 per cent more than a year earlier, while wind output slipped and thermal plants grew 2.3 per cent.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar.jpg?v=53c46c2b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek power output, October output up 7.2 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar.jpg?v=53c46c2b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar.jpg?v=53c46c2b" length="145709" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's power plants generated 7.23 billion kWh of electricity in October, 7.2 per cent more than a year earlier, as hydropower output rose 41.8 per cent and solar plants 39.2 per cent, <a href="https://gov.uz/en/minenergy/news/view/240830">the Ministry of Energy said</a> on 1 November.</p>
<p>Total output was 7,230.2 million kWh, up 482.6 million kWh from 6,747.6 million kWh in October 2025. Thermal plants still produced most of it, 5,449.2 million kWh, 2.3 per cent more than a year earlier. Wind was the only large source to fall, slipping 1.5 per cent to 459.6 million kWh.</p>
<table><thead><tr><th>Electricity, million kWh</th><th>October 2025</th><th>October 2026</th><th>Change</th></tr></thead><tbody><tr><td>Thermal power plants</td><td>5,324.7</td><td>5,449.2</td><td>+2.3%</td></tr><tr><td>Solar power plants</td><td>524.3</td><td>729.9</td><td>+39.2%</td></tr><tr><td>Hydropower plants</td><td>346.8</td><td>491.7</td><td>+41.8%</td></tr><tr><td>Wind power plants</td><td>466.8</td><td>459.6</td><td>-1.5%</td></tr><tr><td>Small-scale solar panels</td><td>79.3</td><td>89.2</td><td>+12.5%</td></tr><tr><td>Small-capacity solar panels</td><td>5.7</td><td>10.7</td><td>+87.7%</td></tr></tbody></table>
<p>Hydropower, solar plants, wind and both classes of small solar panels together supplied 1,781.1 million kWh in October, 24.6 per cent of the total, against 1,422.9 million kWh and 21.1 per cent a year earlier, on a Corridor Minerals calculation from the ministry's figures. Solar plants produced 270.3 million kWh more than wind farms, on the same calculation. The 500 MW Forish solar plant alone had generated 897 million kWh since the start of the year by late October, <a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">as we reported</a>.</p>
<p>October extends the trend of the first nine months. Uzbekistan generated 69.6 billion kWh from January to September, 8.4 per cent more than a year earlier, an Energy Ministry official told a briefing, <a href="https://kun.uz/en/news/2026/10/21/uzbekistans-electricity-generation-rises-84-to-696-billion-kwh-in-nine-months">Kun.uz reported</a>. Large solar and wind plants produced 10.5 billion kWh in the nine months, matching their output for the whole of 2025, and hydropower plants 6.6 billion kWh, above the 6.5 billion kWh of 2025. Adding October gives 76.8 billion kWh for ten months, on a Corridor Minerals calculation.</p>
<p>Thermal plants carry the base load and are being expanded. Talimarjan's two new combined cycle units, with a capacity of 1,065 MW, can generate 8 billion kWh a year, <a href="https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan">as we reported</a>.</p>
<p>Daily figures since the end of October show the seasonal turn. On 9 November output was 246.9 million kWh, 1.1 per cent less than on the same date of 2025, and solar plants produced 5.7 million kWh, 62.5 per cent less, <a href="https://gov.uz/en/minenergy/news/view/245471">the ministry said</a>. It attributed the fall mainly to lower demand: warmer weather cut consumption by 7.6 per cent against the same day last year, when colder air raised heating demand. The ministry's monthly figures, <a href="https://www.trend.az/casia/uzbekistan/4241799.html">also carried by Trend</a>, do not separate block power plants for October.</p><p><a href="https://corridorminerals.com/news/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Samruk-Kazyna tracks 69 projects worth 43.8 trillion tenge</title><link>https://corridorminerals.com/news/samruk-kazyna-69-projects-43-8-trillion-tenge-local-procurement</link><guid isPermaLink="true">https://corridorminerals.com/news/samruk-kazyna-69-projects-43-8-trillion-tenge-local-procurement</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>The fund&#x27;s purchases from Kazakh companies rose 45 per cent to about 1.4 trillion tenge in nine months, and its first coal train ran to Uzbekistan.</description><category>Projects and Deals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/samruk-kazyna-69-projects-43-8-trillion-tenge-local-procurement.jpg?v=0b85811d" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh sovereign fund, 69 projects, 43.8 trillion tenge</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/samruk-kazyna-69-projects-43-8-trillion-tenge-local-procurement.jpg?v=0b85811d" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/samruk-kazyna-69-projects-43-8-trillion-tenge-local-procurement.jpg?v=0b85811d" length="113994" type="image/jpeg"/><content:encoded><![CDATA[<p>Samruk-Kazyna, Kazakhstan's sovereign wealth fund, is carrying out 69 major investment projects worth a combined 43.8 trillion tenge, 44 of them at the construction and assembly stage, <a href="https://primeminister.kz/en/news/prime-minister-olzhas-bektenov-chairs-meeting-of-the-board-of-directors-of-samruk-kazyna-jsc-32083">the government said</a> after Prime Minister Olzhas Bektenov chaired the fund's board of directors on 4 November.</p>
<p>Nurlan Zhakupov, chairman of the fund's management board, reported revenue up 13 per cent and net profit up 19 per cent for the reporting period, with key operational indicators on plan. Oil and gas, petrochemicals and traditional power generation make up the largest share of the portfolio, which also covers gas transmission, energy infrastructure, transport and communications.</p>
<p>Bektenov told the fund and its subsidiaries to tighten control over deadlines after delays in investment project schedules, and placed the timely commissioning of current projects under heightened control, the government said. The projects named for close monitoring are new generating capacity in Turkestan, Kyzylorda, Almaty and Ekibastuz and gas processing plants. They sit inside the government's plan for 13.3 GW of new capacity by 2029, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">as we reported</a>, and several belong to Samruk-Energy, whose management board is now led by <a href="https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman">Ansar Aidarov</a>.</p>
<p>Zhakupov said at a follow-up meeting that every project has an approved schedule, budget, contractors and responsible management, and that unjustified overruns would bring personnel consequences for the heads of portfolio companies, <a href="https://24.kz/ru/news/803960-samruk-kazyna-kontroliruet-realizatsiyu-69-investproektov-pochti-na-44-trln-tenge">24.kz reported</a> on 5 November.</p>
<p>The fund bought about 1.4 trillion tenge of goods, works and services from Kazakh companies in the first nine months, 45 per cent more than a year earlier, and signed off-take contracts worth 73 billion tenge, the government said. Bektenov asked for the share of local content to keep rising.</p>
<p>The board also reviewed projects completed this year. A 380 km fibre-optic line between Kazakhstan and Azerbaijan was commissioned in October, and the fund placed 3 billion yuan of yuan-denominated bonds listed on the Hong Kong Stock Exchange and the Astana International Exchange. The Darbaza to Maktaaral railway line has opened to traffic, and in October the first freight train carrying Kazakh coal left on it for Uzbekistan. The line has 127.6 km of main track, the transport ministry said in September, <a href="https://www.trend.az/casia/kazakhstan/4229253.html">Trend reported</a>.</p><p><a href="https://corridorminerals.com/news/samruk-kazyna-69-projects-43-8-trillion-tenge-local-procurement">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Gulf direct investment in Central Asia rises to US$31.1bn, EDB says</title><link>https://corridorminerals.com/news/edb-gulf-direct-investment-central-asia-31-1bn-power-34-per-cent</link><guid isPermaLink="true">https://corridorminerals.com/news/edb-gulf-direct-investment-central-asia-31-1bn-power-34-per-cent</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>Power now takes 34 per cent of the Gulf stock, up from 2 per cent in 2020, while commodities, the largest sector, fall to 49 per cent.</description><category>Projects and Deals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/edb-gulf-direct-investment-central-asia-31-1bn-power-34-per-cent.jpg?v=ce20c40f" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Gulf capital, Gulf investment in Central Asia reaches US$31.1bn</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/edb-gulf-direct-investment-central-asia-31-1bn-power-34-per-cent.jpg?v=ce20c40f" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/edb-gulf-direct-investment-central-asia-31-1bn-power-34-per-cent.jpg?v=ce20c40f" length="135132" type="image/jpeg"/><content:encoded><![CDATA[<p>The stock of direct investment from the Gulf states in Central Asia rose to US$31.1bn by mid-2026 from US$9.1bn in 2020, the Eurasian Development Bank (EDB) said in an <a href="https://eabr.org/en/analytics/all-publications/trade-and-investment-cooperation-between-central-asia-and-the-gcc-countries/">analytical brief</a> published on 10 November.</p>
<p>The mix has changed as fast as the size. Electric power rose from 2 per cent of the Gulf stock to 34 per cent, a stock of US$10.5bn, while commodities, still the largest sector, fell from 82 per cent to 49 per cent. A third of the Gulf stock now sits in power plants, mostly solar and wind, the EDB says.</p>
<p>Turkmenistan holds the largest stock, US$14.4bn against US$7.3bn in 2020. Uzbekistan rose to US$11.3bn from US$0.4bn, and Kazakhstan to US$5.3bn from US$1.3bn, the brief says.</p>
<p>The United Arab Emirates accounts for US$20.6bn, or 66 per cent of the total. Saudi Arabia follows with US$6.46bn, Qatar with US$3.1bn and Oman with US$924m. ACWA Power makes up more than 95 per cent of Saudi direct investment, mainly in Uzbekistan, where we reported on its <a href="https://corridorminerals.com/news/acwa-power-universal-energy-samarkand-1000-mw-solar-storage-500-mw-wind">1,000 MW solar plant with storage in Samarkand</a>.</p>
<p>In mining, the brief names Ma'aden International Investment as the holder of about 30 per cent of Solidcore Resources, the gold miner in Kazakhstan that is raising <a href="https://corridorminerals.com/news/solidcore-ertis-pox-700-million-debt-package">debt for its Ertis pressure oxidation plant</a>; it gives no amount for the stake. In power, construction of a 1 GW wind plant in Zhambyl region with Masdar began in June 2026 at a cost of about US$1.4bn, the EDB says.</p>
<p>Trade is far smaller than investment, though it has grown faster. Trade between Central Asia and the Gulf rose from US$1bn in 2020 to US$3.9bn in 2025, with Uzbekistan at US$1.75bn, Turkmenistan at US$1.6bn and Kazakhstan at just over US$300m; Kyrgyzstan traded US$185m and Tajikistan US$107m. The bank puts additional trade potential at US$4.9bn by 2030.</p>
<p>The brief came out as the EDB presented the region to Gulf investors at an Investor Day in Abu Dhabi, where its chairman, Nikolai Podguzov, said Gulf investment in Central Asia had grown 3.4-fold since 2020, and four memoranda of understanding were signed, according to the <a href="https://eabr.org/en/press/detail/eabr-predstavil-investitsionnyy-potentsial-tsentralnoy-azii-investoram-stran-persidskogo-zaliva-na-e/">bank's release</a>. The EDB's own portfolio held 348 projects with total investment of US$22.1bn at the end of June 2026, the release says.</p>
<p>The power money arrives as the region works on its grid: last month the EDB found that only part of Central Asia's installed capacity was <a href="https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained">available at peak demand</a>, the constraint that matters for energy-intensive mines and smelters.</p>
<p>Method: figures are the EDB's, from its brief and its <a href="https://eabr.org/en/press/detail/trade-between-central-asia-and-the-gulf-states-has-surged-by-almost-four-times-while-investment-has-/">press release</a> of 10 November. Investment is a stock at mid-2026; trade is for calendar years.</p><p><a href="https://corridorminerals.com/news/edb-gulf-direct-investment-central-asia-31-1bn-power-34-per-cent">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Erdene puts Bayan Khundii&#x27;s all-in sustaining cost at US$1,848 an ounce</title><link>https://corridorminerals.com/news/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results</link><guid isPermaLink="true">https://corridorminerals.com/news/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>Cash costs were US$1,742 an ounce in the third quarter against a realised price of US$4,313, and Erdene swung to a C$9.6m profit.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results.jpg?v=f69b8e12" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Mongolian gold, Bayan Khundii&#x27;s cost: US$1,848 an ounce</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results.jpg?v=f69b8e12" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results.jpg?v=f69b8e12" length="136677" type="image/jpeg"/><content:encoded><![CDATA[<p>Erdene Resource Development said Bayan Khundii, the Mongolian gold mine in which it holds a 50 per cent economic interest, ran at an all-in sustaining cost of US$1,848 an ounce in the third quarter, in <a href="https://www.globenewswire.com/news-release/2026/11/04/3395934/0/en/erdene-announces-q3-2026-results.html">results</a> published on 4 November.</p>
<p>Cash costs were US$1,742 an ounce, and total cost of sales was US$23m, or US$1,942 an ounce, the company said. The mine's operator, Erdene Mongol, its joint venture with Mongolian Mining Corporation, realised a weighted average price of US$4,313 an ounce on 11,853 ounces produced and sold, so the all-in cost was less than half the price. Erdene's <a href="https://www.globenewswire.com/news-release/2026/10/19/3383273/0/en/erdene-provides-q3-2026-update-and-notice-of-conference-call-and-webcast.html">quarterly update</a> of 19 October had given the price as US$4,315, as <a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">we reported</a>.</p>
<p>The margin turned into profit. Erdene recorded net income of C$9.6m for the three months to 30 September, against a net loss of C$2.7m a year earlier, the results show.</p>
<p>The mine moved 415,000 tonnes of ore at an average grade of 1.25 grams of gold a tonne, and the plant processed 164,000 tonnes, an average of 1,788 tonnes a day. Erdene Mongol had US$19m of cash at the end of the quarter and US$93m of debt outstanding, and the company bought back and cancelled 130,300 shares during the quarter.</p>
<p>Exploration is the next call on that cash. Erdene launched a 16,500 metre drill programme and a deep geophysical survey across its Khundii Minerals District, with 3,000 metres of drilling for the Dark Horse and Altan Arrow area, the company said. Its other Mongolian asset, the Zuun Mod molybdenum and copper project, has a <a href="https://corridorminerals.com/news/erdene-zuun-mod-pea-molybdenum-copper-mongolia">preliminary economic assessment</a> published in October.</p>
<p>Method: costs, the realised price and profit are from Erdene's third quarter results; cost and tonnage figures are for the mine as a whole. The results give no numerical guidance for the fourth quarter.</p><p><a href="https://corridorminerals.com/news/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan plans to double uranium output to 15,000 tonnes by 2030</title><link>https://corridorminerals.com/news/uzbekistan-uranium-output-15000-tonnes-2030-navoiyuran-critical-metals</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-uranium-output-15000-tonnes-2030-navoiyuran-critical-metals</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>Output is put at 7,500 tonnes this year, and a review of state metals plans puts the value of 16 key metals above $2.7bn by 2030.</description><category>Critical Minerals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-uranium-output-15000-tonnes-2030-navoiyuran-critical-metals.jpg?v=a16936dd" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan uranium, Uranium goal doubles to 15,000 tonnes</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-uranium-output-15000-tonnes-2030-navoiyuran-critical-metals.jpg?v=a16936dd" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-uranium-output-15000-tonnes-2030-navoiyuran-critical-metals.jpg?v=a16936dd" length="134518" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's uranium output is to double to 15,000 tonnes by 2030 from 7,500 tonnes this year, under plans for the state producer Navoiyuran reviewed by President Shavkat Mirziyoyev, <a href="https://president.uz/en/lists/view/9822">the presidential website said</a> on 5 November.</p>
<p>The same review covered Uzbekistan Technological Metals Complex, which already develops five metals including tungsten and molybdenum. Under the plans reviewed, the production value of 16 key metals is to exceed $2.7bn by 2030, and tungsten deep-processing projects are to bring $1.1bn of investment and raise output to nearly $2.2bn by the end of the decade, the page says.</p>
<p>For utilities that buy Central Asian uranium and for traders in tungsten and the minor metals, the review sets out how far the state wants its two specialist producers to grow. The page gives no list of projects, no financing plan and no timetable for individual plants.</p>
<h2>Uranium reserves and a change of reagent</h2>
<p>Navoiyuran's explored reserves are to reach 200,000 tonnes, and the company is to create 250 new jobs this year, the page says. The plans also give reagents that replace sulphuric acid a 40 per cent share by 2030, without naming the replacement. Sulphuric acid is a cost that matters in the region: Kazatomprom named higher sulphuric acid costs among the reasons its costs rose in the first half, Corridor Minerals reported in <a href="https://corridorminerals.com/news/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025">its October note on uranium supply</a>.</p>
<p>The page frames the expansion with demand figures. Global uranium demand rose by between 15 and 20 per cent in recent years and is expected to grow by another 28 per cent by 2030, it says, without naming the source of the estimate.</p>
<p>Uzbekistan is already a supplier to Western reactors. It provided 7 per cent of the uranium delivered to US civilian reactor owners in 2025 and 10.37 per cent of the natural uranium bought by EU utilities, US and Euratom data show, as the same October note set out. The page does not say whether the 15,000 tonne goal is measured as uranium or as uranium oxide concentrate, or where the extra output would be sold.</p>
<h2>Sixteen metals and a tungsten chain</h2>
<p>Demand for critical minerals grows by 10 per cent a year, against 1 per cent for traditional metals, the page says. Five metals are already in development at the technological metals company: tungsten, molybdenum, selenium, tellurium and rhenium. Production of 11 more is to be established, among them nickel, cobalt, graphite, antimony and tin.</p>
<p>The technological metals company plans to launch 12 investment projects by the end of this year, the page says, without giving their cost. In June, a briefing on the critical minerals programme put a first tranche of 12 projects for 2026 at $166 million, within a programme of 120 projects worth $4.2 billion to 2030, Corridor Minerals reported in <a href="https://corridorminerals.com/news/uzbekistan-4-2-billion-critical-minerals-programme-explained">its explainer on the programme</a>. The November page does not say whether the two sets of 12 are the same.</p>
<p>Mirziyoyev told officials to speed up critical minerals projects, make sure investment projects are carried out on time, strengthen the mineral base, commission new plants, raise output of high value-added products and increase exports, the page says.</p>
<h2>A target first set in March</h2>
<p>The 15,000 tonne goal is not new. In March, at the launch of the third copper processing plant at Almalyk, Mirziyoyev listed 2030 targets of 175 tonnes of gold, 500 tonnes of silver, 15,000 tonnes of uranium and 500,000 tonnes of copper, <a href="https://dunyo.info/en/prezident/prezident-uzbekistana-s-pervyh-dney-nashih-reform-my-udelili-osoboe">the Dunyo news agency reported</a>. A meeting at Almalyk on the same day set a 2026 plan for the sector of 8,000 tonnes of uranium, <a href="https://yuz.uz/en/news/prezident-rahbarligida-sanoat-kengashi-tuziladi">Yuz News reported</a>. The November page gives 7,500 tonnes for this year and does not explain the difference.</p>
<p>The copper side of that March programme is further along. The Almalyk plant opened then cost $2.7bn and can process 60 million tonnes of ore a year, Dunyo reported, while uranium and the minor metals were still at the planning stage.</p>
<p>What the review adds is the path for the two companies that would deliver the uranium and minor metals goals: a reserve target for Navoiyuran, a change of leaching reagent, and a widening of the technological metals company's list from five metals to 16. None of the documents gives the cost of the uranium expansion or the names of the deposits it would draw on.</p><p><a href="https://corridorminerals.com/news/uzbekistan-uranium-output-15000-tonnes-2030-navoiyuran-critical-metals">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Entrée closes C$36.2m placement as licence transfer waits on tax papers</title><link>https://corridorminerals.com/news/entree-closes-36-2m-placement-oyu-tolgoi-licence-transfer-tax-documents</link><guid isPermaLink="true">https://corridorminerals.com/news/entree-closes-36-2m-placement-oyu-tolgoi-licence-transfer-tax-documents</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>The Oyu Tolgoi partner raised more than the C$31.9m it first planned, while Mongolia&#x27;s tax authority calls its licence valuation documents incomplete.</description><category>Projects and Deals</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/entree-closes-36-2m-placement-oyu-tolgoi-licence-transfer-tax-documents.jpg?v=7b139309" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Entrée Resources, Placement closes at C$36.2m</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/entree-closes-36-2m-placement-oyu-tolgoi-licence-transfer-tax-documents.jpg?v=7b139309" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/entree-closes-36-2m-placement-oyu-tolgoi-licence-transfer-tax-documents.jpg?v=7b139309" length="129968" type="image/jpeg"/><content:encoded><![CDATA[<p>Entrée Resources closed a non-brokered private placement of 12,485,300 units at C$2.90 each on 4 November, raising gross proceeds of C$36,207,370, the company said in <a href="https://investingnews.com/entree-resources-announces-third-quarter-2026-results/">its third-quarter results</a> a day later.</p>
<p>That is more than the up to C$31.9 million Entrée planned when it announced the placement on 20 October, <a href="https://corridorminerals.com/news/entree-resources-tether-affiliate-placement-oyu-tolgoi-licences">as Corridor Minerals reported then</a>. The placement was oversubscribed, and Entrée raised an additional C$4.3 million because of strong demand, it said in <a href="https://investingnews.com/entree-resources-closes-oversubscribed-36-2-million-financing/">its closing release</a>. A substantial component of the placement went to a new strategic investor, an affiliate of the Tether group of companies, the results release says, without giving the number of units it took.</p>
<p>The money arrives while the step that matters most for Entrée's two licences on the Oyu Tolgoi copper and gold project in Mongolia is still open. The Shivee Tolgoi and Javkhlant licences must be transferred from Entrée LLC to Oyu Tolgoi LLC before Lift 1 Panel 1 lateral development on Shivee Tolgoi can go ahead, the release says, and the transfer is waiting on tax payment certificates.</p>
<p>Entrée holds a 20 per cent or 30 per cent carried interest in the joint venture that covers the two licences, depending on the depth of the mineralisation, and Oyu Tolgoi LLC holds the rest. Rio Tinto owns 66 per cent of Oyu Tolgoi LLC and manages the operation, the release says.</p>
<h2>Tax certificates and a new working group</h2>
<p>In the third quarter the Mongolian Tax Authority said the valuation documents Entrée LLC had submitted were incomplete, so it could not issue the tax payment certificates needed to register the transfer with the Mineral Resources and Petroleum Authority, according to the release. The release also cites Rio Tinto's disclosure that in June 2026 the Government of Mongolia agreed to commence work on the licence transfer for Panel 1.</p>
<p>A second question is the state's share. Under Mongolia's Minerals Law the state may, without compensation, hold an equity interest of up to 34 per cent in a deposit of strategic importance, and the boundaries of the Oyu Tolgoi strategic deposit include Entrée's licences, the release says. Parliament approved Resolution No. 120 on 26 December 2025. On 25 March 2026 Entrée delivered a non-binding proposal to the Minister of Industry and Mineral Resources, who then headed the Government Working Group, to transfer the licences to Oyu Tolgoi LLC and pay a royalty in place of the 34 per cent stake. Entrée says it did not receive a formal response from that minister.</p>
<p>From 2 October the Minister of Justice and Internal Affairs leads the working group, and Entrée expects discussions with the reconstituted group to commence shortly, the release says.</p>
<h2>Copper next door and drilling on the licences</h2>
<p>The mine the licences adjoin is growing. Oyu Tolgoi produced 114,000 tonnes of copper in concentrates in the third quarter, up 27 per cent on a year earlier, and 312,000 tonnes in nine months, up 29 per cent, Rio Tinto said in <a href="https://www.sec.gov/Archives/edgar/data/0000863064/000086306426000041/ex1prodresults.htm">its third-quarter production results</a> on 14 October. The operation ran at an annualised rate of about 450,000 tonnes in the quarter, and the ramp-up remains on track for an average of around 500,000 tonnes a year from 2028 to 2036, Rio Tinto said. Corridor Minerals covered the quarter in <a href="https://corridorminerals.com/news/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up">its report on the underground ramp-up</a>.</p>
<p>Oyu Tolgoi LLC drilled two holes at Ulaan Khud South on Shivee Tolgoi and two at Southwest Heruga on Javkhlant, and reports, from core logging, that none of them intersected meaningful copper mineralisation in the target units, the release says. One hole at Ulaan Khud South stopped short of its target depth because of drilling conditions, so the deeper northern extension is still untested. Drilling ended by 15 October and final assays are pending. An updated Lift 1 mine plan and production schedule is expected in the second half of 2026, and Entrée targets an updated technical report for the first quarter of 2027.</p>
<p>The placement changes the company's scale. At 30 September, before it closed, Entrée had cash of US$2.5 million and working capital of US$2.5 million. Its operating loss was US$1.0 million in the third quarter, against US$0.6 million a year earlier, and US$2.3 million in nine months, against US$1.9 million. Royal Gold, through International Royalty Corporation, holds about 23 per cent of Entrée's shares and Rio Tinto about 15 per cent, the release says, against about 24 per cent and 16 per cent in the October placement announcement.</p><p><a href="https://corridorminerals.com/news/entree-closes-36-2m-placement-oyu-tolgoi-licence-transfer-tax-documents">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan aims to double uranium output, a source EU utilities use</title><link>https://corridorminerals.com/news/uzbekistan-uranium-goal-eu-utilities-supply-analysis</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-uranium-goal-eu-utilities-supply-analysis</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>Uzbek uranium was a tenth of EU utilities&#x27; 2025 purchases. A goal of 15,000 tonnes by 2030 changes buyers&#x27; options, if it is financed.</description><category>Analysis</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-uranium-goal-eu-utilities-supply-analysis.jpg?v=1193dc40" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Analysis, Uzbek uranium goal and EU buyers</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-uranium-goal-eu-utilities-supply-analysis.jpg?v=1193dc40" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-uranium-goal-eu-utilities-supply-analysis.jpg?v=1193dc40" length="130928" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan wants to double its uranium output to 15,000 tonnes by 2030 from 7,500 tonnes this year, under plans reviewed by President Shavkat Mirziyoyev, <a href="https://president.uz/en/lists/view/9822">the presidential website said</a> on 5 November. The country supplied a tenth of the uranium EU utilities bought in 2025.</p>
<p>Drill Core reads what the goal changes for three readers: the fuel manager at a utility, the operator of a leaching mine in Central Asia and the regulator that watches where Europe's uranium comes from. The short answer is that the plan would make Uzbekistan a supplier of a different size, but the documents published so far leave out the facts a buyer would need to count on it.</p>
<h2>For fuel buyers, a larger second source</h2>
<p>EU utilities bought 14,678 tonnes of uranium in 2025, and Uzbekistan supplied 1,522 tonnes of it, 10.37 per cent, <a href="https://euratom-supply.ec.europa.eu/activities/market-observatory_en">Euratom Supply Agency data show</a>. That was more than six times its 2024 volume, a rise of 511.83 per cent. Canada supplied 5,384 tonnes, Kazakhstan 2,981 tonnes, Russia 2,346 tonnes and Australia 1,379 tonnes. In the US, Uzbekistan was the origin of 7 per cent of the uranium delivered to civilian reactor owners in 2025, <a href="https://www.eia.gov/uranium/marketing/">the Energy Information Administration reports</a>.</p>
<p>A producer of 15,000 tonnes would be about half the size of Kazatomprom's planned 2026 output. Kazatomprom's guidance for 2026 is 27,500 to 29,000 tonnes of uranium on a 100 per cent basis, its first-half results show, so the Uzbek goal equals about 53 per cent of the midpoint on Drill Core's arithmetic. For a fuel manager, that would mean a second Central Asian source about half Kazatomprom's size, though the Uzbek figure is a target for 2030 and Kazatomprom's is guidance for 2026.</p>
<p>The data stop short of telling a buyer how much of that would be available. The Euratom figures are by country of origin, not by supplier or contract, and neither source explains why Uzbekistan's EU volume jumped in 2025, as <a href="https://corridorminerals.com/news/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025">Corridor Minerals noted in October</a>. The presidential page does not say whether the 15,000 tonne goal is measured as uranium or as uranium oxide concentrate, which changes the comparison by about 18 per cent on Drill Core's arithmetic, and it names no buyers, contracts or deposits.</p>
<h2>For operators, the acid question</h2>
<p>The plan's most specific operational line is about chemistry. Reagents that replace sulphuric acid are to take a 40 per cent share by 2030, the page says, without naming them. Costs are where an operator would look first: Kazatomprom's all-in sustaining cost rose 25 per cent to $38.45 a pound in the first half, its results show. Whether the reagent change lowers Navoiyuran's costs is not stated, because the page gives no cost figures.</p>
<p>Reserves are the other operational point. Explored reserves are to reach 200,000 tonnes, the page says, which at 15,000 tonnes a year would last about 13 years on Drill Core's arithmetic, before any further discoveries. The page does not give the current reserve figure.</p>
<h2>For regulators, a target with no published plan</h2>
<p>The 15,000 tonne goal was already listed in March, when Mirziyoyev opened Almalyk's third copper processing plant and set 2030 targets for gold, silver, uranium and copper, <a href="https://dunyo.info/en/prezident/prezident-uzbekistana-s-pervyh-dney-nashih-reform-my-udelili-osoboe">the Dunyo news agency reported</a>. Eight months later the target stands, but neither document gives an investment figure for the uranium expansion or a timetable by deposit. For an agency that tracks how diversified Europe's supply is, a target is a reason to watch the annual purchase data, not yet a volume to count on.</p>
<p>The page frames the plan with a forecast that uranium demand will grow by another 28 per cent by 2030, without naming its source. The next checks are the Euratom figures for 2026 purchases and any Uzbek document that ties the goal to named deposits and money. Until then, the doubling is a stated intention backed by a reserve target and a change of reagent.</p><p><a href="https://corridorminerals.com/news/uzbekistan-uranium-goal-eu-utilities-supply-analysis">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazatomprom lifts group uranium sales 25 per cent in the third quarter</title><link>https://corridorminerals.com/news/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price</link><guid isPermaLink="true">https://corridorminerals.com/news/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>The group realised $81.50 a pound, still $7.06 below spot, and kept its 2026 output and sales guidance unchanged after nine months.</description><category>Critical Minerals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price.jpg?v=25933413" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uranium, Kazatomprom third-quarter sales and prices</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price.jpg?v=25933413" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price.jpg?v=25933413" length="139880" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazatomprom's group sold 6,444 tonnes of uranium in the third quarter, 25 per cent more than a year earlier, at an average realised price of $81.50 a pound, the Kazakh uranium miner said in <a href="https://www.kazatomprom.kz/en/media/view/operatsionnie_rezultati_deyatelnosti_ao_nak_kazatomprom_za_3i_kvartal_2026_goda">its trading update</a> on 3 November.</p>
<p>The update shows output running ahead of last year and prices catching up with the market without yet matching it. The group's realised price rose 18 per cent on the year, while the average month-end spot price was $88.56, a gap of $7.06 a pound on Corridor Minerals' arithmetic. Kazatomprom kept every 2026 guidance figure unchanged.</p>
<h2>Output runs ahead of last year</h2>
<p>Production on a 100 per cent basis, which counts the full output of every mine in which Kazatomprom holds a stake, rose 10 per cent to 20,508 tonnes in the nine months to 30 September, from 18,709 tonnes a year earlier. The company's attributable share rose 12 per cent to 10,969 tonnes.</p>
<p>The third quarter alone brought 7,216 tonnes on a 100 per cent basis, up 12 per cent. That was above the pace of the first half, when the group produced 13,291 tonnes, <a href="https://world-nuclear-news.org/articles/mid-year-updates-from-major-uranium-producers">World Nuclear News reported</a> in August, or about 6,646 tonnes a quarter.</p>
<p>Production guidance for 2026 stays at 27,500 to 29,000 tonnes on a 100 per cent basis and 14,500 to 15,500 tonnes attributable. To reach it the group needs between 6,992 and 8,492 tonnes in the fourth quarter on a 100 per cent basis, on Corridor Minerals' arithmetic, a span that takes in the third quarter's 7,216 tonnes.</p>
<p>The resource base is also growing. In the third quarter Kazatomprom received an exploration licence for the Kyzyltu block on 21 September, with a preliminary resource of about 10,000 tonnes of uranium, the update said.</p>
<h2>Group sales rise as the parent's own sales fall</h2>
<p>Group sales reached 14,030 tonnes in the nine months, up 10 per cent from 12,776 tonnes. Sales by Kazatomprom itself, which form part of the group figure, fell seven per cent to 10,303 tonnes. The company said the group's gain came mainly from higher output at its joint ventures and the timing of delivery requests from their other participants, while its own sales reflected delivery schedules.</p>
<p>The parent's own sales target of 13,100 to 14,100 tonnes means 2,797 to 3,797 tonnes in October to December on Corridor Minerals' arithmetic, below the 4,220 tonnes it sold in the third quarter. Group sales guidance of 19,500 to 20,500 tonnes leaves 5,470 to 6,470 tonnes for the same three months.</p>
<p>For fuel buyers, one supply line is already spoken for: the 2026 output of the Budenovskoye joint venture is fully committed under an offtake contract at market-related terms, the update said. Corridor Minerals set out in October <a href="https://corridorminerals.com/news/who-owns-kazakhstan-uranium-kazatomprom-partners">who holds stakes in Kazatomprom's mines</a>.</p>
<h2>Realised prices stay below spot</h2>
<p>In the third quarter Kazatomprom's own realised price was $79.45 a pound, below the group's $81.50. For the nine months, the group's average realised price was $73.51 a pound, up 17 per cent, against an average month-end spot price of $87.41. Realised prices follow spot, the company said, but some long-term contracts carry fixed components and price ceilings agreed when prices were lower. The long-term uranium price reached a record $96.50 a pound in August, the update said, citing third-party data.</p>
<p>Cost guidance is unchanged too: a C1 cash cost of $25.50 to $27.00 a pound on an attributable basis and an all-in sustaining cost of $39.00 to $40.50. Those figures assume 490 tenge to the dollar, while the market rate was about 453 tenge when the update came out, <a href="https://forbes.kz/articles/skolko-urana-prodal-kazatomprom-v-2026-godu-1f4507">Forbes Kazakhstan reported</a>. The company said revenue and cost results may move with the exchange rate and the spot price. Moody's raised its baseline credit assessment of the miner in September, as <a href="https://corridorminerals.com/news/moodys-upgrades-kazatomprom-baseline-credit-assessment-baa2">Corridor Minerals reported</a>.</p><p><a href="https://corridorminerals.com/news/kazatomprom-group-uranium-sales-rise-25-per-cent-q3-2026-realised-price">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh zinc smelters cut output 12.7 per cent as feed imports drop</title><link>https://corridorminerals.com/news/kazakhstan-zinc-metal-output-falls-12-7-per-cent-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-zinc-metal-output-falls-12-7-per-cent-nine-months-2026</guid><pubDate>Wed, 04 Nov 2026 00:00:00 +0000</pubDate><description>Raw zinc fell to 169,281 tonnes in nine months though zinc in concentrate rose 1.5 per cent; Glencore cites scarce outside feed.</description><category>Metals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-zinc-metal-output-falls-12-7-per-cent-nine-months-2026.jpg?v=9f50650c" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh zinc, Smelters make less zinc</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-zinc-metal-output-falls-12-7-per-cent-nine-months-2026.jpg?v=9f50650c" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-zinc-metal-output-falls-12-7-per-cent-nine-months-2026.jpg?v=9f50650c" length="105792" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's smelters produced 169,281 tonnes of raw zinc in the first nine months of 2026, 12.7 per cent less than a year earlier, the Bureau of National Statistics said in an <a href="https://stat.gov.kz/api/iblock/element/413699/file/en/">industry table</a> published on 16 October.</p>
<p>Zinc from the country's mines did not fall. Zinc contained in concentrate rose 1.5 per cent to 195.3 thousand tonnes over the same nine months, the table shows. Zinc metal output was 18,893 tonnes in September, against 17,574 tonnes in August and 20,181 tonnes in September 2025.</p>
<p>Imported feed did fall. A separate bureau <a href="https://stat.gov.kz/api/iblock/element/413816/file/en/">product balance table</a>, published on 20 October, puts imports of zinc ores and concentrates at 89.8 thousand tonnes from January to August, 10.9 per cent less than a year earlier. The same table puts production of zinc ores and concentrates at 662.7 thousand tonnes, 10.8 per cent less, without giving their zinc content. Exports of raw zinc were 138,056 tonnes in the eight months, 6.3 per cent less than a year earlier, and took 91.8 per cent of the zinc available.</p>
<p>Glencore's figures for Kazzinc, part of its zinc business, show a similar fall. Its <a href="https://www.glencore.com/.rest/api/v1/documents/static/7ed50c65-7d84-4cc1-a2c4-216060583297/GLEN_2026-Q3_ProductionReport.pdf">third quarter production report</a> puts Kazzinc's total smelter output, including third-party feed, at 162,600 tonnes of zinc metal in the first nine months, 12 per cent less than a year earlier. Own sourced zinc production fell 5 per cent to 142,400 tonnes, "primarily due to limited availability of high-quality third-party concentrates for blending, which reduced the rate at which the smelters could process own sourced material", the report says.</p>
<table><thead><tr><th>Kazzinc total smelter zinc metal</th><th>Thousand tonnes</th></tr></thead><tbody><tr><td>Third quarter 2025</td><td>63.3</td></tr><tr><td>Fourth quarter 2025</td><td>66.4</td></tr><tr><td>First quarter 2026</td><td>48.8</td></tr><tr><td>Second quarter 2026</td><td>58.6</td></tr><tr><td>Third quarter 2026</td><td>55.2</td></tr></tbody></table>
<p>Kazzinc's nine-month figure equals 96 per cent of the bureau's national total, on a Corridor Minerals calculation; the company and the bureau count production on their own definitions, so the two are not strictly comparable. Third-quarter zinc metal was 6 per cent below the second quarter, Glencore's table shows.</p>
<p>Lead moved differently. Kazzinc's total lead metal rose 6 per cent to 60,600 tonnes in nine months, while the bureau puts the country's raw refined lead output at 61,233 tonnes, 5.1 per cent less than a year earlier. Own sourced lead fell 19 per cent to 23,200 tonnes, for the same reason as zinc, Glencore said. The gold side of Kazzinc is covered in <a href="https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026">our report on the ATK mine</a>, and the bureau's wider nine-month figures for the sector in <a href="https://corridorminerals.com/news/kazakhstan-metallurgy-mining-output-nine-months-2026">our earlier piece</a>.</p><p><a href="https://corridorminerals.com/news/kazakhstan-zinc-metal-output-falls-12-7-per-cent-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh coal sales at home fall 3.6 per cent as exports grow</title><link>https://corridorminerals.com/news/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026</guid><pubDate>Wed, 04 Nov 2026 00:00:00 +0000</pubDate><description>Exports took 27.4 per cent of the coal available in eight months, and the price index for coal and coke storage rose 31.1 per cent in a quarter.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026.jpg?v=a7a45acc" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh coal, Less coal sold at home</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026.jpg?v=a7a45acc" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026.jpg?v=a7a45acc" length="114844" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan sold 53.15 million tonnes of coal at home from January to August, 3.6 per cent less than a year earlier, while exports rose 3.2 per cent to 20.10 million tonnes, the national statistics bureau said in a <a href="https://stat.gov.kz/api/iblock/element/413816/file/en/">balance table</a> on 20 October.</p>
<p>Production of hard coal and lignite fell 1.9 per cent to 72.69 million tonnes and imports rose 4.6 per cent to 560,522 tonnes, the table shows. Exports took 27.4 per cent of the coal available, against 26.1 per cent a year earlier on a Corridor Minerals calculation.</p>
<table><thead><tr><th>Hard coal and lignite, thousand tonnes</th><th>January to August 2025</th><th>January to August 2026</th><th>Change</th></tr></thead><tbody><tr><td>Production</td><td>74,100.9</td><td>72,689.4</td><td>-1.9%</td></tr><tr><td>Imports</td><td>535.8</td><td>560.5</td><td>+4.6%</td></tr><tr><td>Exports</td><td>19,473.6</td><td>20,095.4</td><td>+3.2%</td></tr><tr><td>Sales on the domestic market</td><td>55,163.1</td><td>53,154.5</td><td>-3.6%</td></tr></tbody></table>
<p>The mix of output is changing. The bureau's <a href="https://stat.gov.kz/api/iblock/element/413699/file/en/">industry table</a>, published on 16 October, puts coal production, including concentrate, at 82.41 million tonnes for the first nine months, 1.9 per cent less than a year earlier. Within it, high-ash steam coal fell 6.3 per cent to 49.65 million tonnes, while steam coal of higher calorific value rose 8.1 per cent to 15.20 million tonnes and coking coal 7.0 per cent to 6.27 million tonnes.</p>
<p>The bureau also counts what was not shipped. Industrial enterprises held 7.70 million tonnes of coal unshipped at the end of September, after shipping 25.87 million tonnes in the third quarter, the bureau's <a href="https://stat.gov.kz/api/iblock/element/413702/file/en/">shipment and balances table</a> of 28 October shows. The table gives no earlier balance, so the change in stocks cannot be read from it, as with the ferroalloy stocks in <a href="https://corridorminerals.com/news/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026">our report on the same table</a>.</p>
<p>Storing it has become dearer. The bureau's producer price index for coal and coke storage services rose 31.1 per cent in the third quarter from the second and 34.1 per cent from the third quarter of 2025, its <a href="https://stat.gov.kz/api/iblock/element/413892/file/en/">services price table</a> of 27 October shows. Cargo handling services rose 3.5 per cent from the second quarter. The table gives no reason for the rise.</p>
<p>Where the exported coal goes, and at what declared value, is in <a href="https://corridorminerals.com/news/kazakhstan-coal-exports-eu-poland-russia-values-2026">our report on the trade tables</a>. The bureau marks the balance figures as preliminary; shares above are Corridor Minerals calculations from its figures in thousand tonnes.</p><p><a href="https://corridorminerals.com/news/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Talimarjan&#x27;s new 1,065 MW gas units can generate 8 billion kWh a year</title><link>https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan</link><guid isPermaLink="true">https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan</guid><pubDate>Tue, 03 Nov 2026 00:00:00 +0000</pubDate><description>The US$944.87m expansion, lent by ADB, EBRD and Uzbekistan&#x27;s reconstruction fund, is meant to save 300 million cubic metres of gas a year.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan.jpg?v=1d5a609e" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek power, Talimarjan adds 1,065 MW of gas power</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan.jpg?v=1d5a609e" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan.jpg?v=1d5a609e" length="135612" type="image/jpeg"/><content:encoded><![CDATA[<p>Talimarjan Thermal Power Plant's two new combined cycle units, with a capacity of 1,065 MW, can generate 8 billion kWh of electricity a year, <a href="https://tpp.uz/oz/news/yangi-investitsiya-loyihasi-zamonaviy-energetikada-yangi-ishlab-chiqarish-yechimlari">Thermal Power Plants JSC said</a> on 29 October after a press tour of the site for journalists.</p>
<p>The project cost US$944.87m and was financed with loans from the Asian Development Bank, the European Bank for Reconstruction and Development and the Fund for Reconstruction and Development of Uzbekistan, the company said in its Uzbek-language release. Spain's Intesa Ingenieria Industrial, as the release names it, Japan's Mitsubishi Corporation and Türkiye's Çalık Energy took part in construction. The units were put into operation in December 2025, at a ceremony at the International Congress Centre attended by President Shavkat Mirziyoyev, the release says.</p>
<p>Each of the gas turbines installed has a capacity of 367.4 MW and the steam turbine 185.7 MW, the company said; the release does not set out how the turbines make up the 1,065 MW. A new 500 kV open switchyard carries the output into the national grid. Higher efficiency is meant to save 300 million cubic metres of natural gas a year, and the project created 100 to 120 jobs, the release says. It rests on a presidential resolution on expanding the plant with two more combined cycle units of not less than 900 MW.</p>
<p>The lenders set the targets years ago. The ADB's board approved a $450 million loan on 13 December 2017 for a project to add 850 to 950 MW of combined cycle capacity at Talimarjan, raising the plant's aggregate capacity to approximately 2,600 MW and its thermal efficiency from 48 per cent to 52 per cent, the <a href="https://www.adb.org/news/adb-loan-help-modernize-power-generation-uzbekistan">bank said</a> at the time. In January 2019 the <a href="https://www.ebrd.com/home/news-and-events/news/2019/ebrd-invests-in-modern-power-generation-in-uzbekistan.html">EBRD announced a loan of up to US$240m</a> to JSC Uzbekenergo for at least 900 MW of combined cycle gas turbines at the plant, co-financed with the ADB and the reconstruction fund, and said the design aimed to cut carbon intensity to around 350 kg of CO2 per MWh, approximately half the average of Uzbekistan's power sector.</p>
<p>Thermal plants still carry the system. Uzbekistan generated 254.9 million kWh of electricity on 30 October, 13.2 per cent more than a year earlier, of which thermal power plants produced 200.9 million kWh, the energy ministry said in its <a href="https://t.me/minenergy_uz/21551">daily figures</a>. Solar plants produced 22.1 million kWh, hydropower plants 18.7 million kWh, wind farms 10.0 million kWh and block stations 2.9 million kWh. On those figures thermal plants supplied about 79 per cent of the day's output, on a Corridor Minerals calculation.</p>
<p>Gas, the fuel of the new Talimarjan units, is becoming scarcer. Large enterprises produced 27.0 billion cubic metres of natural gas in January to September, against 32.3 billion a year earlier, as set out in <a href="https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026">our report on the nine-month figures</a>, which gives weight to the gas savings the plant claims. Renewables are growing beside them: the 500 MW Forish solar plant generated 897 million kWh this year to late October, as <a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">we reported</a>.</p>
<p>The release does not say how much of the new units' output has been generated since December 2025 or what tariff the plant receives.</p><p><a href="https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Ferro-Alloy Resources names Peter Secker its chief executive</title><link>https://corridorminerals.com/news/ferro-alloy-resources-peter-secker-chief-executive-balasausqandiq-vanadium</link><guid isPermaLink="true">https://corridorminerals.com/news/ferro-alloy-resources-peter-secker-chief-executive-balasausqandiq-vanadium</guid><pubDate>Tue, 03 Nov 2026 00:00:00 +0000</pubDate><description>A mine builder the company says has raised more than US$2bn takes over the Kazakh vanadium developer, which had US$0.5m of cash at the end of August.</description><category>Critical Minerals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/ferro-alloy-resources-peter-secker-chief-executive-balasausqandiq-vanadium.jpg?v=45260531" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh vanadium, A new chief for Balasausqandiq</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/ferro-alloy-resources-peter-secker-chief-executive-balasausqandiq-vanadium.jpg?v=45260531" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/ferro-alloy-resources-peter-secker-chief-executive-balasausqandiq-vanadium.jpg?v=45260531" length="124293" type="image/jpeg"/><content:encoded><![CDATA[<p>Ferro-Alloy Resources has appointed Peter Secker chief executive with immediate effect as its Balasausqandiq vanadium project in southern Kazakhstan heads for engineering, the London-listed company <a href="https://www.investegate.co.uk/announcement/rns/ferro-alloy-resources-limited-npv--far/appointment-of-chief-executive-officer/9840014">said on 26 October</a>.</p>
<p>Secker has more than 40 years of experience in the resources sector, has raised more than US$2 billion as chief executive of several listed companies and has brought five greenfield projects into production, the company said. The company's listing rule disclosure lists him as a former director of Bacanora Lithium, delisted in January 2022, and of Zinnwald Lithium, from which he resigned in July 2026, and as a current non-executive director of McLaren Minerals. Nick Bridgen, chief executive until the appointment, becomes non-executive deputy chairman.</p>
<p>"Subject to financing, we now move onto the engineering and, thereafter, the construction phases," chairman Sir Mick Davis said in the announcement, adding that Bridgen had brought the project to the completion of its bankable feasibility study. The company first named Secker as incoming chief executive in a <a href="https://www.investegate.co.uk/announcement/rns/ferro-alloy-resources-limited-npv--far/strategic-update-including-new-ceo-appointment/9697085">strategic update on 31 July</a>, when it said it had submitted applications for funding to US government institutions.</p>
<p>The directors consider the company's ability to raise further funding a material uncertainty, the company said in its <a href="https://www.investegate.co.uk/announcement/rns/ferro-alloy-resources-limited-npv--far/interim-results-/9792655">interim results</a> on 28 September. The feasibility study was issued in October 2025 and the project is at the front-end engineering and design stage, the results say. It has a letter from a large US government financing institution indicating its willingness to consider a formal loan application, subject to its review and approval. Its existing plant produced 96 tonnes of vanadium pentoxide in the first half against 151 tonnes a year earlier, revenue fell to US$1.8 million from US$2.5 million and the loss was US$3.2 million. Cash stood at US$0.8 million at the end of June, against US$0.4 million a year earlier, and at US$0.5 million on 31 August.</p>
<p>A share placement on 2 October repaid bonds issued under its Kazakh bond programme, as set out in <a href="https://corridorminerals.com/news/ferro-alloy-resources-maglut-rare-earth-mou-balasausqandiq-bonds-repaid">our report on its rare earth memorandum with Maglut</a>. The first phase of the project would treat 1.65 million tonnes of ore a year, and shareholders meet at the annual general meeting in St Peter Port, Guernsey, on 20 November, the company's <a href="https://www.investegate.co.uk/announcement/rns/ferro-alloy-resources-limited-npv--far/notice-of-agm/9842379">notice of 27 October</a> says. Kazakhstan's government plans a commission to list strategically important materials, as <a href="https://corridorminerals.com/news/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory">we reported on 1 November</a>.</p><p><a href="https://corridorminerals.com/news/ferro-alloy-resources-peter-secker-chief-executive-balasausqandiq-vanadium">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan&#x27;s power exports fall by a third as home sales rise</title><link>https://corridorminerals.com/news/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise</guid><pubDate>Tue, 03 Nov 2026 00:00:00 +0000</pubDate><description>Exports fell to 1.59 billion kWh in eight months while imports slipped 1.8 per cent, so net imports rose 82 per cent on our calculation.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise.jpg?v=fa23f4ea" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh power balance, Power exports fall by a third</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise.jpg?v=fa23f4ea" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise.jpg?v=fa23f4ea" length="119841" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan exported 1.59 billion kWh of electricity in the first eight months of 2026, 32.8 per cent less than a year earlier, while imports slipped to 3.17 billion kWh, the Bureau of National Statistics said in a <a href="https://stat.gov.kz/api/iblock/element/413816/file/en/">balance table</a> on 20 October.</p>
<p>The table sets what the country produced and imported against what it exported and sold at home. Power plants generated 82.02 billion kWh from January to August, 2.8 per cent more than in the same months of 2025, and imports were 1.8 per cent lower. Sales on the domestic market rose 3.6 per cent to 83.60 billion kWh, while exports fell.</p>
<p>That shifted the trade further towards imports. Kazakhstan imported 1.59 billion kWh more than it exported in the eight months, against 0.87 billion kWh a year earlier, a rise of 82 per cent on a Corridor Minerals calculation. Imports supplied 3.7 per cent of the electricity available in the period, the table shows.</p>
<table><thead><tr><th>Electricity, million kWh</th><th>January to August 2025</th><th>January to August 2026</th><th>Change</th></tr></thead><tbody><tr><td>Production</td><td>79,794.2</td><td>82,018.0</td><td>+2.8%</td></tr><tr><td>Imports</td><td>3,230.9</td><td>3,173.0</td><td>-1.8%</td></tr><tr><td>Exports</td><td>2,359.2</td><td>1,586.4</td><td>-32.8%</td></tr><tr><td>Sales on the domestic market</td><td>80,665.9</td><td>83,604.6</td><td>+3.6%</td></tr></tbody></table>
<p>August followed the same pattern. Exports were 97.8 million kWh, against 223.0 million kWh in August 2025, and imports 636.4 million kWh, against 723.7 million kWh, the monthly columns show.</p>
<p>Generation kept rising into September. The bureau's <a href="https://stat.gov.kz/api/iblock/element/413699/file/en/">industry table</a>, published on 16 October, puts output at 91.32 billion kWh for the first nine months, 2.6 per cent more than a year earlier. Samruk-Energy's group companies reported 29.6 billion kWh for the same nine months, <a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">as we reported</a>, about a third of the national figure on a Corridor Minerals calculation.</p>
<p>The government has set out how it plans to meet demand. Vice Minister of Energy Bakytzhan Ilyasov told a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting</a>, the government said on 29 October, that the country generated a record 123.1 billion kWh last year against consumption of 124.6 billion kWh. The government plans 13.3 GW of new capacity by 2029 to create a 20 per cent surplus of generating capacity, as set out in <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">our report on the plan</a>.</p>
<p>The balance table does not name the countries that bought or supplied the electricity, and the bureau marks its figures as preliminary. Shares and the net figure above are Corridor Minerals calculations from the bureau's figures in million kWh. The next edition of the table is due on 20 November, the bureau's <a href="https://stat.gov.kz/en/release-calendar/?date=11.2026">release calendar</a> shows.</p><p><a href="https://corridorminerals.com/news/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh flat steel sales at home fall 18.9 per cent as exports rise</title><link>https://corridorminerals.com/news/kazakhstan-flat-steel-home-sales-fall-18-9-per-cent-exports-rise-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-flat-steel-home-sales-fall-18-9-per-cent-exports-rise-2026</guid><pubDate>Tue, 03 Nov 2026 00:00:00 +0000</pubDate><description>Exports took 67.3 per cent of the flat steel available in eight months as output fell 6.2 per cent and imports rose 5.3 per cent.</description><category>Metals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-flat-steel-home-sales-fall-18-9-per-cent-exports-rise-2026.jpg?v=c058b67a" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh flat steel, Less flat steel sold at home</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-flat-steel-home-sales-fall-18-9-per-cent-exports-rise-2026.jpg?v=c058b67a" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-flat-steel-home-sales-fall-18-9-per-cent-exports-rise-2026.jpg?v=c058b67a" length="108141" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's home sales of flat rolled steel fell 18.9 per cent to 772,726 tonnes in the first eight months of 2026, while exports rose 5.3 per cent to 1.59 million tonnes, the Bureau of National Statistics said in a <a href="https://stat.gov.kz/api/iblock/element/413816/file/en/">balance table</a> on 20 October.</p>
<p>The table counts flat products made in the country plus those imported as the resources available, and splits their use between exports and domestic sales. Production fell 6.2 per cent to 1.89 million tonnes and imports rose 5.3 per cent to 474,452 tonnes. Exports took 67.3 per cent of the 2.36 million tonnes available, up from 61.3 per cent a year earlier on a Corridor Minerals calculation, leaving 32.7 per cent for the home market.</p>
<table><thead><tr><th>Flat rolled products, tonnes</th><th>January to August 2025</th><th>January to August 2026</th><th>Change</th></tr></thead><tbody><tr><td>Production</td><td>2,010,355</td><td>1,886,011</td><td>-6.2%</td></tr><tr><td>Imports</td><td>450,570</td><td>474,452</td><td>+5.3%</td></tr><tr><td>Exports</td><td>1,508,422</td><td>1,587,737</td><td>+5.3%</td></tr><tr><td>Sales on the domestic market</td><td>952,503</td><td>772,726</td><td>-18.9%</td></tr></tbody></table>
<p>Exports equalled 84.2 per cent of the country's own output in the period, on a Corridor Minerals calculation, and imported steel made up 20.1 per cent of all flat products available, the table shows. Domestic sales fell to 76,759 tonnes in August from 131,704 tonnes in July, against 105,957 tonnes in August 2025, while August exports were 179,553 tonnes.</p>
<p>Output picked up slightly in September. The bureau's <a href="https://stat.gov.kz/api/iblock/element/413699/file/en/">industry table</a>, published on 16 October, puts flat rolled production at 214,104 tonnes in September, against 209,113 tonnes in August, and at 2.10 million tonnes for the first nine months, 5.6 per cent less than a year earlier.</p>
<p>Where the hot-rolled part of those exports went, mainly Russia and Uzbekistan, is set out in <a href="https://corridorminerals.com/news/kazakhstan-iron-ore-hot-rolled-steel-exports-russia-china-2026">our report on the trade tables</a>. Qarmet, the Temirtau steelworks, is installing equipment for a section rolling mill of about 540 thousand tonnes a year, <a href="https://corridorminerals.com/news/qarmet-rolling-mill-540000-tonnes-installation-dar-metall">we reported</a>; that mill is designed for rebar, not flat products.</p>
<p>The balance table does not say which flat products drove the fall in domestic sales, and the bureau marks its figures as preliminary. Shares above are Corridor Minerals calculations from the bureau's figures in tonnes. The next edition of the table is due on 20 November, the bureau's <a href="https://stat.gov.kz/en/release-calendar/?date=11.2026">release calendar</a> shows.</p><p><a href="https://corridorminerals.com/news/kazakhstan-flat-steel-home-sales-fall-18-9-per-cent-exports-rise-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Türkiye launches Milli Enerji 2040 as Kazakhstan publishes price data</title><link>https://corridorminerals.com/news/week-ahead-2026-11-02-milli-enerji-kazatomprom-erdene-cop31</link><guid isPermaLink="true">https://corridorminerals.com/news/week-ahead-2026-11-02-milli-enerji-kazatomprom-erdene-cop31</guid><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate><description>Eight dated items run from 2 to 10 November, including Kazatomprom&#x27;s listed trading update, Erdene&#x27;s results call and the opening of COP31 in Antalya.</description><category>Projects and Deals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/week-ahead-2026-11-02-milli-enerji-kazatomprom-erdene-cop31.jpg?v=bdfb6d15" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: The Week Ahead, Milli Enerji 2040, Kazatomprom, Kazakh data</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/week-ahead-2026-11-02-milli-enerji-kazatomprom-erdene-cop31.jpg?v=bdfb6d15" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/week-ahead-2026-11-02-milli-enerji-kazatomprom-erdene-cop31.jpg?v=bdfb6d15" length="128622" type="image/jpeg"/><content:encoded><![CDATA[<p>Türkiye's energy minister presents the Milli Enerji 2040 vision in Istanbul on Thursday, his ministry said, and Kazakhstan's statistics bureau publishes freight tariff and producer price data through the week, its release calendar shows. Items are listed by date, each with the document behind it.</p>
<ul>
<li>Monday 2 November, Astana. The Bureau of National Statistics publishes indices of tariffs for the transportation of goods by all modes of transport, its <a href="https://stat.gov.kz/en/release-calendar/?date=11.2026">release calendar</a> shows; the same title is listed again on 3 November. The indices measure how freight tariffs change, for ore and metal among other goods.</li>
<li>Tuesday 3 November. Kazatomprom's <a href="https://www.kazatomprom.kz/ru/investors/kalendar_korporativnih_sobitii">investor calendar</a> lists operating results for the third quarter and nine months of 2026 on 3 November, according to the Russian- and Kazakh-language versions of the page (the English version mislabels the entry "Trading Update 3Q 2025"); the company says the dates are subject to change. Cameco's nine-month figures for the Inkai joint venture with Kazatomprom are in <a href="https://corridorminerals.com/news/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026">our report of 1 November</a>.</li>
<li>Thursday 5 November, Astana. The bureau publishes price indices and producer prices for industrial products, the same calendar shows.</li>
<li>Thursday 5 November, Istanbul. Energy and Natural Resources Minister Alparslan Bayraktar said the Milli Enerji 2040 vision will be shared with the public at a launch in Istanbul on 5 November, and that it foresees about US$100bn of investment in electricity transmission and distribution, the <a href="https://enerji.gov.tr/haber-detay?id=31954">ministry said</a>. What is known so far is in <a href="https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained">our explainer</a>.</li>
<li>Thursday 5 November. Erdene Resource Development holds its third quarter 2026 results conference call and webcast, its <a href="https://erdene.com/investor-hub/events/">events page</a> shows. Third quarter sales from its Bayan Khundii gold mine in Mongolia are in <a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">our report of 28 October</a>.</li>
<li>Monday 9 November, Astana. Price indices and wholesale prices of goods are due from the bureau, its calendar lists.</li>
<li>Monday 9 to Friday 20 November, Antalya. Türkiye hosts COP31, the UN climate conference, Bayraktar recalled in the same ministry statement.</li>
<li>Tuesday 10 November, Astana. The bureau publishes its basic price index of industrial producers, the calendar shows.</li>
</ul>
<p>Further ahead, the bureau lists Transport in the Republic of Kazakhstan and its main transport indicators for 12 November. That release sets the date of the monthly Corridor Freight Watch, due within four days of it; the first edition set out <a href="https://corridorminerals.com/news/corridor-freight-watch-2026-11-metals-baseline">what the published figures say about metals on the Caspian route</a>.</p><p><a href="https://corridorminerals.com/news/week-ahead-2026-11-02-milli-enerji-kazatomprom-erdene-cop31">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh metal ore miners double fixed assets to KZT 7.2 trillion since 2021</title><link>https://corridorminerals.com/news/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025</guid><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate><description>Fixed assets at original value rose 108 per cent in four years, against 34 per cent in metallurgy, as mine asset wear eased to 47.7 per cent.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025.jpg?v=210af530" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh fixed assets, Metal ore mines double their asset base</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025.jpg?v=210af530" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025.jpg?v=210af530" length="111542" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's metal ore mining companies held fixed assets worth KZT 7.15 trillion at original value in 2025, more than double the KZT 3.44 trillion of 2021, the Bureau of National Statistics said in tables <a href="https://stat.gov.kz/api/iblock/element/413909/file/en/">published on 30 October</a>.</p>
<p>The rise over four years is 107.8 per cent, on a Corridor Minerals calculation from the bureau's figures in million tenge, and 18.3 per cent in 2025 alone, from KZT 6.05 trillion in 2024. The tables do not split the rise in original value between new spending and other changes, but they report new assets separately: fixed assets entering metal ore mining reached KZT 888.9bn in 2025, against KZT 642.7bn in 2024. The bureau's renewal coefficient for the subsector, which compares new assets with the total, was 12.4 per cent in 2025, up from 10.6 per cent.</p>
<p>Wear eased slightly. The bureau puts the depreciation degree of metal ore mining assets at 47.7 per cent in 2025, down from 49.7 per cent in 2024 but above the 46.4 per cent of 2021. After depreciation, the carrying value was KZT 3.74 trillion.</p>
<table><thead><tr><th>Year</th><th>Metal ore mining, original value, KZT million</th><th>Metallurgy, original value, KZT million</th><th>Metal ore mining, depreciation degree</th><th>Metallurgy, depreciation degree</th></tr></thead><tbody><tr><td>2021</td><td>3,443,553</td><td>4,179,966</td><td>46.4%</td><td>49.2%</td></tr><tr><td>2022</td><td>5,008,776</td><td>4,036,984</td><td>42.7%</td><td>50.9%</td></tr><tr><td>2023</td><td>5,412,290</td><td>4,572,852</td><td>45.5%</td><td>50.5%</td></tr><tr><td>2024</td><td>6,046,392</td><td>5,166,462</td><td>49.7%</td><td>49.8%</td></tr><tr><td>2025</td><td>7,154,381</td><td>5,595,617</td><td>47.7%</td><td>51.2%</td></tr></tbody></table>
<p>The smelters and mills grew more slowly. Fixed assets in the metallurgy industry rose 33.9 per cent over the four years to KZT 5.60 trillion, on a Corridor Minerals calculation, so metal ore mining has carried the larger asset base since 2022. Metallurgy's depreciation degree was 51.2 per cent in 2025. New assets entering the industry rose to KZT 631.8bn from KZT 456.0bn, while disposals reached KZT 199.9bn, lifting its liquidation coefficient to 4.0 per cent from 1.5 per cent.</p>
<p>Oil and gas still dominate the wider sector. Mining and quarrying as a whole held KZT 67.7 trillion of fixed assets in 2025, of which crude oil and natural gas accounted for KZT 58.9 trillion, leaving metal ores with 10.6 per cent of the total, on a Corridor Minerals calculation. Machinery and equipment made up 59.2 per cent of the sector's fixed assets in 2025, against 44.3 per cent in 2021, the bureau's structure table shows.</p>
<p>The sector that includes the power plants feeding the mines and smelters is more worn on the same measure. Electricity, gas, steam and air conditioning supply as a whole, which also covers distribution, carried a depreciation degree of 67.6 per cent in 2025 and a renewal coefficient of 3.8 per cent, against 47.7 per cent wear in metal ore mining. The government plans 13.3 GW of new capacity through 2029, including 7.4 GW of base generation, a programme Vice Minister of Energy Bakytzhan Ilyasov presented to a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting on 29 October</a> and which is set out in <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">our report</a>.</p>
<p>The annual tables sit alongside the bureau's count of capacity commissioned this year, which recorded new copper ore capacity in <a href="https://corridorminerals.com/news/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026">the first nine months of 2026</a>. Shares and changes above are Corridor Minerals calculations from the bureau's tables, which give values in million tenge; the next edition of the tables is due on 29 October 2027, the bureau says.</p><p><a href="https://corridorminerals.com/news/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Samruk-Kazyna names Ansar Aidarov to lead Samruk-Energy&#x27;s management board</title><link>https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman</link><guid isPermaLink="true">https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman</guid><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate><description>The former chief investment officer takes over as the fund&#x27;s chief executive asks for power stations on time; group plants beat their nine-month plan.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman.jpg?v=8a5063c3" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Samruk-Energy, A new head for Samruk-Energy</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman.jpg?v=8a5063c3" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman.jpg?v=8a5063c3" length="117047" type="image/jpeg"/><content:encoded><![CDATA[<p>Samruk-Kazyna has appointed Ansar Aidarov chairman of the management board of Samruk-Energy, putting the power group's former chief investment officer in charge, the fund said in a <a href="https://t.me/samruk_energy/5119">post that Samruk-Energy shared</a> on its official channel on 30 October.</p>
<p>The decision was taken by the management board of Samruk-Kazyna, says the post, which is in Kazakh and Russian. Nurlan Zhakupov, chairman of the Samruk-Kazyna management board, introduced the new head to the company's staff and held a working meeting, at which he said key investment projects must keep strictly to their deadlines and required power stations to be commissioned on time.</p>
<p>Aidarov has worked in the Samruk-Kazyna group since 2013. He was previously general director of Energiya Semirechya LLP, head of Samruk-Energy's project office and its chief investment officer, the post says. As chief investment officer, he was quoted by the company when it signed a cooperation agreement on about 2 GW of solar and wind projects with Oman's O-GREEN, as <a href="https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement">we reported on 25 October</a>.</p>
<p>He takes over a group whose plants beat their nine-month plan. Samruk-Energy companies generated 29.6 billion kWh of electricity in January to September 2026, 2.9 per cent above target and 1 per cent more than a year earlier, the company said in a <a href="https://samruk-energy.kz/en/press-center/news/2971-samruk-energy-exceeds-electricity-generation-target-by-nearly-3-in-the-first-nine-months-of-2026">statement on 28 October</a>. Thermal plants produced 24.7 billion kWh, 3 per cent above target, including 18 billion kWh at Ekibastuz SDPP-1, which beat its own target by 4 per cent; hydropower plants produced 4.64 billion kWh, also 4 per cent above target, as set out in <a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">our report on the figures</a>. Shardarinsk HPP and Ust-Kamenogorsk HPP reached 108 per cent of their targets, the statement says.</p>
<p>The post does not name the projects Zhakupov referred to. The national programme they sit in is large: Kazakhstan plans to commission 13.3 GW of new capacity through 2029, including 7.4 GW of base generation and 5.9 GW of renewables, Vice Minister of Energy Bakytzhan Ilyasov told a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting on 29 October</a>. The government says the programme is meant to leave the country with a 20 per cent electricity surplus by 2029.</p><p><a href="https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan cuts metered firms&#x27; power and gas prepayment to 15 per cent</title><link>https://corridorminerals.com/news/uzbekistan-cuts-business-power-gas-prepayment-15-per-cent-november-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-cuts-business-power-gas-prepayment-15-per-cent-november-2026</guid><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate><description>Businesses on remotely switchable meters with clean payment records now pay 15 per cent of a month&#x27;s bill in advance, not the full amount.</description><category>Policy and Trade</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-cuts-business-power-gas-prepayment-15-per-cent-november-2026.jpg?v=fb673581" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek power and gas, A 15 per cent advance for metered firms</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-cuts-business-power-gas-prepayment-15-per-cent-november-2026.jpg?v=fb673581" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-cuts-business-power-gas-prepayment-15-per-cent-november-2026.jpg?v=fb673581" length="114040" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbek businesses connected to automated metering now prepay 15 per cent of their monthly electricity and natural gas bills instead of 100 per cent, under a rule in force from 1 November, the <a href="https://t.me/minenergy_uz/21555">Ministry of Energy said</a> on 31 October.</p>
<p>The lower advance applies to companies connected to the automated systems for metering electricity (ASKUE) and natural gas (ASKUG) whose meters can be switched off and on remotely. Consumers that broke payment discipline in the previous two months are excluded. The rest of the bill can be paid in parts during the month, the ministry said. The same businesses no longer have to submit written reports on their electricity and gas use to the supply companies, and their supply contracts are now concluded electronically, with paper contracts abolished.</p>
<p>The ministry cites presidential decree UP-175 of 28 August 2026 for the 15 per cent advance. A separate decree, UP-202 of 22 September, introduced the status of "exemplary consumer" for businesses that use electricity and gas with discipline. When the ministry <a href="https://t.me/minenergy_uz/21201">set out the regime in more detail</a> on 28 September, it gave the conditions as a connection to the two metering systems, a meter that can be controlled remotely and no overdue debts or violations, and said the advance would be 15 per cent of the reporting month's value.</p>
<p>The change answers a complaint President Shavkat Mirziyoyev relayed at his open dialogue with entrepreneurs on 18 August. Many entrepreneurs had said that paying 100 per cent in advance for electricity and gas reduced their working capital, the <a href="https://t.me/minenergy_uz/20779">ministry said</a> that day in its account of the dialogue, quoting him as saying that the management system of the energy sector was being changed fundamentally. The ministry says the new order lets businesses keep working capital for production and other needs.</p>
<p>The ministry did not say how many companies qualify or how much working capital the rule leaves with them. It is one of several changes on the distribution side this autumn: the World Bank approved a $100 million loan on 27 October for the country's electricity distribution system, as <a href="https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan">we reported</a>, and the national grid company nearly doubled transformer capacity at 10 Tashkent substations before winter, the subject of <a href="https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations">our report of 1 November</a>.</p><p><a href="https://corridorminerals.com/news/uzbekistan-cuts-business-power-gas-prepayment-15-per-cent-november-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s natural gas output falls to 27 billion cubic metres</title><link>https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Large producers extracted 16.4 per cent less gas in nine months than a year earlier, while mining and quarrying grew 3.1 per cent in real terms.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026.jpg?v=327c4d95" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek industry, Uzbek gas output drops for a second year</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026.jpg?v=327c4d95" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026.jpg?v=327c4d95" length="114230" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's large industrial enterprises produced 27.0 billion cubic metres of natural gas in January to September, against 32.3 billion a year earlier, the National Statistics Committee said in its <a href="https://stat.uz/img/news/press-reliz-sanoat-09-2026-en_p11189.pdf">nine-month industrial production release</a>.</p>
<p>That is a fall of 16.4 per cent, by Data Desk arithmetic. The committee's table gives 33.7 billion cubic metres for the same months of 2024, so output has now dropped for two years running and is 19.9 per cent below the 2024 level, by the same arithmetic. Gas condensate fell to 729.2 thousand tonnes from 849.2 thousand, oil to 482.2 thousand tonnes from 490.1 thousand, and coal to 5.4 million tonnes from 5.8 million. The committee notes that the 2024 and 2025 product figures were adjusted to the annual balance.</p>
<p>Not every extracted product fell. Portland cement output rose to 16.2 million tonnes from 15.7 million, after 11.9 million in the same months of 2024. Motor gasoline output rose to 913.2 thousand tonnes from 890.1 thousand and diesel to 979.0 thousand tonnes from 876.1 thousand, while oil and condensate output fell.</p>
<p>The hydrocarbon declines sit inside a mining sector that still grew. Mining and quarrying, section B of the classification, produced UZS 70.3trn of output in nine months, 6.5 per cent of all industrial output, and the committee's chart puts its physical volume index at 103.1 per cent, real growth of 3.1 per cent. The committee gave the section's eight-month output as <a href="https://stat.uz/en/press-center/news-of-committee/70704-zbekistonda-to-kon-sanoati-azhmi-arijb-58-trln-s-mga-etdi-4">57.8 trillion soums</a>, so September added about UZS 12.5trn, the Data Desk calculates.</p>
<p>Total industrial output reached UZS 1,085.7trn, up 8.1 per cent in real terms. Navoi region produced UZS 228,966.7bn, more than any other region, with a volume index of 107.4 per cent, and its output per head was UZS 192.4m against a national average of UZS 27.6m. The region's weight in metallurgy is set out in the Data Desk's <a href="https://corridorminerals.com/news/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026">January to August metallurgy figures</a>.</p>
<p>Power generation moved the other way from gas. The release gives 67,159.5 million kWh of electricity generated in nine months, 7.3 per cent more than a year earlier. Large enterprises generated 44,402.6 million kWh against 45,100.5 million, while small businesses whose main activity is power production, generated 22,756.9 million kWh against 17,464.7 million, a rise of 30.3 per cent by Data Desk arithmetic. Heat output from large enterprises fell 19.3 per cent.</p>
<p>Investment has shifted away from both sectors as a share of the total. The committee's <a href="https://stat.uz/img/news/invest--english_p51718.pdf">fixed investment release</a> shows UZS 33,853.2bn invested in the mining industry in nine months, 5.8 per cent of the total against 9.5 per cent a year earlier, and UZS 38,980.7bn in electricity, gas, steam and air conditioning, 6.7 per cent against 12.9 per cent. The Data Desk set out those shares in its <a href="https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026">report on mining and power investment</a>.</p>
<p>The release does not give monthly gas output or name the producing fields, and it covers large enterprises only, so it does not show whether smaller producers made up any of the gap.</p><p><a href="https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhmys says it has repaired 346 units of mining equipment this year</title><link>https://corridorminerals.com/news/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The KZT 6.7bn programme has put KZT 5.8bn into repair work so far, with 277 of the machines repaired at the Zhezkazgan mines.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme.jpg?v=000fce8c" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh copper, Kazakhmys repairs 346 mining machines</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme.jpg?v=000fce8c" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme.jpg?v=000fce8c" length="112442" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhmys said it has repaired 346 units of mining equipment at its mines this year under a KZT 6.7bn programme, of which KZT 5.8bn has already gone to repair work, in a <a href="https://t.me/kazakhmys_news/5620">post on its news channel on 28 October</a>.</p>
<p>Most of the work was in the Zhezkazgan region, where 277 machines were repaired. A further 38 were repaired in the Balkhash region and 31 in the Karaganda region. The company said it has also restored or replaced 193 major components and assemblies and plans about 100 more by the end of the year, on drill rigs, load-haul-dump machines, haul trucks and other Caterpillar, Sandvik and Epiroc equipment.</p>
<p>Tyres are the one supply item the post itemises. Kazakhmys said its warehouses hold 183 large tyres, enough for about 26 days at the current average rate of use, and that it has signed a contract and placed an order for 943 more, with deliveries on schedule.</p>
<p>The equipment programme runs alongside work on buildings at the Balkhash smelter. In a <a href="https://t.me/kazakhmys_news/5616">post on 27 October</a>, the company said Kazakhmys Smelting plans to repair 27,310 square metres of roofing in 2026 and has completed 16,871, about 62 per cent. In the copper smelting shop, 2,642 of a planned 4,868 square metres are done. The company has set aside KZT 3.74bn this year for repairs to buildings and structures at the Balkhash site, covering the smelter, the copper electrolysis shop, the precious metals and sulphuric acid shops and the charge preparation shop.</p>
<p>A third programme covers 90 <a href="https://t.me/kazakhmys_news/5627">welfare and amenity buildings</a> at the group's sites, from changing rooms to canteens and medical points. Kazakhmys said repairs are complete at 34, under way at 30 and in preparation at 26. Of the finished sites, 17 belong to the Jezqazgan Tau-ken ondirisi production association, including the amenity block of shafts 73 to 75 at the West Zhezkazgan mine, and six each to the Balqash and Qaragayly associations.</p>
<p>The posts give no production figures, so they do not show how the repairs have changed mine output or availability. The Balkhash smelter and its feed are covered in Corridor Minerals' report on <a href="https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review">the government's Balkhash review</a>, and the owners of the country's copper producers in its <a href="https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners">ownership explainer</a>.</p><p><a href="https://corridorminerals.com/news/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Samruk-Energy beats its nine-month power plan by 2.9 per cent</title><link>https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan</link><guid isPermaLink="true">https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Its plants generated 29.6 billion kWh, 1 per cent more than a year earlier, with Ekibastuz SDPP-1 supplying 18 billion kWh.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan.jpg?v=d6494749" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh power, Samruk-Energy output runs above plan</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan.jpg?v=d6494749" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan.jpg?v=d6494749" length="111230" type="image/jpeg"/><content:encoded><![CDATA[<p>Samruk-Energy said its group companies generated 29.6 billion kWh of electricity in January to September, 2.9 per cent above plan and 1 per cent more than a year earlier, in a <a href="https://samruk-energy.kz/en/press-center/news/2971-samruk-energy-exceeds-electricity-generation-target-by-nearly-3-in-the-first-nine-months-of-2026">statement on 28 October</a>.</p>
<p>Thermal plants produced 24.7 billion kWh, 3 per cent above their target. Ekibastuz SDPP-1 generated 18 billion kWh, 4 per cent above target. Hydropower plants generated 4.64 billion kWh, also 4 per cent above plan, with the Shardara and Ust-Kamenogorsk plants at 108 per cent of their targets. Thermal and hydro output together come to 29.34 billion kWh, by Data Desk arithmetic; the statement does not say what produced the remaining 0.26 billion kWh. Thermal plants supplied about 83 per cent of the group's output and Ekibastuz SDPP-1 alone about 61 per cent, by the same arithmetic.</p>
<p>The figures matter for the smelters and mines that buy Kazakh power. At the government meeting of 29 October, vice-minister of energy Bakytzhan Ilyasov said the country generated a record 123.1 billion kWh last year against consumption of 124.6 billion kWh, in a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government readout</a>. On that basis, Samruk-Energy's nine months equal about 24 per cent of last year's national generation, the Data Desk calculates. The same readout sets out 13.3 GW of new capacity by 2029, covered in Corridor Minerals' <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">report on the plan</a>.</p>
<p>The company is also preparing for winter. At a meeting of the Public Council of Samruk-Kazyna, Samruk-Energy and the grid operator KEGOC reported on preparations for the 2026 to 2027 heating season. In an <a href="https://samruk-energy.kz/en/press-center/news/2937-samruk-energy-scompletes-its-maintenance-campaign">update on 9 October</a>, Samruk-Energy said it had scheduled maintenance on 111 major equipment units this year, including 19 major overhauls, five extended overhauls and 87 routine jobs, covering power units, boilers, turbines, transmission lines, substations and heating networks, and that nearly half of the new generating capacity Kazakhstan plans to 2035 is attributable to it. Its renewables work abroad includes the <a href="https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement">2 GW accord with Oman's O-GREEN</a>.</p>
<p>The statement gives no quarterly split and no comparison with plan for the wind and solar plants in the group.</p><p><a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Erdenes Tavan Tolgoi offers 998,400 tonnes of thermal coal in one lot</title><link>https://corridorminerals.com/news/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The 23 October lot, 156 packages with a US$85.1 floor, was 77.6 per cent of the coal the company listed on the exchange from 21 to 30 October.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026.jpg?v=c882dcb2" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Coal auctions, ETT offers 998,400 tonnes of thermal coal in one lot</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026.jpg?v=c882dcb2" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026.jpg?v=c882dcb2" length="126522" type="image/jpeg"/><content:encoded><![CDATA[<p>Erdenes Tavan Tolgoi put 998,400 tonnes of thermal coal up for sale in a single lot on the Mongolian Stock Exchange on 23 October, with a starting price of US$85.1 a tonne, <a href="https://mse.mn/uploads/auction_schedules/mn-2636-TC.pdf">its trading notice</a> says.</p>
<p>The notice splits the volume into 156 packages, or 6,400 tonnes each on a Corridor Minerals calculation. The notice sets the lowest calling price at US$85.1 and requires each call to raise it by at least US$0.3. The price is index-based with no quality adjustment, and the contract runs for 12 months to 23 October 2027. Delivery is to the buyer's nominated customs zone at Mandal on the Chinese side of the border, by road and rail. The schedule calls for 60.2 thousand tonnes in each of November and December 2026, then 87.8 thousand tonnes a month from January to 23 October 2027, with 25 per cent paid in advance.</p>
<p>The notice also sets US$8,496,384 for exchange buyers and US$4,248,192 for brokers, which on a Corridor Minerals calculation is 10 per cent and 5 per cent of the 998,400 tonnes valued at the floor price, or about US$85.0 million.</p>
<p>The lot sat inside a busy ten days. The company's <a href="https://ett.mn/operation/notices">notices page</a> lists ten auctions of coal from 21 to 30 October, and the exchange's <a href="https://comex.mse.mn/show-notices?isChangedPrice=&product=1&product_type=&seller=1&start_date=&end_date=">own register</a> carries the same lots. Nine of them are 32,000 tonnes each, in five packages. Together the ten total 1,286,400 tonnes, and on a Corridor Minerals calculation the 23 October thermal lot is 77.6 per cent of that.</p>
<table>
<thead><tr><th>Auction, 2026</th><th>Grade (notice)</th><th>Tonnes</th><th>Floor, US$ a tonne</th><th>Contract, months</th><th>Delivery port</th></tr></thead>
<tbody>
<tr><td>21 Oct</td><td>Medium-volatile coking (2649-CO)</td><td>32,000</td><td>177.7</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>22 Oct</td><td>Washed weakly coking (2640-13 WCO)</td><td>32,000</td><td>182.9</td><td>3</td><td>Mandal</td></tr>
<tr><td>23 Oct</td><td>1/3 coking (26121-13 CO)</td><td>32,000</td><td>170.0</td><td>3</td><td>Mandal</td></tr>
<tr><td>23 Oct</td><td>Thermal (2636-TC)</td><td>998,400</td><td>85.1</td><td>12</td><td>Mandal</td></tr>
<tr><td>26 Oct</td><td>Medium-volatile coking (2650-CO)</td><td>32,000</td><td>181.8</td><td>3</td><td>Mandal</td></tr>
<tr><td>27 Oct</td><td>Washed weakly coking (2641-13 WCO)</td><td>32,000</td><td>167.6</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>28 Oct</td><td>Thermal (2637-TC)</td><td>32,000</td><td>82.1</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>29 Oct</td><td>1/3 coking (26122-13 CO)</td><td>32,000</td><td>163.9</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>30 Oct</td><td>1/3 coking (26123-13 CO)</td><td>32,000</td><td>107.3</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>30 Oct</td><td>Thermal (2638-TC)</td><td>32,000</td><td>82.1</td><td>6</td><td>Gants Mod</td></tr>
</tbody>
</table>
<p>All floor prices in the table come from the individual notices. The register also prints a higher figure beside some of the floors, for example 92.1 alongside 85.1, which the notices do not explain, so Corridor Minerals uses only the notice figure. These are starting prices. None of the documents read reports a result, so no clearing price or volume sold is given here.</p>
<p>Coking coal sat in a narrow band. Six of the seven coking lots opened between US$163.9 and US$182.9 a tonne. The 1/3 coking lot of 29 October, specified at no more than 9.0 per cent ash and 1.0 per cent sulphur, started at US$163.9, 3.6 per cent below the US$170.0 of the 23 October lot with the same specification, on a Corridor Minerals calculation. The two differ in terms: the earlier lot ran three months to Mandal, the later six months to Gants Mod.</p>
<p>The outlier is the 30 October 1/3 coking lot at US$107.3. Its notice allows ash of 22.0 per cent, plus or minus 3.0, which puts it on a lower-grade specification, and the floor is 34.5 per cent below the US$163.9 lot, on a Corridor Minerals calculation. The three thermal lots opened at US$85.1 and US$82.1 twice. The 23 October floor is US$3.0, or 3.7 per cent, above the smaller lots, on a Corridor Minerals calculation, with a 12-month contract against six.</p>
<p>The auctions feed a trade that is rising in value. Mongolia exported goods worth US$16.2 billion in January to September, with coal adding US$2 billion to the increase on the year, <a href="https://centralasiawire.com/articles/mongolias-exports-rise-51-in-nine-months-to-16-2-billion-on-copper-and-coal">Central Asia Wire reported</a> from the National Statistics Committee release; the report gives no volumes. Other Mongolian coal producers report into the same market. Mongolian Mining Corporation <a href="https://corridorminerals.com/news/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks">reported lower third-quarter coking coal sales</a>, and <a href="https://corridorminerals.com/news/aspire-mining-ovoot-coking-coal-mongolian-otc-bond-us-9-6-million">Aspire Mining is raising Mongolian bonds</a> for its Ovoot coking coal mine.</p><p><a href="https://corridorminerals.com/news/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh producers hold 101,654 tonnes of unshipped ferrochrome</title><link>https://corridorminerals.com/news/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Ferrosilicon stocks stand at 68,964 tonnes, 2.2 times third-quarter shipments, while refined copper and zinc left plants almost as fast as they were made.</description><category>Metals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026.jpg?v=01141e7e" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh metal stocks, Ferrochrome waits in Kazakh yards</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026.jpg?v=01141e7e" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026.jpg?v=01141e7e" length="110941" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's industrial enterprises held 101,654 tonnes of finished ferrochrome unshipped at the end of September, equal to 28.6 per cent of third-quarter shipments, the <a href="https://stat.gov.kz/api/iblock/element/413702/file/en/">Bureau of National Statistics said</a> in a table published on 28 October.</p>
<p>The table covers shipment and end-of-period balances of products at industrial enterprises for January to September 2026. It gives output and shipments for the third quarter and for the nine months, but only one balance: the stock of finished products on 30 September. It carries no earlier balance, so a rise or fall in stocks cannot be read from it. The share above is on a Corridor Minerals calculation, dividing the balance by third-quarter shipments of 355,336 tonnes.</p>
<p>Ferrochrome output was 388,264 tonnes in the quarter and 1,288,641 tonnes in the nine months, against shipments of 1,175,863 tonnes in the nine months. A further 43,470 tonnes went to the producers' own use in the quarter. The regional lines show Aktobe and Pavlodar as the producers, with the balance for each marked confidential. Exports of the alloy are covered in <a href="https://corridorminerals.com/news/kazakhstan-ferrochrome-exports-china-eu-cbam-exposure-2026">our piece on China's 72 per cent share</a>.</p>
<p>Ferrosilicon is the larger overhang relative to sales. The balance of 68,964 tonnes is 2.2 times the quarter's shipments of 31,258 tonnes, on a Corridor Minerals calculation, and 87.5 per cent of the 78,808 tonnes produced in nine months. Output in the quarter was only 5,668 tonnes, so shipments ran 25,590 tonnes ahead of production. Pavlodar holds 67,676 tonnes of the balance. Ferrosilicomanganese stands at 8,089 tonnes against 17,667 tonnes shipped in the quarter. The balance for ferrosilicochrome is marked confidential.</p>
<p>Copper and zinc show little waiting. Refined copper output was 119,540 tonnes in the quarter and shipments 119,094 tonnes, leaving 2,828 tonnes, or 2.4 per cent of quarterly shipments. Raw zinc output of 56,399 tonnes compares with shipments of 56,287 tonnes and a balance of 2,115 tonnes. Karagandy, Shygys Kazakhstan and Abay hold the copper balance. Where that copper went is the subject of <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">our look at Türkiye's 59 per cent share by value</a>.</p>
<p>Light metal stocks are also small. Raw aluminium stands at 3,979 tonnes after 74,429 tonnes shipped in the quarter, and alumina at 5,883 tonnes after 377,980 tonnes. Nine-month aluminium output of 204,302 tonnes is close to shipments of 204,769 tonnes. A deputy general director of ERG Kazakhstan put current capacity at the Kazakhstan Electrolysis Plant at 250 thousand tonnes, in a Kursiv report <a href="https://www.erg.kz/ru/news/show/3873">republished on the group's website</a>; the table does not name enterprises, so it cannot be tied to one plant. Plans for a second phase are in <a href="https://corridorminerals.com/news/erg-kazakhstan-aluminium-smelter-second-phase-1bn-pavlodar">our earlier report</a>.</p>
<table><thead><tr><th>Product, 30 September 2026</th><th>Unshipped balance</th><th>Q3 shipments</th><th>Balance as share of Q3 shipments</th></tr></thead><tbody><tr><td>Ferrochrome, tonnes</td><td>101,654</td><td>355,336</td><td>28.6 per cent</td></tr><tr><td>Ferrosilicon, tonnes</td><td>68,964</td><td>31,258</td><td>220.6 per cent</td></tr><tr><td>Ferrosilicomanganese, tonnes</td><td>8,089</td><td>17,667</td><td>45.8 per cent</td></tr><tr><td>Raw aluminium, tonnes</td><td>3,979</td><td>74,429</td><td>5.3 per cent</td></tr><tr><td>Refined copper, tonnes</td><td>2,828</td><td>119,094</td><td>2.4 per cent</td></tr><tr><td>Raw zinc, tonnes</td><td>2,115</td><td>56,287</td><td>3.8 per cent</td></tr></tbody></table>
<p>The table gives concentrates in thousand tonnes. Chromium concentrates carry the biggest balance, 441.2 thousand tonnes, all in Aktobe, against 1,008.9 thousand tonnes shipped in the quarter, or 43.7 per cent. Zinc concentrates hold 23.8 thousand tonnes against 119 thousand shipped, or 20.0 per cent. Copper concentrates hold 181.6 thousand tonnes against 3,395.6 thousand, or 5.3 per cent, on a Corridor Minerals calculation.</p>
<p>The same bureau's <a href="https://stat.gov.kz/en/industries/business-statistics/stat-industrial-production/publications/519387/">industrial output release</a>, published on 16 October, puts the industrial production index for January to September at 102.9 per cent, with mining at 95.7 per cent and manufacturing at 108.6 per cent. The release lists copper ores, zinc concentrates, ferrochrome and refined copper among the main products of the producing regions, but it gives no stock data.</p><p><a href="https://corridorminerals.com/news/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan and Türkiye widen preferential trade list and border data</title><link>https://corridorminerals.com/news/uzbekistan-turkiye-widen-preferential-trade-goods-list-advance-customs-data</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-turkiye-widen-preferential-trade-goods-list-advance-customs-data</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>A protocol adds goods to the Preferential Trade Agreement and amends a 2022 border-data deal; the published summaries name no products, metals included.</description><category>Policy and Trade</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-turkiye-widen-preferential-trade-goods-list-advance-customs-data.jpg?v=929c81e4" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan, Türkiye trade, Uzbekistan and Türkiye widen preferential trade list</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-turkiye-widen-preferential-trade-goods-list-advance-customs-data.jpg?v=929c81e4" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-turkiye-widen-preferential-trade-goods-list-advance-customs-data.jpg?v=929c81e4" length="134861" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan and Türkiye signed a protocol on 29 October expanding the list of goods under their Preferential Trade Agreement, and a second amending their 2022 arrangement on advance information about goods and vehicles crossing the border, the <a href="https://president.uz/en/lists/view/9794">Uzbek presidency said</a>.</p><p>The documents were signed after talks in Ankara between Presidents Shavkat Mirziyoyev and Recep Tayyip Erdoğan. The same package included an agreement creating a High-Level Business Support Council, an intergovernmental social security agreement and an administrative agreement to implement it. The presidency said the documents aim to expand trade and economic cooperation and create favourable conditions for business.</p><p>Which goods are added is not stated. The presidency page names no products, tariff lines or sectors, and it does not mention metals, mining or energy. It describes the customs document only as an additional protocol amending the one signed on 29 March 2022, without saying what changes. <a href="https://www.uzdaily.uz/en/uzbekistan-and-turkiye-sign-agreements-to-deepen-partnership/">UzDaily</a> repeats the same wording. Corridor Minerals found no published text of either protocol.</p><p>Mining does appear in the Turkish account of the visit, but as a field of relations rather than a term of the protocol. Erdoğan said the two countries would keep advancing ties in trade, investment, mining, transportation and the defence industry, according to a Communications Directorate statement <a href="https://www.anews.com.tr/turkey/2026/10/29/turkish-uzbek-leaders-discuss-regional-issues-sign-5-bilateral-agreements">carried by Anadolu Agency</a>. That statement gives only the titles of the five documents.</p><p>Ministers signed the trade texts. Turkish Trade Minister Ömer Bolat and Uzbekistan's Minister of Investment, Industry and Trade Laziz Kudratov signed the preferential trade protocol, while Bolat and Foreign Minister Bakhtiyor Saidov signed the advance-information protocol, <a href="https://www.dailysabah.com/politics/diplomacy/turkiye-uzbekistan-sign-5-deals-after-erdogan-mirziyoyev-talks">Daily Sabah reported</a>. It put bilateral trade at US$3.1 billion in 2025 against a shared target of US$5 billion, and the presidency page gives no date for the new lists to take effect.</p><p>For metals, the practical link is existing trade rather than anything in the new texts. Türkiye already takes most of Kazakhstan's refined copper by value, as our <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">customs-table analysis</a> showed, and Uzbekistan is building up its own cathode supply, as covered in <a href="https://corridorminerals.com/news/uzbekistan-copper-purchase-finance-uzsanoatexport-cathode-300000-tonnes">our report on the copper purchase facility</a>. Whether any metal or energy lines sit on the widened list will only be clear once the protocol text or the tariff schedule is published.</p><p><a href="https://corridorminerals.com/news/uzbekistan-turkiye-widen-preferential-trade-goods-list-advance-customs-data">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan plans a strategic materials list and an Astana raw materials lab</title><link>https://corridorminerals.com/news/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>A government commission would set common criteria, rare earths included, and a ministry method tests new plants against market capacity.</description><category>Critical Minerals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory.jpg?v=6b44dff5" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan strategic materials, Strategic list, lab and capacity test</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory.jpg?v=6b44dff5" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory.jpg?v=6b44dff5" length="128519" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's government plans a special commission to list strategically important materials, rare and rare earth metals among them, and a national laboratory for critical raw materials in Astana, Vice Minister of Industry and Construction Iran Sharkhan told <a href="https://primeminister.kz/ru/news/ispolnenie-poslaniya-prezidenta-20-proektov-geologorazvedki-i-semku-novogo-masshtaba-zapustyat-v-kazahstane-32048">a government meeting</a> on 29 October.</p>
<p>The commission would sit at government level, set unified criteria and form the list, the government's Russian-language account of the meeting says. Sharkhan also spoke of further integration of Kazakhstan into global supply chains. The stated purpose is to set priorities for developing the raw material base and to reduce dependence on imports.</p>
<p>The account says the government "provides for" the commission, which is a plan and not a body already at work. It gives no date for its creation, no membership, no deadline for the list and no materials beyond the "rare and rare earth metals" it names. Corridor Minerals reported on the geological survey and auction plans from the same meeting <a href="https://corridorminerals.com/news/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year">separately</a>.</p>
<h2>A laboratory with an earlier trail</h2>
<p>The national laboratory would stand in Astana. The government's account gives no budget, no opening date and no operator.</p>
<p>Earlier statements point to related work. In September 2025 Minister of Industry and Construction Yersayin Nagaspayev announced agreements with two laboratory brands, RCI Inspection and PARAGON, for a geo-analytical laboratory in Astana under the National Geological Service, scheduled to open by mid-2026, <a href="https://timesca.com/kazakhstan-to-launch-internationally-accredited-rare-earth-laboratory/">the Times of Central Asia reported</a>. In June 2026 the leaders of Kazakhstan and the European Union welcomed a European Bank for Reconstruction and Development memorandum of understanding on an internationally accredited national chemical-analytical laboratory, <a href="https://www.eeas.europa.eu/delegations/kazakhstan/joint-press-statement-strengthening-strategic-partnership-between-european-union-and-kazakhstan_en">a joint press statement</a> from 23 June shows.</p>
<p>Neither document says whether those projects are the same facility as the laboratory Sharkhan named on 29 October, and the government's account does not link them. A separate laboratory complex for a planned regional rare earth research centre is expected to start construction in 2027, as <a href="https://corridorminerals.com/news/kazakhstan-21-of-34-eu-critical-raw-materials-usgs-output-check">Corridor Minerals reported</a> on 25 October.</p>
<h2>A capacity test for new plants</h2>
<p>The third item is a method already approved. The Ministry of Industry and Construction has approved a Methodology for assessing the balance of production capacities, the government's account says. It governs how new initiatives are assessed against market capacity, existing production and resource availability, with the aim of preventing overproduction and keeping capacity in balance.</p>
<p>The results of the analysis will be taken directly into account when investment preferences and state support are allocated, the account says. The test therefore feeds directly into who receives incentives. The account does not give the date of approval, the thresholds or formulas the method uses, the sectors it covers or whether it applies to mining and metals processing. Sharkhan framed the industrial block of his report around technological independence, growth of domestic production and the effectiveness of state support measures.</p>
<h2>Where the EU partnership fits</h2>
<p>A national list and a testing laboratory both bear on the raw materials partnership Kazakhstan runs with the European Union. The partnership roadmap for 2025 and 2026 sets goals on geological exploration, research and innovation along the whole value chain, skills, and environmental, social and governance standards, <a href="https://www.eeas.europa.eu/delegations/kazakhstan/eu-and-kazakhstan-take-next-step-their-cooperation-critical-raw-materials_en">the EU Delegation said</a> when it was endorsed in April 2025. Corridor Minerals tracked what that partnership has funded so far in a <a href="https://corridorminerals.com/news/eu-critical-raw-materials-partnerships-central-asia-part-1-kazakhstan">series on Central Asia</a>.</p>
<p>In June 2026 the two sides also committed to advancing the roadmap for the strategic partnership on sustainable raw materials, batteries and renewable hydrogen value chains, the same joint press statement says, which makes the Astana laboratory and any national list natural reference points for that work. That link is Corridor Minerals' reading, as neither document draws it.</p>
<p>The 29 October account is a statement of intent by the government, not a decree. The commission's founding act, its list and the laboratory's budget are the documents to watch.</p><p><a href="https://corridorminerals.com/news/kazakhstan-plans-strategic-materials-list-astana-raw-materials-laboratory">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Cameco says Inkai uranium output rose to 8.1 million pounds this year</title><link>https://corridorminerals.com/news/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The Kazakh joint venture produced 5.9 million pounds a year earlier, and the final shipment of Cameco&#x27;s 2026 share is now in transit.</description><category>Critical Minerals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026.jpg?v=a8e643de" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh uranium, Inkai output reaches 8.1 million pounds</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026.jpg?v=a8e643de" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026.jpg?v=a8e643de" length="113024" type="image/jpeg"/><content:encoded><![CDATA[<p>JV Inkai, the Kazakh uranium joint venture of Kazatomprom and Cameco, produced 8.1 million pounds of U3O8 in the first nine months of 2026, up from 5.9 million pounds a year earlier, Cameco said in its <a href="https://www.sec.gov/Archives/edgar/data/1009001/000119312526439858/d106072dex992.htm">third quarter report</a> on 30 October.</p>
<p>All production figures are on a 100 per cent basis. Output in the third quarter alone was 2.8 million pounds, against 2.4 million pounds in the same quarter of 2025, the company said in the management's discussion and analysis filed with its third quarter results. JV Inkai is targeting 10.4 million pounds for the full year, of which Cameco's purchase allocation is expected to be 4.2 million pounds. On Corridor Minerals' arithmetic, the nine-month figure is 78 per cent of the annual target and leaves 2.3 million pounds to be produced in the fourth quarter.</p>
<p>Inkai is owned 60 per cent by Kazatomprom and 40 per cent by Cameco, according to <a href="https://www.cameco.com/businesses/uranium-operations/kazakhstan/inkai">Cameco's page on the operation</a>, which uses in situ recovery and has been producing since 2008. The wider ownership of Kazakh uranium assets is set out in Corridor Minerals' <a href="https://corridorminerals.com/news/who-owns-kazakhstan-uranium-kazatomprom-partners">guide to Kazatomprom's partners</a>.</p>
<h2>Shipments to Blind River</h2>
<p>Cameco records its share of Inkai's production as a purchase when the uranium is delivered, so its purchases do not follow the mine's quarterly output. It bought no uranium from JV Inkai in the third quarter. In the first nine months it purchased 800,000 pounds from its 2026 allotment and had weight adjustments of about 200,000 pounds from prior year deliveries, a total of 1 million pounds at C$111.83 a pound (US$81.45), the <a href="https://www.sec.gov/Archives/edgar/data/1009001/000119312526439858/d106072dex991.htm">results release</a> said. In the third quarter and first nine months of 2025 it had bought 100,000 pounds, at C$100.81 a pound (US$73.05).</p>
<p>After the quarter ended, a second shipment containing about 1.6 million pounds of Cameco's share of 2026 production was delivered to Blind River. The final shipment of its remaining share is in transit and is expected to arrive before the end of 2026, the company said. Taken with the 800,000 pounds already bought, about 1.8 million pounds of the expected 4.2 million pound allocation would remain for the final shipment, on Corridor Minerals' calculation. That is a remainder based on the forecast allocation, not a confirmed quantity: Cameco did not give the size of the shipment in transit.</p>
<p>Inkai matters for Cameco's own supply plan. Its 2026 outlook counts committed purchases of about 8 million pounds, including the Inkai volumes, and the company said that if Inkai production or deliveries vary, committed purchases will vary and it may have to rely on its other sources of supply.</p>
<p>The purchases are booked at a 5 per cent discount to the spot price. Cameco's 2026 outlook assumes a spot price of US$89.50 a pound, the UxC spot price on 30 September. Its profit from Inkai reaches it as a dividend: the company said the benefit of the venture's 2026 performance will be realised later in 2027, once the dividend for 2026 is declared and paid.</p>
<h2>Risks the company lists</h2>
<p>Reaching the 2026 production target requires JV Inkai to manage several ongoing risks, Cameco said: the availability of sulfuric acid, other procurement and supply chain issues, transportation challenges, construction delays and inflationary pressure on production costs. The company said the geopolitical situation continues to cause transportation risks in the region and that Inkai deliveries could be delayed, a risk it covers with inventory, long-term purchase agreements and loan arrangements.</p>
<p>Elsewhere in Kazakh uranium, Kazatomprom has put an amended supply contract with Uranium One to a <a href="https://corridorminerals.com/news/kazatomprom-resubmits-uranium-one-supply-contract-shareholder-vote-december">second shareholder vote</a>, and Kazakh and Uzbek uranium made up about a third of <a href="https://corridorminerals.com/news/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025">deliveries to US and EU utilities</a> in 2025.</p>
<p>The MD&amp;A puts JV Inkai's estimated average life of mine operating cash cost at C$12.94 a pound, well below Cameco's purchase price, which is where Cameco's share of the venture's profit comes from. The filing gives no fourth quarter production plan by month.</p><p><a href="https://corridorminerals.com/news/cameco-inkai-uranium-output-8-1-million-pounds-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan plans 21 more logistics centres by 2030 and terminals abroad</title><link>https://corridorminerals.com/news/kazakhstan-plans-21-logistics-centres-2030-terminals-abroad-transit</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-plans-21-logistics-centres-2030-terminals-abroad-transit</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Kazakhstan has 46 centres in operation and three terminals abroad, with seven more abroad in progress, but the plan names no sites, costs or capacities.</description><category>Policy and Trade</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-plans-21-logistics-centres-2030-terminals-abroad-transit.jpg?v=64e14ede" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh logistics, 21 new logistics centres by 2030</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-plans-21-logistics-centres-2030-terminals-abroad-transit.jpg?v=64e14ede" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-plans-21-logistics-centres-2030-terminals-abroad-transit.jpg?v=64e14ede" length="118839" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan plans to build 21 more logistics centres by 2030, adding to the 46 in operation in the country, Vice Minister of Transport Talgat Lastayev told a government meeting on 29 October, <a href="https://primeminister.kz/ru/news/21-novyy-logisticheskiy-centr-planiruyut-postroit-v-kazahstane-k-2030-godu-32058">the government said</a>.</p>
<p>The plan sits inside a wider programme to make the country a logistics hub between Europe and Asia, the government's account of the meeting said. Beyond its borders, Kazakhstan is building a network of terminals in partner countries to keep transit corridors loaded: 3 are operating and 7 are in progress, Lastayev said, developed mainly by the national railway company KTZ and by other Kazakh logistics operators.</p>
<p>For metal and ore exporters, terminals at both ends decide how much cargo a corridor can carry and at what cost. The account names none of the 21 planned centres or the ten foreign terminals, and gives no investment figure, capacity or opening date for any of them.</p>
<p>Lastayev listed several projects with dates. Construction of the Aral-Caspian trunk route began in August and is to be completed by the end of 2028. On the Kokshetau to Petropavlovsk section, preparatory work is under way this year and construction is to start in 2027. Modernisation of 37 road border crossing points is planned to finish by the end of 2027.</p>
<p>The transport ministry will also introduce single quality requirements for the whole network of national and local roads and check them at every stage of construction and repair, from planning to operation, the account said. The transport sector's information systems are being integrated on a single platform, E-Kolik, which the account says will allow paperless document flow, shorter processing times and more transparent cargo flows along the whole route.</p>
<p>For air transit between Europe and Asia, the government plans to reconstruct all runways and terminals within three years, the account said. The main air hubs have been designated and run under a free economic zone regime, and fuelling complexes and cargo terminals are being modernised with rail and road connections.</p>
<p>The national cargo carrier AirCargo has signed a contract and expects its first Airbus A340 in November, with a second aircraft due in March next year, Lastayev said. The carrier's fleet is to reach 10 aircraft. The account does not say whether the aircraft are bought or leased, or when the fleet will reach 10.</p>
<p>The same government meeting heard the energy ministry's plan to <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">commission 13.3 GW of power capacity by 2029</a>, which Corridor Minerals covered in its report on <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">the 13.3 GW plan</a>, and an update on <a href="https://primeminister.kz/ru/news/ispolnenie-poslaniya-prezidenta-20-proektov-geologorazvedki-i-semku-novogo-masshtaba-zapustyat-v-kazahstane-32048">20 geological exploration projects</a> and new-scale mapping, covered in its piece on <a href="https://corridorminerals.com/news/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year">the seven prospective objects</a> due for auction next year.</p>
<p>Port capacity on the Caspian is moving separately. Baiterek and Guoyou signed a memorandum on a <a href="https://corridorminerals.com/news/baiterek-guoyou-kuryk-port-terminal-1-billion-memorandum-shymkent">US$1bn terminal at Kuryk port</a> this week, with a first phase designed for 15 million tonnes a year, and Corridor Minerals' <a href="https://corridorminerals.com/news/corridor-freight-watch-2026-11-metals-baseline">Corridor Freight Watch</a> tracks the metal volumes that move through the corridor each month.</p>
<p>The account does not say how the 21 centres will be financed, whether they will be state or private, or how much of their capacity is meant for transit as against domestic cargo. Until the ministry publishes a list, the 21 is a target rather than a set of projects that shippers can plan around.</p><p><a href="https://corridorminerals.com/news/kazakhstan-plans-21-logistics-centres-2030-terminals-abroad-transit">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Türkiye&#x27;s Milli Enerji 2040 plan foresees US$100bn of grid investment</title><link>https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained</link><guid isPermaLink="true">https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The energy ministry launches the 2040 vision on 5 November; here is what it has said so far, and what electricity buyers in industry still do not know.</description><category>Energy Transition</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained.jpg?v=19225012" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Explainer, Milli Enerji 2040 before its launch</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained.jpg?v=19225012" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained.jpg?v=19225012" length="113829" type="image/jpeg"/><content:encoded><![CDATA[<p>Türkiye will launch Milli Enerji 2040, its energy vision to 2040, in Istanbul on 5 November, and expects about US$100bn of investment in electricity transmission and distribution under it, Energy Minister Alparslan Bayraktar <a href="https://enerji.gov.tr/haber-detay?id=31954">said</a>.</p>
<p>Bayraktar made the announcement at an electricity distribution sector event, the energy ministry said on 26 October. Bayraktar said the work on what he called a new energy architecture to 2040 is nearly complete, and has not yet published the document. This explainer sets out what the ministry has said ahead of the launch.</p>
<p>The plan starts from rising electricity use. Bayraktar said Türkiye is entering a period in which the use of electricity will grow in every part of the economy, from industry and transport to buildings and agriculture. Electric vehicles, the electrification of production processes, artificial intelligence and the growth of data centres will raise both the amount of demand and its character, he said.</p>
<p>Electricity made up 15 per cent of final energy consumption in 2002 and 21 per cent today, according to the minister. In industry the share has reached 30 per cent and in buildings 33 per cent. The ministry did not give the year of the latest figures.</p>
<p>The minister's message was that generation alone is not the plan. Transmission and distribution, storage, digital technology and system management have to be developed together, he said, and the US$100bn is for the grid side. He also said the ministry wants domestic software in wide use across the distribution network and the network protected against cyber attacks.</p>
<p>Türkiye's installed power capacity reached 127,355 MW at the end of September, the <a href="https://enerji.gov.tr/haber-detay?id=31953">ministry said on 25 October</a>. Renewable capacity was 80,315 MW, or 63.1 per cent of the total, and domestic sources made up 72.1 per cent. Solar stood at 28,222 MW and wind at 15,540 MW, together 43,762 MW. In September, domestic sources met 70.3 per cent of electricity generation, Bayraktar said. Corridor Minerals set out those figures in its <a href="https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026">data piece on the September capacity</a>.</p>
<p>The launch comes four days before COP31, the <a href="https://unfccc.int/cop31">UN climate conference</a> that Türkiye hosts in Antalya from 9 to 20 November. Bayraktar said the strengthening of electricity grids will be one of the main energy transition subjects on Türkiye's COP31 agenda, including distribution modernisation, digitalisation, the integration of renewables and the financing of grid investment.</p>
<p>For metal producers, the 30 per cent industrial figure is the one to follow. Turkish steel output and export markets are covered in Corridor Minerals' reports on <a href="https://corridorminerals.com/news/turkiye-steel-output-nine-months-2026-cis-kazakhstan-worldsteel">Turkish steel output</a> and on <a href="https://corridorminerals.com/news/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis">Erdemir's third quarter</a>.</p>
<p>What the statements so far do not give is a timetable for the US$100bn, the split between transmission and distribution, how the investment will be financed, or any generation, storage or demand targets for 2040. Those are the figures industrial buyers will look for on 5 November.</p><p><a href="https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Aksa Enerji brings its storage-backed Kırşehir solar plant online</title><link>https://corridorminerals.com/news/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation</link><guid isPermaLink="true">https://corridorminerals.com/news/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The Alıç plant pairs 48.17 MW of solar with 48.17 MWh of storage, part of an 891 MW storage-backed portfolio the company listed in January.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation.jpg?v=841a923d" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Türkiye, power, Solar with storage enters service in Kırşehir</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation.jpg?v=841a923d" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation.jpg?v=841a923d" length="116411" type="image/jpeg"/><content:encoded><![CDATA[<p>Aksa Enerji has started commercial operation of its Alıç solar plant with storage in Kırşehir province after an energy ministry acceptance covering 48.17 MW of installed capacity and 48.17 MWh of storage, the company <a href="https://www.kap.org.tr/tr/Bildirim/1687483">said</a> on 26 October.</p>
<p>The company's disclosure to the Public Disclosure Platform says Türkiye's Ministry of Energy and Natural Resources completed a partial acceptance of the plant in central Anatolia. It gives no investment figure or offtake terms. It says the plant follows the company's strategy of diversifying its generation portfolio and that it will keep investing in renewable technologies to meet its 2030 targets.</p>
<p>Aksa's January 2026 <a href="https://www.aksaenerji.com.tr/media/hdwfceb4/yatirimci-sunumu_ocak-2026.pdf">investor presentation</a> listed Alıç at 50 MW, licensed and due for commissioning in June 2026, among 13 storage-backed wind and solar projects with pre-licences or licences in 10 provinces, totalling 891.41 MW, of which 10 projects with 700.5 MW had completed their environmental impact assessments. It put the solar hybrids at 225.5 MW across six sites, from Gaziantep Pamuk (40.5 MW, due in February 2026, which the company said in June had entered commercial operation) to two 50 MW projects in Eskişehir due in July 2027, with Van Zümrüt at 25 MW and Kayseri Fatih at 10 MW. Alıç therefore entered service later than the June date in that schedule, with 48.17 MW accepted so far by the ministry against the 50 MW listed. The presentation also said the company's Mersin wind project with storage had become Türkiye's first storage-backed renewable plant to receive a generation licence from the energy regulator, EPDK, in March 2025, and that Alıç received its own generation licence in December 2025, a month after Gaziantep Pamuk.</p>
<p>Financing came partly from the Industrial Development Bank of Türkiye (TSKB), which signed a US$80 million loan with Aksa Yenilenebilir Enerji, the company's wholly owned renewables subsidiary, to fund Alıç, Gaziantep Pamuk and a 50 MW, 50 MWh standalone storage facility in Şanlıurfa, Para <a href="https://www.paradergi.com.tr/is-dunyasi-kulis/2025/07/29/tskb-ve-aksa-enerjiden-80-milyon-dolarlik-anlasma">reported</a> in July 2025. The loan runs for 11 years with a one-year grace period.</p>
<p>Storage lets a solar plant hold daytime output for later hours, and the acceptance covers both parts of Alıç. Renewables already make up most of the country's installed capacity, as our <a href="https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026">September capacity data</a> showed, and storage-linked projects in the region include the <a href="https://corridorminerals.com/news/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage">Kostanay wind and storage agreement</a> in Kazakhstan.</p><p><a href="https://corridorminerals.com/news/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Erdoğan restates a US$15 billion trade goal with Kazakhstan in Ankara</title><link>https://corridorminerals.com/news/erdogan-tokayev-ankara-talks-15-billion-trade-goal-kazakhstan-turkiye</link><guid isPermaLink="true">https://corridorminerals.com/news/erdogan-tokayev-ankara-talks-15-billion-trade-goal-kazakhstan-turkiye</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Erdoğan, who first named the target in 2025, put trade near US$10 billion in May; transport, energy and defence were also discussed.</description><category>Policy and Trade</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdogan-tokayev-ankara-talks-15-billion-trade-goal-kazakhstan-turkiye.jpg?v=6f16f1f3" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan and Türkiye, trade, A US$15 billion goal, restated in Ankara</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdogan-tokayev-ankara-talks-15-billion-trade-goal-kazakhstan-turkiye.jpg?v=6f16f1f3" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdogan-tokayev-ankara-talks-15-billion-trade-goal-kazakhstan-turkiye.jpg?v=6f16f1f3" length="123004" type="image/jpeg"/><content:encoded><![CDATA[<p>Turkish President Recep Tayyip Erdoğan told Kazakh President Kassym-Jomart Tokayev at expanded-format talks in Ankara on 28 October that the two countries aim to raise bilateral trade to US$15 billion and deepen investment ties, Tokayev's office <a href="https://www.akorda.kz/en/presidents-of-kazakhstan-and-trkiye-hold-expanded-format-talks-2892351">said</a>.</p>
<p>The Akorda readout quotes Erdoğan as saying the two sides intend to take practical steps at the next meeting of their Strategic Cooperation Council, and that the talks covered transport and logistics, energy, artificial intelligence, agriculture and the defence industry. Tokayev said Türkiye is one of Kazakhstan's five largest trading partners and ranks among the ten largest investors in the country. The readout gives no current trade figure and lists no agreements signed at the meeting, which came ahead of the 13th summit of the Organization of Turkic States in Ankara.</p>
<p>The target is not new. Erdoğan named it at a joint press conference with Tokayev in Ankara in July 2025, saying Türkiye was taking all necessary steps to raise annual trade to US$15 billion, Türkiye's Directorate of Communications <a href="https://www.iletisim.gov.tr/english/dis_basinda_turkiye/detay/turkiye-and-kazakhstan-aim-to-increase-trade-volume-to-15-billion-dollars-azerbaijan">reported</a>, citing AZERTAC. He repeated it after his state visit to Kazakhstan in May, telling reporters on the flight home that trade stood at US$10 billion, that nearly 5,500 Turkish companies had investments in Kazakhstan reaching US$6 billion and that projects taken on by Turkish contractors were worth US$30 billion, Bloomberg HT <a href="https://www.bloomberght.com/erdogan-kazakistan-la-ticaret-hacmini-15-milyar-dolara-cikarmak-istiyoruz-3777904">reported</a>. The two presidents signed a Declaration on Eternal Friendship and Enhanced Strategic Partnership on that visit, the Akorda readout recalls.</p>
<p>Kazakhstan's own preliminary figures cover the first eight months of this year. The Bureau of National Statistics' <a href="https://stat.gov.kz/api/iblock/element/519027/file/en/">foreign trade release</a> of 15 October shows Türkiye took 7.9 per cent of Kazakhstan's exports of US$60.4 billion in January to August 2026, behind Italy (18.0 per cent), China (17.6 per cent) and Russia (8.5 per cent) and ahead of France (6.1 per cent) and the Netherlands (5.9 per cent), and supplied 2.1 per cent of its imports of US$42.6 billion. On those shares, two-way trade came to about US$5.7 billion in eight months, our calculation. Erdoğan did not say which period his US$10 billion figure covered, and the Akorda readout does not say how the target is measured.</p>
<p>Metals are a large part of the flow. Türkiye bought 59 per cent of the value of the refined copper Kazakhstan exported in the first eight months of 2026, as our <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">reading of the customs tables</a> showed. Türkiye's own metals demand is tracked in our <a href="https://corridorminerals.com/news/turkiye-steel-output-nine-months-2026-cis-kazakhstan-worldsteel">nine-month steel data</a>. The readout sets no timetable for reaching the new figure.</p><p><a href="https://corridorminerals.com/news/erdogan-tokayev-ankara-talks-15-billion-trade-goal-kazakhstan-turkiye">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan pays UZS 642.1bn in rooftop solar subsidies in nine months</title><link>https://corridorminerals.com/news/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Payments to 70,700 Solar Home participants are 52.7 times the 2024 total; Bukhara, Khorezm and Karakalpakstan take nearly half.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026.jpg?v=8a3344c1" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan solar, Rooftop solar subsidies reach UZS 642.1bn</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026.jpg?v=8a3344c1" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026.jpg?v=8a3344c1" length="127348" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan paid UZS 642.1 billion from the state budget to 70,700 individuals who delivered surplus power from their rooftop solar panels to the grid in January to September 2026, <a href="https://t.me/minenergy_uz/21537">the energy ministry said</a> on 30 October.</p>
<p>The exact sum is UZS 642 billion 112.1 million, the post says, paid under the Solar Home programme. It repeats the figures of a post published the same morning by <a href="https://t.me/fiskaltahlil/1593">Fiskal tahlillar</a>, a channel that publishes tax administration data, and neither post gives the volume of electricity behind the payments.</p>
<p>Three regions received the largest sums: Bukhara region UZS 116.7 billion, Khorezm region UZS 115.3 billion and the Republic of Karakalpakstan UZS 77.2 billion. Together that is UZS 309.2 billion, or 48.2 per cent of the national figure on the Data Desk's division. The posts do not break down the remaining UZS 332.9 billion between the other regions and Tashkent city.</p>
<h2>How the payment is set</h2>
<p>The programme was created by <a href="https://lex.uz/docs/6385720">presidential resolution PP-57 of 16 February 2023</a> for small solar installations of up to 50 kW in households and started on 1 April 2023. The resolution sets a subsidy of UZS 1,000 from the state budget for each kWh of surplus electricity from panels on property owned by individuals that is delivered to the unified power system.</p>
<p>The subsidy is calculated at the end of each month on the positive difference between the electricity a household delivers to the grid and the electricity it takes from it, and the tax authorities transfer it through the Soliq mobile app by the 25th of the following month, the resolution says. A household that delivers more than it consumes in a month pays nothing to the regional electricity networks company for that month.</p>
<p>At that rate, UZS 642.1 billion corresponds to about 642 million kWh of net supply to the grid, a Data Desk calculation that assumes every payment was made at UZS 1,000 per kWh. Because each payment follows the month of supply, payments made in January to September would mostly cover electricity delivered from December 2025 to August 2026, on the resolution's timetable; the posts do not state the supply period. For scale, the 500 MW Forish solar plant generated 897 million kWh between the start of the year and 24 October, <a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">as Corridor Minerals reported</a> from the ministry's figures.</p>
<h2>More than fifty times the 2024 payments</h2>
<p>The programme was far smaller in 2024. In January 2025 <a href="https://t.me/minenergy_uz/14747">the ministry said</a> 10,826 individuals had received UZS 12.182 billion in 2024 for 12,182,090 kWh delivered to the grid, which matches the UZS 1,000 rate. The largest sums then went to Khorezm region, UZS 2.8 billion, Karakalpakstan, UZS 1.9 billion, and Tashkent city, UZS 1.4 billion.</p>
<p>Nine months of 2026 therefore paid 52.7 times the full-year 2024 sum to 6.5 times as many people, and the average payment per recipient rose to about UZS 9.1 million from about UZS 1.1 million, on the Data Desk's division. The documents opened for this piece give no total for 2025.</p>
<p>The payments are a charge on the state budget that rises with net rooftop supply, and the power they pay for reaches the same grid that supplies mines and metals plants. The statistics committee's investment data show the share of fixed investment going to electricity, gas, steam and air conditioning supply fell to 6.7 per cent in January to September from 12.9 per cent a year earlier, <a href="https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026">as Corridor Minerals reported</a>.</p>
<p>Method: sums are as the ministry's posts of 30 October 2026 and 29 January 2025 give them; the regional share, the ratios, the averages and the implied kWh are the Data Desk's arithmetic on those sums and on the rate in resolution PP-57.</p><p><a href="https://corridorminerals.com/news/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbek grid nearly doubles transformer power at 10 Tashkent substations</title><link>https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>New transformers add 333.2 MVA before winter, with Qorasuv up from 53.6 to 138.6 MVA, as output on 29 October ran 15.9 per cent above a year earlier.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations.jpg?v=ab2fe8f0" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan grid, Tashkent substations reach 699.8 MVA</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations.jpg?v=ab2fe8f0" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations.jpg?v=ab2fe8f0" length="126747" type="image/jpeg"/><content:encoded><![CDATA[<p>National Electric Grid of Uzbekistan has replaced power transformers at 10 substations in Tashkent, raising their combined capacity from 366.6 MVA to 699.8 MVA ahead of the autumn and winter season, <a href="https://t.me/minenergy_uz/21521">the energy ministry said</a> on 28 October.</p>
<p>The work adds 333.2 MVA of transformer capacity in the capital, the post says. Its stated aims are to raise the load the networks can carry, reduce the risk of supply interruptions and give households and businesses stable electricity. MVA measures the apparent power a transformer can pass, not the output of a power plant.</p>
<p>The largest single change is at the Qorasuv substation, where capacity rose from 53.6 MVA to 138.6 MVA, an increase of 85 MVA. Istiqbol went from 80 MVA to 126 MVA and Bibliotechnaya from 53.2 MVA to 90 MVA. Yangi Tuzel grew almost fourfold, from 12.6 MVA to 50 MVA, the steepest rise in proportion.</p>
<p>Five of the 10 substations now have 50 MVA: Saziit, up from 20 MVA, Risovaya from 32 MVA, Yangi Tuzel, Charogon from 26 MVA and Gornaya from 30 MVA. Vistavochnaya rose from 50 MVA to 80 MVA and Tuzel from 10 MVA to 16 MVA, the smallest of the 10.</p>
<p>The station figures in the post add up to 367.4 MVA before and 700.6 MVA after, 0.8 MVA more than each of the stated totals, on the Data Desk's addition. The difference between the two sums, 333.2 MVA, matches the stated addition; the post does not explain the 0.8 MVA gap between the station figures and its totals.</p>
<p>The upgrade comes as output rises. Uzbekistan generated 255.5 million kWh of electricity on 29 October, 35 million kWh or 15.9 per cent more than on the same day of 2025, <a href="https://t.me/minenergy_uz/21539">the ministry's daily figure shows</a>. The post's breakdown by type of plant adds up to 267.8 million kWh, 12.3 million kWh more than the stated total, and the post does not reconcile the two.</p>
<p>The same grid company is the counterpart in a wider programme. The Asian Development Bank's <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">US$200 million loan</a>, signed in October, will upgrade 60 critical distribution substations across Uzbekistan and strengthen the operational capabilities of JSC National Electric Grid of Uzbekistan; the bank says aging infrastructure, electricity losses and overloaded equipment have made reliable service harder, <a href="https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation">as Corridor Minerals reported</a>. The ministry's post does not say how the Tashkent work was financed or whether any of the 10 substations is part of that programme.</p>
<p>Network capacity and generating capacity are separate constraints. At the annual peak load on 10 December 2024, plants in the Central Asian Unified Power System had 36.4 GW installed but only 28.8 GW available, <a href="https://eabr.org/en/press/detail/edb-proposes-a-framework-for-power-connectivity-in-central-asia-better-system-management-not-just-mo/">the Eurasian Development Bank said</a> on 29 October, a gap <a href="https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained">Corridor Minerals explained</a> this week. Larger transformers let a substation take more load, but they do not add electricity to the system.</p>
<p>For industrial users in and around the capital, the post gives the transformer capacity now installed at each named substation, one measure of the load those nodes can take; it does not say how much new connected load the upgrade allows.</p><p><a href="https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Mirziyoyev proposes 100 joint Turkic projects with rare minerals a priority</title><link>https://corridorminerals.com/news/mirziyoyev-turkic-world-100-projects-rare-minerals-processing-ots-ankara</link><guid isPermaLink="true">https://corridorminerals.com/news/mirziyoyev-turkic-world-100-projects-rare-minerals-processing-ots-ankara</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The Ankara summit plan would draw on the Turkic Investment Fund, while Turkish groups OYAK and EKSİM discussed geology projects in Uzbekistan.</description><category>Critical Minerals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/mirziyoyev-turkic-world-100-projects-rare-minerals-processing-ots-ankara.jpg?v=9d8e2a32" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Turkic states, A 100-project plan led by minerals processing</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/mirziyoyev-turkic-world-100-projects-rare-minerals-processing-ots-ankara.jpg?v=9d8e2a32" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/mirziyoyev-turkic-world-100-projects-rare-minerals-processing-ots-ankara.jpg?v=9d8e2a32" length="126981" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbek President Shavkat Mirziyoyev proposed on 30 October that the Organization of Turkic States adopt a programme of one hundred strategic joint investment and industrial projects, with priority for the full processing of rare and strategic minerals, <a href="https://president.uz/en/lists/view/9801">his office said</a>.</p>
<p>He made the proposal at the organisation's 13th summit in Ankara, attended by President Recep Tayyip Erdoğan of Türkiye, President Kassym-Jomart Tokayev of Kazakhstan, President Sadyr Japarov of the Kyrgyz Republic, President Serdar Berdimuhamedov of Turkmenistan, Azerbaijan's foreign minister Jeyhun Bayramov and the organisation's Secretary General, Kubanychbek Omuraliev. The summit adopted the Ankara Declaration and other documents, backed Uzbekistan's candidate Mirvokhid Azimov for the post of Secretary General and agreed to hold next year's summit in Uzbekistan, the presidential account says.</p>
<p>The <a href="https://president.uz/en/lists/view/9800">published text of the address</a> names the programme Turkic World 100 and sets out how the projects would be paid for. "Of particular importance is allocating the resources from the Turkic Investment Fund and international financial institutions towards the implementation of these projects," Mirziyoyev said. Priority, he said, should go to the full processing of rare and strategic minerals, local production of equipment for green energy and the manufacture of high value added products. He described the member states as countries with abundant natural resources and considerable economic potential.</p>
<p>For miners and metal processors in the region, the order of that list matters: it puts processing, rather than extraction, first. The address does not name any of the hundred projects, any deposit or the amount the Turkic Investment Fund would contribute, and the presidential account does not say whether the summit adopted the programme or heard it as a proposal.</p>
<p>Mirziyoyev also proposed cooperation with third countries in an "Organization of Turkic States Plus" format, starting with meetings of sectoral ministers on concrete joint projects in trade, transport and investment. To protect entrepreneurs, he called for a multilateral treaty on mutual legal assistance in commercial matters and a digital platform for exchanging requests and documents, which would matter to companies that hold assets in more than one member state.</p>
<h2>A network of logistics hubs</h2>
<p>On transport, he called for the Middle Corridor and the routes connected to it to be turned into an integrated economic system, and proposed a network of logistics hubs across the Turkic states under joint management, so that member states take a larger part in international freight. The World Bank has set out what targeted investment in the same corridor could deliver, as Corridor Minerals reported in its <a href="https://corridorminerals.com/news/world-bank-trans-caspian-corridor-report-gdp-jobs-2040-investment-needs">summary of the bank's corridor study</a>. The address gives no list of hubs, locations or costs.</p>
<h2>Geology on the agenda with OYAK and EKSİM</h2>
<p>On the sidelines of the summit on 29 October, Mirziyoyev received Murat Yalçıntaş, CEO of OYAK. OYAK expressed interest in joint investment projects in the chemical industry, geology and construction in Uzbekistan, and in building residential complexes and infrastructure in New Tashkent, <a href="https://president.uz/en/lists/view/9796">the presidential press service said</a>.</p>
<p>He also met Ebubekir Tivnikli, chairman of the board of EKSİM Holding. Their talks covered renewable energy, geology and mining, infrastructure, electric vehicle charging stations and the food industry, as well as the construction of new power transmission lines in Uzbekistan and "promising projects in geology", <a href="https://president.uz/en/lists/view/9798">according to the account of the meeting</a>.</p>
<p>Neither account names a deposit, a value or a timetable, so both meetings record interest rather than agreements.</p>
<h2>Where the plan meets existing programmes</h2>
<p>Uzbekistan already runs its own critical minerals programme for 2026 to 2030, which Corridor Minerals set out in an <a href="https://corridorminerals.com/news/uzbekistan-4-2-billion-critical-minerals-programme-explained">explainer on the programme</a>. On 19 October the foreign ministers of the five Central Asian states and the United States adopted a <a href="https://corridorminerals.com/news/c5-1-samarkand-joint-statement-geological-data-minerals-analysis">C5+1 statement in Samarkand</a> that spoke of exchanging expertise on geological data but named no projects. Earlier in October, at the meeting of Central Asian heads of state in Avaza, Mirziyoyev called for faster work on a regional critical minerals alliance, as Corridor Minerals reported in its <a href="https://corridorminerals.com/news/mirziyoyev-central-asia-critical-minerals-alliance-avaza">report from Avaza</a>. A Turkic programme would add another channel through which the same deposits could be offered to partners.</p>
<p>For now the programme is a proposal without a list of projects. The next point at which leaders meet is the summit in Uzbekistan next year, and the address does not say whether member states are to submit projects before then.</p><p><a href="https://corridorminerals.com/news/mirziyoyev-turkic-world-100-projects-rare-minerals-processing-ots-ankara">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>World Bank approves $100m loan for Uzbekistan&#x27;s power distribution grid</title><link>https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan</link><guid isPermaLink="true">https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>With ADB&#x27;s $200m and $71m from the state budget, the $371m programme covers 60 substations and aims to cut losses there by 20,000 MWh a year.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan.jpg?v=03b72acb" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek grid, World Bank adds $100m to grid upgrade</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan.jpg?v=03b72acb" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan.jpg?v=03b72acb" length="116000" type="image/jpeg"/><content:encoded><![CDATA[<p>The World Bank's board approved a $100 million loan on 27 October to make Uzbekistan's electricity distribution system more efficient and reliable, <a href="https://www.worldbank.org/en/news/press-release/2026/10/27/uzbekistan-to-modernize-electricity-distribution-systems-enable-job-growth-with-wo">the bank said</a>, adding to the $200 million the Asian Development Bank has lent for the same programme.</p>
<p>With a $71 million contribution from Uzbekistan's budget, the Modernization of Electricity Distribution Systems Program now has $371 million of financing, the World Bank says. The ADB approved its loan with the government on 30 September and <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">signed it in Bangkok on 15 October</a>, as Corridor Minerals reported in its <a href="https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation">report on the ADB loan</a>. The two banks prepare and oversee the programme jointly under their Full Mutual Reliance Framework, which the World Bank says cuts transaction costs and duplicated procedures for the government.</p>
<p>JSC National Electric Grid of Uzbekistan will carry out the programme, modernising and digitalising 60 key substations across the country. By 2031 it is expected to cut losses at the renovated substations by 20,000 MWh a year, help enable at least 3.3 GW of renewable energy and avoid nearly 23,000 tonnes of CO2 equivalent a year. The bank also expects about 11,700 more and better jobs in the five years after the facilities are commissioned.</p>
<p>The programme is aimed at the limit on how much renewable electricity the network can absorb and deliver to households and businesses, the release says. Uzbekistan aims to produce 25 GW of renewable energy by 2030, in the World Bank's words, and much of the distribution network was built decades ago, with many substations overloaded. New wind and solar plants keep connecting, among them the <a href="https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction">300 MW wind farm commissioned in Karakalpakstan</a>.</p>
<p>"Reliable electricity is essential for households and economic activity. It is a foundation for jobs, public services, and economic growth," said Najy Benhassine, the World Bank's Division Director for Central Asia.</p>
<p>The approval was also reported in Tashkent by <a href="https://www.gazeta.uz/en/2026/10/28/wb/">Gazeta.uz</a>. The World Bank release does not list the 60 substations, say how the loan will be disbursed or say when the first upgraded substation will be finished. Industrial users on the distribution network will feel the change only as upgraded substations come into service.</p><p><a href="https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan and Kyrgyzstan move 5.1m tonnes of rail freight in nine months</title><link>https://corridorminerals.com/news/kazakhstan-kyrgyzstan-rail-freight-5-1-million-tonnes-kambarata-talks</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-kyrgyzstan-rail-freight-5-1-million-tonnes-kambarata-talks</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Rail cargo rose 8.3 per cent as Bishkek talks pursued a $3bn trade goal, and Uzbek and Kyrgyz ministers discussed Kambarata-1 the same week.</description><category>Policy and Trade</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-kyrgyzstan-rail-freight-5-1-million-tonnes-kambarata-talks.jpg?v=3519e2a5" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh-Kyrgyz trade, Rail freight with Kyrgyzstan grows</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-kyrgyzstan-rail-freight-5-1-million-tonnes-kambarata-talks.jpg?v=3519e2a5" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-kyrgyzstan-rail-freight-5-1-million-tonnes-kambarata-talks.jpg?v=3519e2a5" length="122399" type="image/jpeg"/><content:encoded><![CDATA[<p>Rail freight between Kazakhstan and Kyrgyzstan reached 5.1 million tonnes in January to September, 8.3 per cent more than a year earlier, <a href="https://primeminister.kz/ru/news/premer-ministry-kazahstana-i-kyrgyzstana-prinyali-uchastie-vo-vtorom-forume-mezhregionalnogo-sotrudnichestva-v-bishkeke-32063">Kazakhstan's government said</a> during Prime Minister Olzhas Bektenov's official visit to Bishkek on 30 October.</p>
<p>Rail volumes rose 10 per cent last year to 6.8 million tonnes and road freight grew 37 per cent to 3.7 million tonnes, the government's account of the second Kazakh-Kyrgyz interregional forum says. Bilateral trade rose 33 per cent in 2025 to $2.4 billion and is up a further 20 per cent this year, the account says, against a target of $3 billion set by Presidents Kassym-Jomart Tokayev and Sadyr Japarov.</p>
<p>The nine-month rail figure implies about 4.7 million tonnes in the same months of 2025, by Corridor Minerals' arithmetic, so rail freight is running about 0.4 million tonnes ahead of last year. The account does not give a nine-month road figure, so the two modes cannot be compared for this year.</p>
<p>The forum brought together the heads of Almaty, Zhambyl, East Kazakhstan, Akmola, Karaganda and Zhetysu regions and of the cities of Almaty and Turkestan, with the heads of Issyk-Kul, Chui, Talas, Osh, Jalal-Abad and Naryn regions of Kyrgyzstan. It looked at direct links between regions and joint projects in trade, investment, industry, transport and logistics and tourism, and ended with documents on twinning, including one between Almaty and Bishkek for 2026 to 2030.</p>
<p>The forum treated Zhambyl region as a key centre of cross-border trade and logistics. It holds 7 of the 8 crossing points on a shared border of about 1,200 km and more than 1,000 enterprises with Kyrgyz participation, and an industrial trade and logistics complex is being developed there as a joint project. The account gives no cost, capacity or opening date for the complex.</p>
<h2>Permits, crossings and water</h2>
<p>At the 14th meeting of the Kazakh-Kyrgyz intergovernmental council the same day, Bektenov and Adylbek Kasymaliev, Chairman of the Cabinet of Ministers and Head of the Presidential Administration of the Kyrgyz Republic, discussed trade, agriculture, water, transit, space, aviation and digital projects, <a href="https://primeminister.kz/ru/news/14-oe-zasedanie-kazahstansko-kyrgyzskogo-mezhpravitelstvennogo-soveta-v-bishkeke-olzhas-bektenov-i-adylbek-kasymaliev-obsudili-narashchivanie-tovarooborota-32064">the government said</a>. The launch of the border industrial trade and logistics complex and deeper cooperation in the base industries of the economy would help reach the $3 billion goal, Bektenov said. "To increase trade further, we need to develop cooperation in transport and transit, agriculture and other sectors of the economy," he said.</p>
<p>Electronic exchange of permits is in place on the shared border, the number of permits is to rise to 5,000 and 8 road checkpoints are being modernised in phases, the account says. Agricultural trade rose 41.5 per cent in 2025 to more than $500 million. Regular flights between the two countries rose 19 per cent to 19 a week, and the sides discussed exchanging satellite data. On water, the two sides discussed further work under a programme for the rapid exchange of hydrometeorological data signed in Astana in February, the legal basis for cooperation and the operation of interstate water facilities. The council's final protocol was signed, and the account does not publish its text.</p>
<h2>Kambarata-1 on the Uzbek agenda</h2>
<p>Two days earlier, on 28 October, Uzbekistan's energy minister Sherzod Khodjayev met his Kyrgyz counterpart Altinbek Risbekov, <a href="https://t.me/minenergy_uz/21515">the Uzbek energy ministry said</a>. They discussed mutual supply and transit of electricity, the stable operation of the Central Asian unified power system and joint measures to get through the autumn and winter without disruption, and exchanged views on joint projects including the Kambarata-1 hydropower plant. The ministry's post gives no capacity, cost or timetable for the plant.</p>
<p>The World Bank lists a <a href="https://projects.worldbank.org/en/projects-operations/project-detail/P504168">Kambarata-1 HPP: Sustainable and Transformational Energy Program</a> for the Kyrgyz Republic with $200 million of proposed IDA financing; the programme is still at pipeline status, so the bank's board has not approved it. Winter supply is why the plant matters beyond Kyrgyzstan: the Eurasian Development Bank found that a large part of the region's installed capacity could not run at the December 2024 peak, as Corridor Minerals set out in its <a href="https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained">explainer on the bank's study</a>.</p>
<p>Neither Kazakh account breaks the freight down by commodity, so the figures do not show how much of the cargo is ore, concentrate or metal. Corridor Minerals' <a href="https://corridorminerals.com/news/corridor-freight-watch-2026-11-metals-baseline">Corridor Freight Watch</a> tracks the metal share of regional freight each month from official data.</p><p><a href="https://corridorminerals.com/news/kazakhstan-kyrgyzstan-rail-freight-5-1-million-tonnes-kambarata-talks">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Metallurgy makes a quarter of Uzbekistan&#x27;s industrial output</title><link>https://corridorminerals.com/news/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Metallurgy reached UZS 243.6 trillion and mining UZS 57.8 trillion in eight months, the statistics office says; Navoi region makes 65 per cent of it.</description><category>Metals</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026.jpg?v=6da975a6" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan industry, Metallurgy makes a quarter of Uzbek industrial output</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026.jpg?v=6da975a6" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026.jpg?v=6da975a6" length="136475" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's metallurgical industry produced nearly UZS 243.6 trillion of output in January to August 2026, 7.8 per cent more than a year earlier, <a href="https://stat.uz/en/press-center/news-of-committee/70573-metallurgiya-sanoati-azhmi-243-6-trln-s-mga-etdi-4">the National Statistics Committee said</a> on 13 October, more than four times the UZS 57.8 trillion of mining and quarrying.</p>
<p>The committee's mining release of 23 October puts the country's industrial output at UZS 926.5 trillion for the eight months, 8 per cent higher than a year earlier. Set against that total, metallurgy accounts for 26.3 per cent of everything Uzbek industry produced, a Data Desk calculation, and for 30.2 per cent of the UZS 805.7 trillion of manufacturing output.</p>
<p>Most of the output value comes from two regions. Navoi region produced UZS 157.6 trillion, or 64.7 per cent of the national figure, and Tashkent region UZS 62 trillion, or 25.5 per cent, on the committee's regional table and the Data Desk's division.</p>
<p>Tashkent city follows with UZS 14.5 trillion and Samarkand region with UZS 6.2 trillion, so four regions account for 98.6 per cent of the output. The other ten regions produced between UZS 23.8 billion, in Kashkadarya, and UZS 898.3 billion, in Namangan, about UZS 3.2 trillion between them. The 14 regional figures add up to about UZS 243.5 trillion, within rounding of the headline.</p>
<h2>Navoi's share slips through the year</h2>
<p>Navoi's weight has eased as the year has gone on. In the committee's January to April release, Navoi's UZS 77.7 trillion was 66.8 per cent of a national UZS 116.4 trillion, and in <a href="https://stat.uz/en/press-center/news-of-committee/69865-metallurgiya-sanoati-azhmi-183-trln-s-mdan-oshdi-4">its January to June release</a> UZS 120.7 trillion was 66.0 per cent of nearly UZS 183 trillion, before the 64.7 per cent of the eight-month figures.</p>
<p>Tashkent region moved the other way, from 24.4 per cent in the four-month release to 24.5 per cent at six months and 25.5 per cent at eight. The differences between the cumulative releases give an implied UZS 66.6 trillion of national output for May and June and UZS 60.6 trillion for July and August; on the same arithmetic, Navoi's two-month output fell from UZS 43.0 trillion to UZS 36.9 trillion while Tashkent region's rose from UZS 16.5 trillion to UZS 17.1 trillion. These are Data Desk calculations that inherit the rounding of a six-month figure the committee gives only as nearly UZS 183 trillion.</p>
<p>The growth rates cannot be checked from the releases alone. Each compares its period with the same period of 2025: <a href="https://stat.uz/ru/press-tsentr/novosti-goskomstata/68773-metallurgiya-sanoati-azhmi-116-trln-s-mdan-oshdi-3">the four-month release</a> gives growth of 85.2 per cent, the six-month release 1.3 per cent and the eight-month release 7.8 per cent, but none of the three publishes the 2025 values or says whether the comparison is at current or constant prices, so the Data Desk reports the rates as the committee gives them and does not derive a 2025 base from them.</p>
<h2>Who is in the numbers</h2>
<p>The releases name no companies. Navoi region is home to the Navoi Mining and Metallurgical Company's Muruntau operations, whose <a href="https://corridorminerals.com/news/nmmc-muruntau-conveyor-lines-investor-call-strategy-2035">new conveyor lines Corridor Minerals reported</a> this week, and Tashkent region to the Almalyk mining and metallurgical complex that supplies the copper cathode behind <a href="https://corridorminerals.com/news/uzbekistan-copper-purchase-finance-uzsanoatexport-cathode-300000-tonnes">the purchase finance scheme for cable makers</a>. Uzbekistan's gold exports fell by two-thirds in the first half as the central bank bought the metal instead, as <a href="https://corridorminerals.com/news/uzbekistan-gold-exports-fall-central-bank-holdings-rise-2026">Corridor Minerals reported</a> from the customs and central bank data.</p>
<p>Mining and quarrying, the industry that digs the ore, is a much smaller line in the committee's accounts. <a href="https://stat.uz/en/press-center/news-of-committee/70704-zbekistonda-to-kon-sanoati-azhmi-arijb-58-trln-s-mga-etdi-4">The 23 October release</a> gives it 6.2 per cent of industrial output, just under the 6.3 per cent, or UZS 58.2 trillion, of electricity, gas and steam supply; manufacturing took 87 per cent and water supply and waste 0.5 per cent. The release does not say how it allocates an integrated producer that both mines and refines between the two industries, and the Data Desk makes no assumption.</p>
<p>Navoi is also the largest industrial region by output. <a href="https://stat.uz/en/press-center/news-of-committee/70167-zbekiston-sanoatida-ajsi-ududlar-etakchi-5">Its January to July regional table</a> gives Navoi UZS 182.7 trillion of the UZS 795.4 trillion of industrial output in the seven months, 23.0 per cent on the Data Desk's division, ahead of Tashkent city with UZS 135.4 trillion and Tashkent region with UZS 124.8 trillion.</p>
<h2>Method</h2>
<p>Values come from the committee's press releases of 17 June, 20 August, 10 September, 13 October and 23 October 2026, read in English and Russian; the eight-month metallurgy figures were also reported by Anhor.uz, which cites the committee's Telegram channel. Shares are the Data Desk's division of the published regional and industry values by the published totals; the two-month implied values are differences between cumulative releases and inherit their rounding. Growth rates are quoted as published. The committee's next metallurgy release should cover January to September; its industry releases give values in soums and do not state a price basis or a deflator.</p><p><a href="https://corridorminerals.com/news/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Erdemir&#x27;s quarter leaves less Turkish steel for export buyers</title><link>https://corridorminerals.com/news/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis</link><guid isPermaLink="true">https://corridorminerals.com/news/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Exports fell to 14.6 per cent of a larger sales volume while Türkiye&#x27;s steel imports dropped; what that changes for buyers, rival mills and policymakers.</description><category>Analysis</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis.jpg?v=08d8ce65" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Analysis, Erdemir&#x27;s quarter leaves less steel for export</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis.jpg?v=08d8ce65" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis.jpg?v=08d8ce65" length="127136" type="image/jpeg"/><content:encoded><![CDATA[<p>Erdemir sold 2.15 million tonnes of steel in the third quarter and exported 14.6 per cent of it, down from 19.2 per cent a year earlier, <a href="https://arastirma.isyatirim.com.tr/wp-content/uploads/2026/10/EREGL_3C26_Kar_Analizi_231026-1.pdf">İş Yatırım's note on the results</a> says, about 57,000 fewer tonnes for export customers on Drill Core's arithmetic.</p>
<p>That is the figure in <a href="https://corridorminerals.com/news/erdemir-nine-month-2026-net-profit-tl-11-1bn-third-quarter-flat-steel-sales">the results Corridor Minerals reported on Friday</a> that matters beyond Türkiye. The company's domestic sales rose by about 18 per cent to 1.84 million tonnes, on the same arithmetic from the note's volumes and shares, while exports fell to about 314,000 tonnes from 371,000. Drill Core reads what the quarter changes for three readers: a buyer of Turkish steel, a mill that competes with Erdemir, and a policymaker watching Türkiye's steel trade.</p>
<h2>Buyers: Erdemir's home market took 18 per cent more</h2>
<p>The export tonnage was not a one-quarter dip. Erdemir exported 290,000 tonnes in the second quarter, when it sold 2.1 million tonnes, <a href="https://www.bloomberght.com/erdemir-den-beklentileri-asan-8-5-milyar-tl-lik-net-kr-3784912">Bloomberg HT reported</a> from the company's figures in August, so the third-quarter level of about 314,000 tonnes is a small recovery from a lower base, not a return to the share of 2025. The company ran its crude steel capacity at 96 per cent over the nine months, the note says, so more volume for export would have to come from a smaller home market rather than from idle furnaces.</p>
<p>The home market is not shrinking. Türkiye's finished steel consumption rose 3.3 per cent to 26.6 million tonnes in January to August while imports fell 3.7 per cent to 12.2 million tonnes, on <a href="https://uzmanpara.milliyet.com.tr/uzmanpara/turkiyenin-ham-celik-uretimi-azaldi-7670840">the Türkiye Steel Producers' Association's August figures</a> reported by Milliyet on 1 October. A buyer in the Caucasus or the Mediterranean who priced steel against Erdemir's export offers in 2025 now faces a supplier whose growth went to Turkish customers, in a market whose imports are falling.</p>
<p>For buyers in Central Asia the change is small, because the corridor's own flat steel flows run the other way: Kazakhstan's hot-rolled steel goes mainly to Russia and Uzbekistan, as <a href="https://corridorminerals.com/news/kazakhstan-iron-ore-hot-rolled-steel-exports-russia-china-2026">Corridor Minerals reported</a> from the Bureau of National Statistics' trade tables, and Erdemir's exports and Kazakhstan's do not meet in the same markets.</p>
<h2>Mills: a $100 a tonne benchmark at 96 per cent utilisation</h2>
<p>Erdemir's quarter sets the number a rival mill will be measured against. On the company's definition, earnings before interest, tax, depreciation and amortisation were $100 a tonne, up from $68 a year earlier; the broker's own calculation gives $78, up from $60, and the note believes the gap reflects a non-cash inventory impairment provision that the company appears to add back. Average revenue was $696 a tonne, against $674, the note says, which it links to higher flat steel prices.</p>
<p>Those margins came at a cost in cash. Net debt rose to $1,033m from $849m at the end of June, and free cash flow for the quarter was a negative TL 6.01bn after a TL 7.42bn increase in working capital, on the note's calculations. Inventories reached TL 108.7bn on 30 September, 22 per cent more than at the end of 2025, <a href="https://www.erdemir.com.tr/storage/uploads/2026/10/7ef88f12c1b402ed710acbbece4b5caf.pdf">the interim statements</a> approved on 22 October show, and spending on property, plant and equipment was TL 9.97bn in the nine months against TL 10.87bn a year earlier. On the broker's own definition of capital spending, a different measure from that cash flow line, the note shows a steeper fall, to $315m from $631m.</p>
<p>For a mill adding capacity, such as Qarmet with the <a href="https://corridorminerals.com/news/qarmet-rolling-mill-540000-tonnes-installation-dar-metall">540,000-tonne rolling complex it is installing</a> on the way to a stated 5 million tonne target, the benchmark is the order of Erdemir's numbers: 96 per cent utilisation and a $100 margin first, lower capital spending second. Qarmet publishes no utilisation rate, so the point is the yardstick a lender or a buyer will now hold up, not a comparison of the two mills.</p>
<h2>Policymakers: Türkiye still imports 1.9 million tonnes more than it exports</h2>
<p>Türkiye exported 10.3 million tonnes of steel products worth $7bn in January to August and imported 12.2 million tonnes worth $8.5bn, the association's figures say, a deficit of 1.9 million tonnes and $1.5bn on Drill Core's subtraction. Erdemir's extra domestic tonnes narrow that gap only if they displace imports, which no document yet shows, and its lower exports work the other way; the association's monthly release will show which effect is larger.</p>
<p>The profit line is a separate matter for anyone reading the headline. Erdemir's nine-month profit attributable to shareholders, TL 11.14bn, includes tax income of TL 8.96bn, while the third quarter carried a tax expense of TL 35.5m, the statements show; the broker's table puts the second quarter's tax income at TL 9.49bn. The operating result, TL 4.27bn in the quarter against TL 2.19bn a year earlier on revenue of TL 71.3bn against TL 53.0bn, is the figure that describes the steel business; the nine-month net figure describes the tax accounts. A regulator, a lender or a buyer who benchmarks on the net line will overstate what a quarter at 96 per cent utilisation earns.</p>
<p>What to watch is the fourth-quarter export share. If it stays below 15 per cent while utilisation holds near 96 per cent, Erdemir is selling into its home market for as long as Turkish consumption grows faster than Turkish imports fall. If it moves back towards the 19 per cent of 2025 on sales near this quarter's 2.15 million tonnes, more tonnes will reach export customers again; a higher share of a smaller volume would not, and the share alone will not say whether price or market drove the change.</p><p><a href="https://corridorminerals.com/news/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kumtor doubles its payments to the Kyrgyz state to $627.8m</title><link>https://corridorminerals.com/news/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit</link><guid isPermaLink="true">https://corridorminerals.com/news/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Nine-month revenue passed $1bn and net profit rose 71 per cent, but the third quarter brought in less than the first half&#x27;s quarterly average.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit.jpg?v=d9b9a2ea" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kyrgyzstan gold, Kumtor doubles its payments to the state</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit.jpg?v=d9b9a2ea" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit.jpg?v=d9b9a2ea" length="118150" type="image/jpeg"/><content:encoded><![CDATA[<p>Kumtor Gold Company, which runs the Kumtor gold mine in Kyrgyzstan, paid $627.8m in taxes, dividends and other mandatory payments to the state in the first nine months of 2026, twice the $309.9m of a year earlier, <a href="https://www.kumtor.kg/en/kumt%d3%a9r-mamleketke-t%d2%afsh%d2%af%d2%afch%d2%af-t%d3%a9l%d3%a9md%d3%a9rd%d2%af-eki-ese-k%d3%a9b%d3%a9jtt%d2%af-toguz-ajda-deerlik-628-mln-dollar-kotordu/">the company said</a> on 27 October.</p>
<p>Revenue for January to September rose nearly 38 per cent to $1,012.8m from $735.8m, and net profit 71 per cent to $548.4m from $320.2m, the release shows. It sets both against earlier years: nine-month revenue was $579.8m in 2024 and $558.2m in 2023, and net profit $216.6m and $173.2m, so profit has more than tripled in three years.</p>
<p>Taxes and other mandatory payments, the part of the total that goes to the budget, rose nearly 74 per cent to $277.8m from $159.9m. The comparable figures were $114.7m in 2024 and $124.2m in 2023. The release does not give the dividend figure for the nine months. Subtracting taxes and other mandatory payments from the total leaves $350.0m, a Newsdesk calculation from the release.</p>
<p>Taxes and other mandatory payments took 27 per cent of revenue in the nine months, against 22 per cent a year earlier, on the same basis. The release does not break the total down by tax or say whether rates or the tax base changed. The first-half release gave taxes in soms, KGS 19bn, rather than dollars, so it cannot be set directly against the nine-month figure in dollars.</p>
<h2>A smaller third quarter</h2>
<p>The nine-month figures can be split using the company's <a href="https://www.kumtor.kg/en/kumt%D3%A9r-2026-zhyldyn-6-ajynda-%D3%A9lk%D3%A9-byudzhetine-19-mlrd-som-kotordu/">first-half release</a> of 16 July, which gave revenue of $732.7m and net profit of $418.9m for January to June, and dividends of $300m paid to Kyrgyzaltyn, its sole shareholder. On those figures the third quarter brought in about $280.1m of revenue and $129.5m of net profit, a Newsdesk calculation. Both are below the first half's average of about $366.4m of revenue and $209.5m of profit a quarter.</p>
<p>The same two releases leave the dividend side open. The first half's $300m is below the $350.0m left after taxes in the nine-month total, but neither release says whether the difference is a third-quarter dividend, another payment or a matter of how the two periods were counted.</p>
<p>Neither release gives gold output, ore grades, the price the company realised or costs, so the figures alone do not show what changed in the quarter. Net profit was 54 per cent of revenue for the nine months, against 44 per cent a year earlier, and about 46 per cent in the third quarter, on the same calculation.</p>
<p>For the whole of 2025 Kumtor reported revenue of $1.434bn, net profit of more than $706m and taxes and other mandatory payments of $246.5m, and its shareholder approved dividends of $300m, <a href="https://economist.kg/ekonomika/2026/10/27/kumtor-platezhi-627-8-mln-2026/">Economist.kg reported</a> on 27 October. The same report put the mine's 2025 output at 12.081 tonnes of gold. The release of 27 October gives no production figure for 2026.</p>
<h2>Four and a half years of state management</h2>
<p>In a <a href="https://www.kumtor.kg/en/kumt%d3%a9r-mamlekettik-bashkaruuga-%d3%a9tk%d3%a9n-45-zhyl-ichinde-byudzhetke-12-mlrd-dollardan-ashyk-karazhat-kotoruldu/">release of 21 July</a> covering what it called four and a half years of state management, January 2022 to June 2026, the company put its revenue at $4.99bn and its net profit at $2.20bn. It paid $1.23bn in taxes and other mandatory payments to the budget over the period and $741.3m in dividends to Kyrgyzaltyn, together about $1.97bn, a Newsdesk calculation. Over the same four and a half years the payments to the budget came to about a quarter of revenue.</p>
<p>The nine-month figures were also carried on 27 October by the Bishkek outlets Akchabar and Open.kg, with the same totals; Open.kg attributed them to the company's financial report for the first nine months of the year. Neither added output, cost or price figures for 2026.</p>
<p>Kyrgyzaltyn is also investing in new deposits. It started building a processing plant at its Togolok deposit in September and plans projects worth more than $1bn at five deposits over three years, <a href="https://corridorminerals.com/news/kyrgyzaltyn-togolok-gold-plant-azergold-joint-projects">as Corridor Minerals reported</a>. Elsewhere in the country the Altyn-Tor plant at the Solton-Sary deposit in Naryn region, in which Kyrgyzaltyn holds 35 per cent, began test operations in September (<a href="https://corridorminerals.com/news/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan">see the earlier report</a>).</p>
<p>The 27 October release did not say when Kumtor will publish its full-year figures for 2026 or its production for the year; for 2025, Economist.kg reported its annual profit on 1 April.</p><p><a href="https://corridorminerals.com/news/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Solidcore approves US$468m Syrymbet tin mine with first output in 2029</title><link>https://corridorminerals.com/news/solidcore-syrymbet-tin-copper-final-investment-decision-468m</link><guid isPermaLink="true">https://corridorminerals.com/news/solidcore-syrymbet-tin-copper-final-investment-decision-468m</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The Kazakh open pit is planned to produce about 6,000 tonnes of tin a year, at all-in sustaining costs of US$22,200 a tonne of tin equivalent.</description><category>Projects and Deals</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/solidcore-syrymbet-tin-copper-final-investment-decision-468m.jpg?v=95b4a95b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh tin, Solidcore commits to Syrymbet tin</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/solidcore-syrymbet-tin-copper-final-investment-decision-468m.jpg?v=95b4a95b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/solidcore-syrymbet-tin-copper-final-investment-decision-468m.jpg?v=95b4a95b" length="108310" type="image/jpeg"/><content:encoded><![CDATA[<p>Solidcore Resources' board has approved construction of the US$468 million Syrymbet tin and copper mine in northern Kazakhstan, with first production due in the second half of 2029, the company <a href="https://www.solidcore-resources.com/en/investors-and-media/news/press-releases/29-10-2026/">said on 29 October</a>.</p>
<p>Syrymbet, in the Ayirtau district of North Kazakhstan region about 80 km north-west of Kokshetau, is planned as a conventional open pit with a 10-year life from 2029 to 2038. A plant treating 2.5 million tonnes of ore a year will recover tin by gravity separation and copper by flotation, and sell a tin concentrate grading about 50 per cent and a copper concentrate grading about 20 per cent to third-party buyers. Solidcore holds 55 per cent and its partner, Lancaster Group, the rest; every figure in the release is for 100 per cent of the project.</p>
<h2>About 6,000 tonnes of tin a year</h2>
<p>The mine plan rests on Ore Reserves under the JORC Code of 24.2 million tonnes of primary ore in the Central pit, at 0.42 per cent tin and 0.15 per cent copper, containing 100.8 thousand tonnes of tin and 36.3 thousand tonnes of copper. With expected recoveries of 53 to 55 per cent for tin and 79 per cent for copper, the company estimates life-of-mine output of 53,000 tonnes of tin and 29,000 tonnes of copper in concentrate, which the release also expresses as approximately 6,000 tonnes of tin and 4,000 tonnes of copper a year; full ramp-up is due in 2030. The pit will move 6.3 tonnes of waste for each tonne of ore.</p>
<p>The reserve is a part of the deposit. The Mineral Resource for the Central area, estimated by CSA Global in 2018, is 90.3 million tonnes at 0.39 per cent tin, containing 350.8 thousand tonnes of tin, of which 113.9 thousand tonnes are in the Inferred category. The plan covers primary ore only: oxidised ore from the Central pit and the flanks will be mined and stockpiled until a processing method is chosen, with processing possibly starting after 2038. A first 10 km drilling programme on the North-Eastern, South-Western and Sarybulak zones is planned for 2027 and 2028, and resource estimates for them are expected in 2029.</p>
<h2>Costs, prices and the money</h2>
<p>Solidcore puts life-of-mine total cash costs at US$20,600 and all-in sustaining costs at US$22,200 a tonne of tin equivalent, and the internal rate of return at 19 per cent, using a mid-cycle tin price of US$42,000 a tonne, copper at US$12,000 a tonne and an exchange rate of 450 tenge to the dollar. About 60 per cent of the start-up capital is to be spent locally.</p>
<p>The project will be paid for with bank loans and with cash contributions from the two partners in proportion to their holdings. On simple arithmetic, Solidcore's 55 per cent share of the capital cost is about US$257 million; the release does not say how much will be borrowed, and it names no lenders. Solidcore will operate Syrymbet and accounts for it as a joint venture under the equity method.</p>
<p>The budget is larger than the sum given in August, when Solidcore's subsidiary Tin One Mining signed a memorandum with a department of the North Kazakhstan regional administration and said it expected to put at least KZT 150 billion, then more than US$315.5 million, into the deposit, the plant and related infrastructure once the board approved the project. That <a href="https://www.solidcore-resources.com/en/investors-and-media/news/press-releases/07-08-2026/">August release</a> described Syrymbet as the largest undeveloped tin deposit in Central Asia, holding more than 70 per cent of Kazakhstan's tin reserves.</p>
<h2>A schedule that starts this year</h2>
<p>The release's timetable lists state expert review of the project documents for the infrastructure and the plant, and the start of construction of the main facilities, in the third quarter of 2026; open-pit mining from the third quarter of 2027; completion of the plant and tailings storage facility in the second quarter of 2029; and full ramp-up in 2030. An environmental and social impact assessment to international lenders' standards began in September 2026, with public disclosure expected in the fourth quarter of 2027. The company expects to create more than 800 permanent jobs.</p>
<p>Solidcore describes itself as a gold producer with two operating mines in Kazakhstan and two growth projects, Syrymbet and the <a href="https://corridorminerals.com/news/solidcore-ertis-pox-700-million-debt-package">Ertis POX gold concentrate processing hub</a> (see <a href="https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners">who owns Kazakhstan's copper and gold producers</a>). Solidcore agreed in October 2024 to buy its 55 per cent from Berkut Mining, a Lancaster Group subsidiary, for US$82.5 million in cash. "Solidcore made the commitment to a strategic metal with strong long-term demand driven by the energy transition with limited global supply opportunities," Vitaly Nesis, Solidcore's chief executive, said in the release. The decision was also <a href="https://www.trend.az/casia/kazakhstan/4240665.html">reported by Trend</a> on the same day.</p><p><a href="https://corridorminerals.com/news/solidcore-syrymbet-tin-copper-final-investment-decision-468m">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>CVK Maden&#x27;s first gold sales bring in 40 per cent of its revenue</title><link>https://corridorminerals.com/news/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar</link><guid isPermaLink="true">https://corridorminerals.com/news/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The Turkish chrome miner sold 11,998 ounces from Sarıalan in nine months and has a US$192m loan for its next project, Yenipazar.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar.jpg?v=4ce464b9" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Türkiye gold, CVK&#x27;s first gold sales lift revenue</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar.jpg?v=4ce464b9" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar.jpg?v=4ce464b9" length="124556" type="image/jpeg"/><content:encoded><![CDATA[<p>CVK Maden İşletmeleri, a Turkish chrome miner new to gold, sold 11,998 ounces of gold in concentrate, which also contains silver, in the first nine months of 2026 for TL 2.22bn, 40 per cent of its revenue, <a href="https://www.kap.org.tr/en/Bildirim/1687050">the company said</a> on 26 October.</p>
<p>Revenue rose to TL 5.58bn from TL 3.11bn a year earlier, an increase of 79 per cent, a Newsdesk calculation from the report. Net profit was TL 1.80bn, against TL 558.3m, and the part attributable to the company's shareholders TL 1.86bn, against TL 509.0m, <a href="https://www.kap.org.tr/en/Bildirim/1687049">the consolidated interim statements</a> show. The statements restate every figure, including those for 2025, in the purchasing power of the lira at 30 September 2026, under inflation accounting.</p>
<p>Chrome still brought in most of the money. The group sold 207,669 tonnes of chrome ore for TL 3.07bn, 55 per cent of revenue, against 94 per cent a year earlier, when gold brought in nothing. Royalty income from mining areas run by contractors added TL 291.9m. Sales abroad made up 79 per cent of revenue, against 66 per cent.</p>
<p>The third quarter carried the year. Revenue for July to September was TL 2.79bn, against TL 969.2m, and the quarter's net profit TL 1.10bn, after a loss of TL 184.8m in the same quarter of 2025, the statements show.</p>
<h2>Sarıalan moves to full capacity</h2>
<p>Trial production began at the Sarıalan gold operation in Balıkesir province on 18 February and the first concentrate was exported on 3 April, the report says. The company moved the plant to full capacity on 24 September, after a trial period in which it produced concentrate containing 14,450 ounces of gold up to 15 September, <a href="https://www.kap.org.tr/en/Bildirim/1667734">it said in a notice</a> that day.</p>
<p>Trafigura has a US$30 million offtake agreement, paid in advance, that gives it the right to buy all of the products from the planned open-pit production at Sarıalan until 2027, the report says. The company is paid separately for deliveries above the advance.</p>
<p>The report puts reserves at the two Sarıalan licences at 674,646 ounces of gold equivalent under UMREK, Türkiye's national reporting code: 538,625 ounces proved and 25,156 ounces probable on the main licence, in a report of May 2024, and 75,435 ounces measured and 35,430 ounces indicated on the adjacent licence bought in 2025, in a report of October 2025.</p>
<h2>Yenipazar is the next build</h2>
<p>The next project is Yenipazar, a polymetallic deposit in Yozgat province held by Aldridge Mineral Madencilik, which CVK controls through its 70 per cent of Virtus Mining. Aldridge signed a US$192 million loan with Türkiye Vakıflar Bankası on 29 January, for nine years with no principal repayment in the first three, <a href="https://www.kap.org.tr/en/Bildirim/1549155">the company said</a> the next day. The project is expected to cost US$240 million in all, so the loan covers 80 per cent and Virtus is to provide the rest as equity.</p>
<p>A 2024 report under the UMREK code puts Yenipazar's indicated and inferred resources at 1,211,084 ounces of gold, 40,017,230 ounces of silver, 123,156 tonnes of copper, 401,833 tonnes of lead and 585,694 tonnes of zinc, or 3,465,066 ounces of gold equivalent. The drilling behind it covered about a tenth of the 9,239 hectare licence, the company says. Since the loan, it has signed contracts for engineering, procurement of the main machinery and the site's buildings, and made most of the land payments for the site, the interim report says. Group long-term borrowings rose to TL 2.26bn at the end of September from TL 721.4m at the end of 2025, the balance sheet shows; the statements do not say how much of that is the Yenipazar loan.</p>
<p>A third project, TV Tower in Çanakkale province, has so far been explored and drilled, though its four licences carry operation permits; it has resources of 2.23 million ounces of gold, 36.3 million ounces of silver and 764.94 million pounds of copper, 4.58 million ounces of gold equivalent, in a 2024 report; plans for a plant will be considered later, the company says.</p>
<p>CVK is also preparing to list part of its chrome business. It filed a draft prospectus with the Capital Markets Board on 12 October for a public offering of part of Hayri Ögelman Madencilik, the subsidiary that runs its chrome mines and in which it owns 96.206 per cent, <a href="https://www.kap.org.tr/en/Bildirim/1679896">it said</a> on 13 October. Türkiye's chrome ore exports rose 65 per cent to US$386.5 million in the first nine months of the year, a company calculation from Istanbul Mineral Exporters' Association data shows.</p>
<p>Gold producers in Türkiye pay a state royalty that rises with the metal price, and on the table in the Mining Law it stood at 22 per cent for gold at September's prices (<a href="https://corridorminerals.com/news/turkiye-mining-royalty-sliding-scale-2026-gold-copper-rates">see the Corridor Minerals explainer</a>). Among the country's larger metals groups, Erdemir approved its own nine-month results the week before, <a href="https://corridorminerals.com/news/erdemir-nine-month-2026-net-profit-tl-11-1bn-third-quarter-flat-steel-sales">as Corridor Minerals reported</a>.</p><p><a href="https://corridorminerals.com/news/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s 500 MW Forish solar plant generated 897m kWh this year</title><link>https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The ministry gives 897 million kWh against 1.1 billion kWh of yearly capability, 81.5 per cent by Data Desk arithmetic, a load factor near 25 per cent.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026.jpg?v=32ab33eb" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek solar, Forish solar plant tests Uzbek load factor</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026.jpg?v=32ab33eb" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026.jpg?v=32ab33eb" length="115180" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's energy ministry said the 500 MW Forish solar plant in Jizzakh region has generated 897 million kWh since the start of this year, in a <a href="https://t.me/minenergy_uz/21487">Telegram post on 24 October</a>.</p>
<p>The same post says the plant can produce 1.1 billion kWh a year.</p>
<p>The post gives no end date for the 897 million kWh beyond "since the beginning of the current year". The figure is therefore not a full-year result. It also says the output saved 239.2 million cubic metres of natural gas and avoided 515.8 thousand tonnes of emissions, and equals the average electricity use of 448.5 thousand households over 10 months.</p>
<p>The two figures in the post can be set against each other. Output of 897 million kWh is 81.5 per cent of the 1.1 billion kWh annual capability. If the period runs to the day of the post, 24 October, it covers 297 days of the year, or about 81.4 per cent of the 365. That is the Data Desk's arithmetic, not a ministry figure, and it assumes the period ended on the post date.</p>
<p>On that assumption, the Data Desk calculates a capacity factor, the share of the plant's maximum possible output that it actually delivered, of about 25.2 per cent. The calculation divides 897 million kWh by 500 MW running for 7,128 hours (297 days). The design figure gives almost the same answer: 1.1 billion kWh over the 4,380 million kWh a 500 MW plant would produce in 8,760 hours is about 25.1 per cent. As yield, that is about 1,794 kWh per installed kilowatt against a design level of 2,200.</p>
<p>The design figure is not new. Trend reported in April 2024, citing the president's office, that the plant would cost $350 million and <a href="https://www.trend.az/casia/uzbekistan/3886726.html">produce 1.1 billion kWh of green energy a year</a>, with the first 200 MW due on the grid later that year. A June 2025 article on the Chinese state asset regulator's website describes a <a href="http://en.sasac.gov.cn/2025/06/23/c_19477.htm">CHD Jizzakh 500 MW solar project</a> that would supply over 1.1 billion kWh a year once operational. The sources differ on the developer: Trend names China Poly Group and China Electric, while the regulator's article refers to CHD, and the ministry post names none.</p>
<p>Three limits apply to the test. The post does not say when the whole 500 MW entered service, so any capacity connected part-way through the period would make the calculated factor look lower than the plant's true performance. It does not say whether 500 MW is the alternating-current or the panel rating, which changes the denominator. And the straight-line comparison ignores seasonality: the months the figure leaves out fall in the colder part of the year, when solar output is typically lower, so a full-year total would not simply continue at the same daily rate.</p>
<p>Within those limits, output to date sits close to the stated design level for the part of the year elapsed. It is a ministry statement, not a metered series, and the post gives no monthly data. For other recent Uzbek power projects, see Corridor Minerals' reports on the <a href="https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction">300 MW wind plant in Karakalpakstan</a> and the <a href="https://corridorminerals.com/news/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan">battery storage project in Bukhara</a>.</p><p><a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Glencore says Kazzinc&#x27;s own gold output fell 42 per cent on lower grades</title><link>https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Kazzinc&#x27;s own sourced gold was 237,000 ounces in nine months as grades fell at its ATK mine; third-quarter output was 88,000 ounces against 89,000.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026.jpg?v=f3bf16c8" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan gold, Kazzinc&#x27;s own gold output falls 42 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026.jpg?v=f3bf16c8" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026.jpg?v=f3bf16c8" length="110525" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazzinc, Glencore's Kazakh zinc and gold producer, produced 237,000 ounces of gold from its own sources in the first nine months of 2026, 42 per cent less than a year earlier, as head grades fell at the Altyntau-Kokshetau mine, <a href="https://www.glencore.com/.rest/api/v1/documents/static/7ed50c65-7d84-4cc1-a2c4-216060583297/GLEN_2026-Q3_ProductionReport.pdf">Glencore said</a> on 29 October.</p>
<p>The third quarter production report puts the shortfall at 171,000 ounces against January to September 2025 and ties it to lower grades at the mine, known as ATK, "as it transitions into its next development phase". The refurbishment of the ATK processing mill that Glencore reported earlier in the year has been completed, with normal operations resumed, the report says.</p>
<p>Glencore controls almost 70 per cent of Kazzinc, and most of the rest belongs to the state mining holding Tau-Ken Samruk, <a href="https://inbusiness.kz/ru/news/syrevoj-gigant-kazahstana-perezhil-obval-proizvodstva-zolota">the Kazakh business site Inbusiness.kz reported</a> in July. The 237,000 ounces are the whole of the gold that Glencore's zinc business reports from its own sources.</p>
<h2>The third quarter steadied</h2>
<p>The quarterly table shows where the drop happened. Kazzinc's own gold output was 127,000 ounces in the third quarter of 2025 and 135,000 ounces in the fourth. It fell to 60,000 ounces in the first quarter of 2026, recovered to 89,000 ounces in the second and was 88,000 ounces in the third, which Glencore's table shows as 1 per cent below the second quarter.</p>
<p><a href="https://www.glencore.com/.rest/api/v1/documents/static/e44bf57f-8768-4b27-8a33-39087d02d00a/GLEN_2026-H1ProductionReport.pdf">The half-year production report</a> of 29 July gave two reasons for a 47 per cent fall to 149,000 ounces in the first six months: lower head grades at ATK and the refurbishment of one of its two processing mills during the period. With the mill back in service, grade is the only reason the third quarter report gives, and third-quarter output was still about 31 per cent below the 127,000 ounces of the same quarter of 2025, a Newsdesk calculation from the table.</p>
<p>The report gives no gold forecast for Kazzinc and does not say when the next development phase at ATK is expected to lift grades.</p>
<h2>Smelters short of outside concentrate</h2>
<p>Kazzinc's smelters also treat material bought from other miners, and that side of the business shrank too. Including third-party feed, Kazzinc's smelters produced 469,000 ounces of gold in the nine months, 35 per cent less than the 720,000 ounces of a year earlier. Zinc metal fell 12 per cent to 162,600 tonnes and copper metal 7 per cent to 35,200 tonnes, while lead metal rose 6 per cent to 60,600 tonnes.</p>
<p>Unlike the mine output, total smelter gold fell between the second and third quarters. It was 124,000 ounces in the first quarter, 187,000 ounces in the second and 158,000 ounces in the third, 16 per cent below the second quarter, the table shows. Total smelter silver fell 19 per cent to 5.98 million ounces in the nine months.</p>
<p>Glencore puts the zinc and lead shortfall down to the supply of outside material rather than to its mines. Own sourced zinc production of 142,400 tonnes was 5 per cent lower than a year earlier, and own sourced lead production of 23,200 tonnes 19 per cent lower, "primarily due to limited availability of high-quality third-party concentrates for blending, which reduced the rate at which the smelters could process own sourced material", the report says.</p>
<p>The mix inside the zinc figure moved as a result. Zinc metal from Kazzinc's own sources fell 24 per cent to 68,900 tonnes, while zinc sold in concentrate rose 23 per cent to 73,500 tonnes, so more of the company's own ore left as concentrate instead of being refined. Own sourced silver metal, excluding silver in concentrate, fell 5 per cent to 2.35 million ounces, and own sourced copper metal 4 per cent to 10,700 tonnes.</p>
<h2>What it means for Kazakh gold supply</h2>
<p>Kazzinc's lower output arrives in a year when the National Bank of Kazakhstan, which has the right to buy all gold produced in the country, bought close to 36 tonnes in the first eight months and then said it would cut gold's share of reserves, as <a href="https://corridorminerals.com/news/kazakhstan-central-bank-gold-sales-reserve-share-target">Corridor Minerals reported</a> on 23 October. On the resource side, the government counts 157.2 tonnes of gold added to resources and reserves in 2024 and 2025, <a href="https://corridorminerals.com/news/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions">a figure that names no deposits</a> or mine lives.</p>
<p>At group level, Glencore kept its full-year 2026 production guidance for its key commodities and said it expects zinc towards the upper end of its range. The report does not break that guidance down by asset.</p><p><a href="https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Türkiye&#x27;s renewables reach 63.1 per cent of installed power capacity</title><link>https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Installed capacity reached 127,355 MW at the end of September; solar, at 28,222 MW, is now larger than gas, energy ministry figures show.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026.jpg?v=3944a146" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Türkiye power, Renewables reach 63.1 per cent of Turkish capacity</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026.jpg?v=3944a146" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026.jpg?v=3944a146" length="123339" type="image/jpeg"/><content:encoded><![CDATA[<p>Renewable plants made up 80,315 MW, or 63.1 per cent, of Türkiye's 127,355 MW of installed power capacity at the end of September, <a href="https://enerji.gov.tr/haber-detay?id=31953">the Ministry of Energy and Natural Resources said</a> on 25 October, up from 62.9 per cent a month earlier.</p>
<p>Hydropower remains the largest single source at 32,332 MW, or 25.4 per cent of the total. Solar follows with 28,222 MW, or 22.2 per cent, ahead of natural gas at 25,009 MW, or 19.6 per cent. Wind has 15,540 MW, domestic coal 11,565 MW, imported coal 10,466 MW, biomass 2,423 MW and geothermal 1,798 MW, the ministry's table shows. Solar and wind together reached 43,762 MW, 34.4 per cent of capacity.</p>
<p>Coal plants held 17.3 per cent between them, 9.1 per cent for domestic coal and 8.2 per cent for imported coal, a Data Desk sum of the ministry's shares. Biomass and geothermal plants together came to 4,221 MW, or 3.3 per cent.</p>
<h2>One month of additions</h2>
<p>The August figures, published by the ministry on 26 September and <a href="https://www.foreks.com/haber/detay/6ab7a68c24008d7d437379cc/AA/tr/turkiye-nin-elektrik-kurulu-gucunde-yenilenebilirin-payi-artiyor-26-09-26/">reported by Anadolu Agency</a>, put total capacity at 126,944 MW and renewable capacity at 79,902 MW, with 27,914 MW of solar and 15,434 MW of wind. On those numbers, Türkiye added 411 MW of capacity in September, of which 308 MW was solar and 106 MW wind, and the headline renewable figure grew by 413 MW, a Data Desk calculation.</p>
<p>Renewables grew slightly more than the total. Gas capacity edged down, to 25,009 MW from 25,012 MW in the August table, while both coal lines were unchanged. Both months put the share of domestic sources in installed capacity at 72.1 per cent. The <a href="https://www.cnbce.com/haberler/turkiyenin-elektrik-kurulu-gucunde-yeni-esik-yenilenebilirin-payi-yuzde-629-oldu-h38097">August release</a> already gave solar a 22 per cent share of capacity.</p>
<h2>Capacity is not output</h2>
<p>The share of renewables in what the plants generate is lower than their share of capacity. Türkiye generated 31.79 billion kWh in September, and renewable sources supplied 18.10 billion kWh, or 56.9 per cent, the ministry said. Hydropower supplied 8.27 billion kWh, about 26 per cent, solar 4.32 billion kWh, or 13.6 per cent, and wind 3.84 billion kWh, or 12.1 per cent. Domestic sources, which include domestic coal as well as renewables, produced 22.35 billion kWh, 70.3 per cent of the month's output.</p>
<p>Solar therefore made up 22.2 per cent of capacity but 13.6 per cent of September generation, a gap that reflects the lower load factor of solar plants, which generate only in daylight. The ministry publishes these figures monthly, so the September share is a single month and not an annual average.</p>
<h2>Why metal makers watch the grid</h2>
<p>Türkiye is one of the corridor's largest buyers of metal and a large steel producer in its own right. Its crude steel output rose 6.1 per cent in the first nine months of the year, as <a href="https://corridorminerals.com/news/turkiye-steel-output-nine-months-2026-cis-kazakhstan-worldsteel">Corridor Minerals reported</a> from World Steel Association data, and Turkish buyers took 59 per cent of Kazakhstan's refined copper exports by value in the first eight months, <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">customs tables show</a>. The power those plants and cable makers buy now comes from a grid in which renewable plants hold close to two thirds of capacity and supplied a little over half of September's electricity.</p>
<p>Energy Minister Alparslan Bayraktar said Türkiye had brought its dependence on imported sources in power generation below 30 per cent in September and would keep expanding capacity.</p>
<p>Capacity and generation figures are the ministry's, as published on 25 October for the end of September and on 26 September for the end of August. Month-on-month changes are Data Desk subtractions from the published numbers. The ministry's renewable total is the sum of hydropower, solar, wind, biomass and geothermal capacity.</p><p><a href="https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s mining share of fixed investment falls to 5.8 per cent</title><link>https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Mining drew UZS 33.9 trillion in nine months, against 9.5 per cent of the total a year earlier; electricity and gas fell to 6.7 per cent from 12.9.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026.jpg?v=4520ec37" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan investment, Mining&#x27;s share of Uzbek investment falls to 5.8 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026.jpg?v=4520ec37" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026.jpg?v=4520ec37" length="126637" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's mining industry absorbed UZS 33.9 trillion of fixed capital investment in January to September 2026, 5.8 per cent of the national total against 9.5 per cent a year earlier, <a href="https://stat.uz/img/news/invest--english_p51718.pdf">the National Statistics Committee said</a> on 29 October.</p>
<p>Total fixed investment reached UZS 584.2 trillion, 20.1 per cent more than in the same period of 2025, the release says. Electricity, gas, steam and air conditioning took UZS 39.0 trillion, or 6.7 per cent of the total against 12.9 per cent a year earlier. Manufacturing remained the largest recipient with UZS 160.8 trillion, and its share rose to 27.5 per cent from 25.5 per cent.</p>
<p>The shares of construction, agriculture and the release's line for other types of activities rose. Construction took 8.8 per cent against 7.0 per cent and agriculture, forestry and fisheries 8.9 per cent against 7.0 per cent, while transport and storage held at 4.7 per cent.</p>
<p>Foreign investment and loans used for fixed assets came to US$33.9bn, or UZS 408 trillion, in the nine months, the release says, about 70 per cent of all fixed investment on the Data Desk's division.</p>
<h2>The third quarter alone</h2>
<p>The mining share was already lower in the first half and fell further in the third quarter. The committee's first-half statement, <a href="https://www.trend.az/casia/uzbekistan/4215522.html">reported by Trend</a> in August, put total fixed investment at UZS 338.9 trillion, with UZS 21.8 trillion in mining and quarrying and UZS 29.9 trillion in electricity, gas, steam and air conditioning supply. That gives mining 6.4 per cent and power 8.8 per cent of first-half investment, on the Data Desk's division.</p>
<p>Subtracting the half-year from the nine-month figures leaves an implied UZS 245.3 trillion of investment in July to September, of which about UZS 12.1 trillion, or 4.9 per cent, went to mining and about UZS 9.1 trillion, or 3.7 per cent, to power. These are Data Desk calculations from rounded published values, and the committee does not publish quarterly figures in this release.</p>
<p>A falling share does not by itself mean less money. The release gives 2025 shares but not 2025 values by activity, and its growth rate for the total is not split by activity, so the Data Desk does not derive whether mining investment rose or fell in soums.</p>
<h2>Output keeps rising</h2>
<p>Output has kept rising while investment shares fell. <a href="https://stat.uz/img/news/press-reliz-sanoat-09-2026-en_p11189.pdf">The committee's industry release</a> for the same nine months puts mining and quarrying output at UZS 70.3 trillion, 6.5 per cent of UZS 1,085.7 trillion of industrial production, which grew 8.1 per cent; manufacturing made up UZS 943.2 trillion, or 86.9 per cent. Electricity generation rose 7.3 per cent to 67,159.5 million kWh, while heat produced by large enterprises fell 19.3 per cent.</p>
<p>That power figure has a shift inside it. Large enterprises generated 44,402.6 million kWh, slightly less than the 45,100.5 million kWh of a year earlier, while small business entities whose main activity is electricity production generated 22,756.9 million kWh against 17,464.7 million kWh, on the committee's survey data. Large enterprises' share of generation fell to about 66 per cent from about 72 per cent, on the Data Desk's division. On those figures, the small producers account for all of the growth in generation, and more.</p>
<p>Spending at project level continues. Navoi Mining and Metallurgical Company is building <a href="https://corridorminerals.com/news/nmmc-muruntau-conveyor-lines-investor-call-strategy-2035">7.7 km of new conveyor lines</a>, and the government has set up <a href="https://corridorminerals.com/news/uzbekistan-copper-purchase-finance-uzsanoatexport-cathode-300000-tonnes">purchase finance for cable makers</a> as copper cathode supply grows.</p>
<p>Values and shares are the committee's, from its releases on fixed investment of 29 October and on industrial production for January to September 2026, and its first-half figures as reported by Trend. First-half shares and the implied third-quarter values are Data Desk calculations.</p><p><a href="https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
</channel>
</rss>
