The Middle Corridor, or Trans-Caspian International Transport Route (TITR), runs from China by rail across Kazakhstan, over the Caspian Sea to Azerbaijan, then through Georgia by rail to Türkiye or across the Black Sea to Europe.

As of . Source: The Middle Trade and Transport Corridor: Policies and Investments to Triple Freight Volumes and Halve Travel Time by 2030, World Bank.

In January to August 2026 transit traffic on the route reached 44,200 TEU, including 419 container trains from China, with container volume up 58 per cent on a year earlier, according to the Kazakh railway KTZ.

As of . Source: Global transit: key outcomes of the TITR meeting in Bulgaria, Kazakhstan Temir Zholy (KTZ).

Key facts

Each value links to the document it comes from; As of is that document's date, or the day it was read when it has none.

FactValueAs of
RouteChina (Dostyk or Khorgos/Altynkol) by rail across Kazakhstan to Aktau, across the Caspian Sea to the Port of Baku (Alat), by rail through Azerbaijan and Georgia, then by rail through Türkiye or across the Black Sea; the Georgian ports on the route are Poti and Batumi
Core countriesKazakhstan, Azerbaijan and Georgia
Latest volume (Jan to Aug 2026, KTZ)44,200 TEU of transit traffic, including 419 container trains from China; container volume up 58 per cent and trains up 84 per cent (28,000 TEU and 228 trains in January to August 2025)
Latest transit through Azerbaijan (Jan to Sep 2026)More than 12 million tonnes of transit freight, up 14.5 per cent and the highest in five years; transit in the East-West direction up 20.2 per cent
2025 volume, KTZ42,000 TEU of transit traffic on 356 container trains, up 15 per cent on 36,200 TEU in 2024
2025 volume, Kazakhstan Ministry of Transport4.12 million tonnes; about 77,000 TEU
2024 volume, TITR Association3.3 million tonnes through the seaports of Kazakhstan and Azerbaijan (up 20 per cent); 56,500 TEU (up 176 per cent)
Container traffic, Kazakh seaports 202590,637 TEU, up 29 per cent
Port of Baku 2025More than 8.2 million tonnes of cargo and 107,000 TEU (whole port, all routes)
Port of Baku capacity15 million tonnes a year; container capacity raised from 100,000 to 160,000 TEU a year; planned expansion to 25 million tonnes and 500,000 TEU
Aktau and Kuryk port capacityAbout 22 million tonnes a year combined; Aktau up to about 12 million tonnes
Baku-Tbilisi-Kars railwayAbout 850 km; opened 30 October 2017; capacity raised from 1 million to 5 million tonnes a year after the 2024 upgrade in Georgia
Transit time, World Bank baseline50 to 53 days on average in 2022 from Dostyk or Khorgos to Constanța
World Bank 2030 projectionTraffic via the Middle Corridor and the Caspian Sea could exceed 11 million tonnes by 2030 (11,385 thousand tonnes, from 3,688 thousand in 2021), but only if infrastructure projects are carried out
World Bank 2040 outlookInvestment could more than triple trade volumes by 2040; more than USD 25 billion of physical infrastructure investment needed through 2040
EU Global Gateway commitmentEUR 10 billion for sustainable transport connectivity in Central Asia, announced at the Investors Forum for EU-Central Asia Transport Connectivity

Middle Corridor timeline

DateEventValue
Azerbaijan reports transit for January to September 2026 at a five-year highMore than 12 million tonnes, up 14.5 per cent
Azerbaijan and Kazakhstan sign an agreement on cooperation in developing the Middle Corridor
Kazakhstan's president says the Moiynty-Kyzylzhar and Darbaza-Maktaaral lines are nearing completion and Bakhty-Ayagoz opens next year
World Bank publishes Integration: World-Class Trade Logistics Along the Trans-Caspian Transport CorridorMore than USD 25 billion of infrastructure needed through 2040
TITR Working Group meets in Sofia; KTZ reports transit traffic for January to August 202644,200 TEU, container volume up 58 per cent
KTZ reports TITR transit traffic for January to July 202636,000 TEU, up 50 per cent
Azerbaijan reports transit for January to July 2026 at the highest level in five yearsMore than 9.1 million tonnes, up 11.6 per cent
Kazakhstan and Uzbekistan prime ministers discuss Middle Corridor volumes; Aktau hub stage one in operation140,000 TEU a year
Georgia moves Anaklia deep sea port to a landlord port model
World Bank backs Georgia's TC-GATE transport projectUSD 372 million
TITR Association General Meeting in Astana reviews 2025 and signs an agreement on container services between Caspian ports and terminals
KTZ reports 2025 TITR transit traffic42,000 TEU, up 15 per cent
Kazakhstan Ministry of Transport publishes 2025 route volume4.12 million tonnes; about 77,000 TEU
Kazakhstan government reports 2025 results: Dostyk-Moiynty second line launched, Aktau container hub completedSeaport containers 90,637 TEU
TITR Working Group in Ankara approves 2026 tariff rates
EU Trans-Caspian Transport Corridor Investors Forum in Tashkent includes Aktau Port ModernisationEUR 10.4 million EU within EUR 35 million EBRD loan
Baku Shipyard and AD Ports Group sign a contract for two Caspian container ships780 TEU each
Groundbreaking for the Kars-Iğdır-Aralık-Dilucu railway towards Nakhchivan, on the date set by Türkiye's transport ministry224 km; 15 million tonnes a year
Aktau container hub launched
TITR Association General Meeting in Baku reports 2024 volumes3.3 million tonnes; 56,500 TEU
Georgia signs Anaklia port marine works agreement with Jan De Nul
First freight train runs on the upgraded Baku-Tbilisi-Kars lineCapacity 5 million tonnes a year
EU commitment announced at the Investors Forum for EU-Central Asia Transport ConnectivityEUR 10 billion
World Bank publishes its Middle Trade and Transport Corridor reportTriple freight volumes and halve travel time by 2030
TITR Association General Meeting in Aktau25 companies from 11 countries
Regular Aktau-Baku-Aktau feeder container service launched
Baku-Tbilisi-Kars railway officially opens
TITR Association begins work
Coordination Committee members decide to set up the TITR Association
Coordination Committee for the Trans-Caspian route set up
KTZ, ADY and Georgian Railway agree in Astana to set up a coordination committee

The route

ItemValueAs of
China to KazakhstanRail border crossings at Dostyk and Khorgos (Altynkol)
Across KazakhstanRail across Kazakhstan to the Caspian; KTZ Express lists Dostyk, Khorgos and Aktau as hubs and a ferry crossing from Kuryk to Alat
Caspian Sea crossingFeeder container ships between Aktau and Baku, whose new port is at Alat (Alyat); a regular Aktau-Baku-Aktau feeder service started in 2019
Azerbaijan to GeorgiaRail via Boyuk-Kasik and Gardabani
Georgia to the Black SeaPorts of Poti and Batumi
Georgia to TürkiyeBaku-Tbilisi-Kars railway, about 850 km in all, more than 500 km of it in Azerbaijan
Onward to EuropeBy rail through Türkiye, or across the Black Sea; the World Bank's transit time benchmark ends at Constanța
TITR AssociationCoordination committee of the Kazakh, Azerbaijani and Georgian railways agreed on 7 November 2013 and set up in February 2014; association decided in December 2016 and working since February 2017
TITR membership26 companies from 11 countries

Volumes by year

ItemValueAs of
2026, Jan to Sep (Azerbaijan)Transit through Azerbaijan more than 12 million tonnes, up 14.5 per cent; East-West direction up 20.2 per cent. Port container handling up 29 per cent to 100,000 TEU and dry cargo up 71 per cent to 1.73 million tonnes (the release does not name the port)
2026, Jan to Aug (KTZ)44,200 TEU of transit traffic, including 419 container trains from China; container volume up 58 per cent on 28,000 TEU, trains up 84 per cent on 228
2026, Jan to Jul (KTZ)36,000 TEU of transit traffic on 350 container trains, up 50 per cent on 24,000 TEU in Jan to Jul 2025
2026, Jan to Jul (Azerbaijan)Transit through Azerbaijan more than 9.1 million tonnes, up 11.6 per cent; East-West corridor transit up 16.5 per cent; Port of Alat containers 72,370 TEU, up 20 per cent
2025 (KTZ)42,000 TEU of transit traffic on 356 container trains, up 15 per cent on 36,200 TEU in 2024
2025 (Kazakhstan Ministry of Transport)4.12 million tonnes; about 77,000 TEU. Below the ministry's own 2024 figure of 4.48 million tonnes
2025 (Government of Kazakhstan)Growth along the TITR of 36 per cent (measure not stated); Kazakh seaports handled 90,637 TEU, up 29 per cent, and 8 million tonnes by sea, up 7 per cent
2025 (Port of Baku)More than 8.2 million tonnes of cargo and 107,000 TEU (whole port, all routes)
2025, Jan to Apr (Kazakhstan Ministry of Transport)1.5 million tonnes, up 10 per cent; 30,400 TEU, three times the 10,200 TEU of a year earlier
2024 (TITR Association)3.3 million tonnes through the seaports of Kazakhstan and Azerbaijan, up 20 per cent; 56,500 TEU, up 176 per cent
2024 (Kazakhstan Ministry of Transport)4.5 million tonnes, up 62 per cent on 2.8 million tonnes in 2023. Higher than the TITR Association figure for the same year
2024 (Port of Baku)7.6 million tonnes of cargo (whole port); container traffic up 73 per cent
2023 (Kazakhstan Ministry of Transport)2.76 million tonnes
2023 (Government of Kazakhstan, period not stated)2.5 million tonnes, double the previous year
2022 (World Bank)Tonnage up 10 per cent on 2021; container traffic up 33 per cent
2021 (World Bank)3.688 million tonnes via the Middle Corridor and the Caspian Sea, of which 1.106 million tonnes oil and oil products
2021 (TITR Association)25,200 TEU
2020 (Kazakhstan Ministry of Transport)0.8 million tonnes
2017 (TITR Association)8,900 TEU

Where the sources disagree

Each row is one source's figure, linked to the document it comes from; As of is that document's date. The sources count different things (tonnes through seaports, tonnes on the route, shipments from China to Europe, rail transit containers, containers through seaports) and time the journey between different points, so their figures should not be mixed in one chart.

ItemValueAs of
2024 tonnage: TITR Association3.3 million tonnes through the seaports of Kazakhstan and Azerbaijan, up 20 per cent
2024 tonnage: Kazakhstan Ministry of Transport, June 20254.5 million tonnes on the route, up 62 per cent on 2.8 million tonnes in 2023
2024 tonnage: Kazakhstan Ministry of Transport, March 20264.48 million tonnes on the route
2024 tonnage: Prime Minister of Kazakhstan4.5 million tonnes, up 62 per cent, described as shipments from China to Europe
2025 direction: Kazakhstan Ministry of TransportDown: 4.12 million tonnes in 2025, against 4.48 million tonnes in 2024
2025 direction: Government of KazakhstanUp 36 per cent along the route; the measure is not named
2025 direction: KTZTransit containers up 15 per cent: 42,000 TEU, against 36,200 TEU in 2024
2025 container count: KTZ42,000 TEU of transit traffic on the route, on 356 container trains
2025 container count: Kazakhstan Ministry of TransportAbout 77,000 TEU on the route
2025 container count: Government of Kazakhstan90,637 TEU through Kazakh seaports, up 29 per cent
2024 container growth: TITR Association release56,500 TEU, up 176 per cent on 2023
2024 container growth: TITR Association secretary general56,500 TEU, nearly two and a half times the 2023 figure
Base year for 0.8 million tonnes: Ministry of Transport, June 20250.8 million tonnes in 2020
Base year for 0.8 million tonnes: Ministry of Transport, March 2026Fivefold growth over the past seven years, from 0.8 million to 4.5 million tonnes a year; the base year is not named
Port of Baku container capacity: Azerbaijan's ministry, August 2026Port of Alat container capacity raised from 100,000 to 150,000 TEU
Port of Baku container capacity: Azerbaijan's ministry, October 2026Annual container capacity raised from 100,000 to 160,000 TEU
Transit time: World Bank50 to 53 days on average in 2022, from Dostyk or Khorgos to Constanța
Transit time: Kazakhstan Ministry of TransportCut from 28 to 32 days to 13 to 17 days; start and end points not named
Transit time: ADY Freight10 to 12 days from China to Europe on average
Transit time: Azerbaijan's ministry12 days on average from China to Europe, against 38 to 53 days several years ago

Transport and logistics projects

ItemValueAs of
Dostyk-Moiynty second line (Kazakhstan)836 km; launched in 2025
Kyzylzhar-Moiynty new line (Kazakhstan)323 km; construction started in 2025
Moiynty-Kyzylzhar, Darbaza-Maktaaral and Bakhty-Ayagoz linesFirst two nearing completion; rail service on Bakhty-Ayagoz due to open in 2027
Aktau container hubStage one, 140,000 TEU a year, in operation; stage two, planned for 2027 to 2028, raises it to 240,000 TEU
Aktau container hub partnersJoint venture of KTZ Express, Aktau Sea Trade Port and Lianyungang Port Group
Caspian fleet (Kazakhstan)Six container ships ordered, four for delivery in 2027 and two in 2028
Caspian fleet additions in 2025 (Kazakhstan)Two ferries acquired; one dry cargo vessel put into service on the Kuryk-Baku line
Caspian fleet (Azerbaijan)Four cargo vessels under construction at Baku Shipyard; contract signed with AD Ports Group on 16 September 2025 for two container ships of 780 TEU each
Aktau and Kuryk dredgingKuryk completed in 2025; Aktau due by the end of 2026
Aktau Port Modernisation (EU and EBRD)EU contribution of EUR 10.4 million within a EUR 35 million EBRD loan, to expand berths, add energy-efficient cranes and raise container-handling capacity
Port of Baku expansionCargo capacity to rise from 15 million to 25 million tonnes a year and container capacity to 500,000 TEU; container capacity already raised from 100,000 to 160,000 TEU
Baku-Tbilisi-Kars upgradeGeorgian section modernised in 2024; capacity raised from 1 million to 5 million tonnes a year; first freight train on the upgraded line 20 May 2024
Kars-Iğdır-Aralık-Dilucu railway (Türkiye to Nakhchivan)224 km, double track, electrified and signalled; capacity 5.5 million passengers and 15 million tonnes of freight a year; EUR 2.4 billion of external financing; groundbreaking set for 22 August 2025
Anaklia deep sea port (Georgia)First phase 600,000 containers a year at an indicative USD 600 million; first ships expected in 2029 (as stated in 2024)
Anaklia marine works contractAgreement signed with Jan De Nul for construction of the port's marine infrastructure; no contract value given
Anaklia port modelSwitched to a landlord port model in which the state remains owner of the core maritime and port infrastructure; the government plans USD 7 billion of investment in the sector's strategic infrastructure by 2032
Georgia TC-GATE project (World Bank)USD 372 million of World Bank Group financing within a project of over USD 750 million, co-financed by AIIB and ADB: new electric locomotives for Georgian Railway and four-lane road sections in Kakheti
EU Global GatewayEUR 10 billion committed in January 2024; a study led by the Commission and carried out by the EBRD identified 33 hard infrastructure needs and 7 soft connectivity key actions
World Bank investment estimateMore than USD 25 billion in physical infrastructure through 2040, particularly rail networks, maritime ports and feeder roads, plus an estimated USD 30 billion of enabling investment

What to watch

Aktau port dredging is due for completion by the end of 2026, ahead of stage two of the Aktau container hub (to 240,000 TEU) in 2027 to 2028 and delivery of four new container ships in 2027.

As of . Source: Prime Ministers of Kazakhstan and Uzbekistan discuss prospects for increasing transportation along the Middle Corridor, Prime Minister of the Republic of Kazakhstan.

Latest coverage

  1. Baiterek and Guoyou sign memorandum on US$1bn Kuryk port terminal, with financing still to be discussed

  2. Metals make up 6 per cent of Caspian freight on the latest breakdown

  3. Middle Corridor container traffic grows, but published figures do not match

  4. Aktau dredging may cut Kazakh metal freight costs, but only for a few years

  5. World Bank says Middle Corridor could add 3.3 per cent to GDP and 2m jobs

Sources

Assay notes

  1. Trans-Caspian International Transport Route (TITR) Association: General Meeting held in BakuTITR Association, 4 March 2025
  2. TITR Association celebrates its 5th anniversaryTITR Association, 7 February 2022
  3. Working Group and General Meeting held in AktauTITR Association, 29 September 2023
  4. Working Group and General Meeting held in AstanaTITR Association, 24 April 2026
  5. Working Group meeting held in AnkaraTITR Association, 5 December 2025
  6. Meeting of the TITR Development Working Group held in SofiaTITR Association, 15 September 2026
  7. HistoryTITR Association, undated, read 20 October 2026
  8. Complex tariff rates for 2024TITR Association, 28 November 2023
  9. Global transit: key outcomes of the TITR meeting in BulgariaKazakhstan Temir Zholy (KTZ), 15 September 2026
  10. Meeting of the heads of KTZ and GR: transit discussionsKazakhstan Temir Zholy (KTZ), 16 October 2026
  11. KTZ and Azerbaijani partners discuss development of the TITRKazakhstan Temir Zholy (KTZ), 26 August 2026
  12. Development of the TITR discussedKazakhstan Temir Zholy (KTZ), 11 March 2026
  13. Construction of a container hub underway at the Port of AktauKazakhstan Temir Zholy (KTZ), 3 February 2025
  14. TMTM routeKTZ Express, undated, read 20 October 2026
  15. Development of the transport sector and logistics potential of KazakhstanPrime Minister of the Republic of Kazakhstan, 9 February 2026
  16. Prime Ministers of Kazakhstan and Uzbekistan discuss prospects for increasing transportation along the Middle CorridorPrime Minister of the Republic of Kazakhstan, 23 July 2026
  17. Kazakhstan strengthens its position on the transit map of EurasiaPrime Minister of the Republic of Kazakhstan, 15 July 2025
  18. 3 times more cargo can be transported through Kazakhstan seaports than nowPrime Minister of the Republic of Kazakhstan, 12 December 2023
  19. President takes part in the 8th Consultative Meeting of the Heads of State of Central Asia and AzerbaijanPresident of the Republic of Kazakhstan (Akorda), 8 October 2026
  20. Trans-Caspian Transport Route Cargo Volumes Increase Fivefold in Seven YearsThe Astana Times, reporting a Kazakhstan Ministry of Transport release, 10 March 2026
  21. Cargo carried on the TITR up sixfoldKazinform, Russian-language report quoting a Ministry of Transport director at a forum of exporters, 12 June 2025
  22. Interview with the TITR Association secretary general on 2024 resultsKazinform, 7 February 2025
  23. Record annual cargo handling of 7.6 million tonnesPort of Baku, 17 January 2025
  24. Port of Baku presents growth and sustainability efforts in HamburgPort of Baku, 22 February 2025
  25. Strategic development planPort of Baku, undated, read 20 October 2026
  26. Azerbaijan's transit potential strengthens: freight volumes rise to a record levelMinistry of Digital Development and Transport of Azerbaijan, Azerbaijani-language release, 20 October 2026
  27. Record transit freight volumes: highest level in five yearsMinistry of Digital Development and Transport of Azerbaijan, 10 August 2026
  28. Baku-Tbilisi-KarsAzerbaijan Railways (ADY), project page, undated, read 20 October 2026
  29. East-West transport corridorADY Freight, undated, read 20 October 2026
  30. The Middle Trade and Transport Corridor: Policies and Investments to Triple Freight Volumes and Halve Travel Time by 2030World Bank, 27 November 2023
  31. Middle Trade and Transport CorridorWorld Bank, publication page, 27 November 2023
  32. Trans-Caspian Transport Corridor investments could spur growth and create millions of jobsWorld Bank, 28 September 2026
  33. Integration: World-Class Trade Logistics Along the Trans-Caspian Transport CorridorWorld Bank, 28 September 2026
  34. Georgia boosts role in Trans-Caspian Transport Corridor with World Bank Group supportWorld Bank, 2 June 2026
  35. Global Gateway: EU and Central Asian countries agree on building blocks to develop the Trans-Caspian Transport CorridorEuropean Commission, 30 January 2024
  36. Investors Forum for EU-Central Asia Transport ConnectivityEuropean Commission, 29 January 2024
  37. Global Gateway: Trans-Caspian Transport Corridor and Connectivity Investors Forum, key deliverablesEuropean External Action Service, 27 November 2025
  38. Trans-Caspian Transport Corridor and Connectivity Investors Forum in TashkentEuropean Commission, 27 November 2025
  39. Historic step on the Zangezur corridorMinistry of Transport and Infrastructure of Türkiye, Turkish-language release on the Kars-Iğdır-Aralık-Dilucu railway, 20 August 2025
  40. Zangezur corridor to bring in 147.6 billion liraMinistry of Transport and Infrastructure of Türkiye, Turkish-language report of the minister's remarks before the groundbreaking ceremony, 23 August 2025
  41. Anaklia deep sea port to be built on a landlord port modelMinistry of Economy and Sustainable Development of Georgia, 6 July 2026
  42. Jan De Nul selected for Anaklia marine infrastructureMinistry of Economy and Sustainable Development of Georgia, 1 August 2024
  43. Agreement signed with Jan De Nul on Anaklia marine infrastructureMinistry of Economy and Sustainable Development of Georgia, 30 August 2024

Last updated . Updated monthly.