Kounrad's 2025 sustainability data: emissions down 5%, water use up 146%

Central Asia Metals' report shows the Kazakh copper site emits nine-tenths of group CO2 from coal boilers while solar covers 15% of its energy.

Written with AI tools by Corridor Minerals' editorial system; the publisher is responsible for it. How this site works

Dump trucks on dusty haul roads cut into the pale terraced slopes of an open-pit mine
Haul trucks in the Kounrad open-pit mine, 2004 Photo: Yuri Ivankov (Russian Wikipedia), public domain, via Wikimedia Commons, cropped

Kounrad, Central Asia Metals' copper operation in Kazakhstan, produced 48,640 tonnes of carbon dioxide equivalent in Scope 1 and 2 emissions in 2025, 5 per cent less than in 2024 and about nine-tenths of the London-listed group's total, according to the company's 2025 Sustainability Report. The report names the coal boilers at Kounrad as the group's most significant source of Scope 1 emissions.

Scope 1 and 2 emissions, Kounrad and Central Asia Metals group, 2024 and 2025Tonnes of CO2 equivalent
Source: Central Asia Metals plc, Central Asia Metals plc 2025 Sustainability Report, 14 April 2026

Group Scope 1 and 2 emissions fell 2 per cent to 53,770 tonnes, helped by improved coal efficiency at Kounrad and a warmer winter, while emissions intensity rose to 2.42 tonnes per tonne of copper-equivalent product from 2.31 because production was lower, the report says. The group's target is a 50 per cent cut in Scope 1 and 2 emissions by 2030 from a 2020 base; it reports a 45 per cent reduction so far.

Indicator, 2025Kounrad, KazakhstanSasa, North MacedoniaGroup
Scope 1 and 2 GHG emissions, tCO2e48,640 (2024: 51,236)5,13053,770 (2024: 55,059)
Water withdrawal, megalitres8474,3255,172 (2024: 5,517)
Energy from own solar plant or renewable sources15% of energy from the site's solar plant100% of electricity renewable29% of electricity (2024: 28%)
Taxes paid, $ million42.1 (Kazakhstan)14.2 (North Macedonia)56.3
Revenue, $ million129.7 (copper)100.1 (zinc, lead, silver)229.8 (calculated)
Community investment through foundations, $ million0.50.20.8 in total, including a corporate fund
Closure provision, $ million (non-discounted closure cost)9.5 (16.1)27.537.1
Lowest wage against national minimum, per month$655 against $163$877 against $657n/a

Water: a closed circuit, but more of it

Kounrad drew 847 megalitres of water in 2025, mostly from an old mine shaft nearby and from Lake Balkhash, and its consumption rose 146 per cent from 2024, according to the report. The company attributes the rise to leaching mainly fresh ore blocks that had not been irrigated before: dry material needs its moisture content roughly doubled before solution flows out at a steady rate.

The site runs as a closed circuit with no significant water losses to the environment beyond evaporation, solution held in the dumps and sanitary wastewater that is taken off site, and its abstraction equals about 0.01 per cent of total annual withdrawal from Lake Balkhash, the report says. Preparations have begun for a new surface-water abstraction point to allow year-round abstraction from the lake; permitting is under way, with construction expected to be completed early in the second half of 2026, the report says, giving more flexibility as lake levels change with the seasons.

The company's solar power plant at Kounrad met 15 per cent of the operation's energy requirements, while in North Macedonia the Sasa mine has moved to 100 per cent renewable electricity, according to the report. Across the group, electricity was 54 per cent of total energy consumption of 706,698 gigajoules, and 29 per cent of electricity came from renewable sources.

Smaller measures at Kounrad in 2025 included temperature sensors on dripper lines to cut coal use, lighting upgrades saving 75,320 kilowatt-hours a year, an upgraded rectifier cooling-fan control designed to cut energy use at fan start-up by about 50 per cent, and a hybrid inverter with 15 kilowatts of battery storage as backup power for critical equipment, the report says. Winter leach blocks are fitted with dual dripper pipes to keep production going in extreme cold.

What Kazakhstan receives

The group paid $56.3 million in taxes in 2025, of which $42.1 million was paid in Kazakhstan and $14.2 million in North Macedonia, including payroll and other taxes, and Kounrad received a largest-taxpayer award from the State Revenue Department of the Karaganda region for the 2024 financial year, according to the report. Copper revenue from Kazakhstan was $129.7 million.

The average monthly salary at Kounrad was $1,675, and the lowest wage paid was $655 a month against a national minimum of $163. Women made up 19 per cent of Kounrad's employees. The Kounrad Foundation spent $0.5 million on community projects, and the company holds a $9.5 million closure provision for the site, against non-discounted closure costs of $16.1 million inflated to the end of mine life, the report shows. Neither the group nor its subsidiaries has made political donations, it says.

Safety held up. The group's lost-time injury frequency rate was 0.39 in 2025, against a target below 1.13, though its total recordable rate rose to 1.16 from 0.77, and there have been no fatalities at Kounrad or Sasa under the company's ownership, according to the report.

Method

All figures are from Central Asia Metals' 2025 Sustainability Report, published in April 2026 and listed on its sustainability reports page; they are company-reported. Sasa's emissions figure is Scope 1 only, as the report gives no Scope 2 figure for a site on 100 per cent renewable electricity. The group revenue total and Kounrad's share of group emissions are Data Desk calculations from the report's figures. The report did not give Kounrad's 2025 copper output alongside these data, so no site intensity is calculated here.

Sources

Assay notes

  1. Central Asia Metals plc 2025 Sustainability ReportCentral Asia Metals plc, Primary source, 14 April 2026