Editor's noteExplainer
Corridor Minerals reports resources and reserves with their class, code and basis
Kazatomprom's 2025 report shows why the basis matters: its uranium Ore Reserves are 531.0 thousand tonnes at 100%, of which 282.9 thousand are attributable.
Written with AI tools by Corridor Minerals' editorial system; the publisher is responsible for it. How this site works

From 26 October 2026, Corridor Minerals reports a deposit's mineral resources and reserves in the classes the source document uses, names the code or system behind each figure and states whether the figure covers the whole deposit or only the owner's share. The standard binds all our columns.
Our reference is the International Reporting Template of the Committee for Mineral Reserves International Reporting Standards (CRIRSCO), in its June 2024 release. According to the template's foreword, CRIRSCO's members, among them the Australasian Joint Ore Reserves Committee, which produces the JORC Code, and Kazakhstan's KAZRC Association, use definitions identical to, or not materially different from, the template's.
Classification as the document gives it
The template divides Mineral Resources, in order of increasing geological confidence, into Inferred, Indicated and Measured. It divides Mineral Reserves, the economically mineable part of a Measured or Indicated resource, into Probable and Proved. We use these classes only when the document does, and in its own terms: the JORC Code calls them Probable and Proved Ore Reserves.
We never add reserves to resources. The template bars a single combined figure and requires a report that gives both to say whether its resources include the reserves (clauses 8.21 and 8.22); where the document says so, we repeat it.
Official figures may use a national classification instead. The Kazakh government's release of 2 September 2026, citing the Ministry of Industry and Construction, put growth in resources and reserves over 2024 and 2025 at 157,210.6 kilograms of gold and 262,209.4 thousand tonnes of iron ore, without saying how much of each was resources and how much reserves. The same release gives 795.8 thousand tonnes of category C2 reserves for the Irgiz area, without saying whether that is ore or metal. Under this standard we write "resources and reserves" for the first figures, never "reserves" alone, and in the same sentence we give C2 as the release's own category, which is not one of the template's classes. We do not translate national categories into the template's classes.
The code, named
Every resource or reserve figure we print names the code or system it was reported under, such as the JORC Code, Kazakhstan's KAZRC Code, the code of Türkiye's UMREK or a national classification. Where the document names none, we say so in the same sentence.
The code tells a reader which rules stand behind a figure. Compliance with the JORC Code has been mandatory for companies listed in Australia and New Zealand since it entered those exchanges' listing rules in 1989 and 1992 respectively, according to the JORC Committee. The KAZRC Code has been recognised on the Kazakhstan Stock Exchange since 2016, entered the Astana International Exchange's listing rules in 2019 and has been adopted in law since 2018 for reporting resources and reserves to state authorities, according to the KAZRC Association. Türkiye's UMREK has been a CRIRSCO member since 2018, according to CRIRSCO's members page.
Membership can change, which is one more reason to name the code. On 8 September 2026, CRIRSCO's members approved a special resolution at a special general meeting in Istanbul removing the Mongolian Professional Institute of Geosciences and Mining as a member, CRIRSCO announced on 9 September. So for a Mongolian deposit, as for any other, we say which code the statement uses.
Whole deposit or the owner's share
Where a deposit has more than one owner, every figure carries its basis in the same sentence: 100 per cent, meaning the whole deposit, or attributable, meaning the owner's share. The template requires a company to declare its economic interest in a project and, where ownership is shared, to make clear what proportion of the reported resources and reserves it has an interest in (clauses 2.20 and 2.22).
The 2025 integrated annual report of NAC Kazatomprom JSC shows why. Citing statements by SRK Consulting (UK) Limited dated 17 January 2026, it puts the Ore Reserves of its mining assets at 31 December 2025 at 531.0 thousand tonnes of uranium on a 100 per cent basis, of which 282.9 thousand tonnes are attributable to the company. Its Mineral Resources, which include those reserves, are 786.4 thousand tonnes on a 100 per cent basis and 474.4 thousand tonnes attributable. On Lamp Room's arithmetic, the attributable reserves are 53 per cent of the 100 per cent figure, 282.9 divided by 531.0. Adding the reserves to the resources would count the same uranium twice.
Written to this standard, the line reads: "Kazatomprom's Ore Reserves under the JORC Code were 531.0 thousand tonnes of uranium at 31 December 2025 on a 100 per cent basis, of which 282.9 thousand tonnes were attributable to the company, according to its 2025 integrated annual report."
If a figure on Corridor Minerals falls short of this standard, tell us through our contact page; our corrections page sets out how we correct.
Signed: Linda Mile, editor (an avatar, not a person). The publisher is responsible for Corridor Minerals.
Sources
Assay notes
- International Reporting Template for the public reporting of Exploration Targets, Exploration Results, Mineral Resources and Mineral Reserves (June 2024)
- Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code), 2012 Edition
- JORC: Mineral Resources and Ore Reserves (what is the JORC Code)
- KAZRC Association (home page: CRIRSCO membership, KASE and AIX recognition, adoption in law)
- CRIRSCO members
- Change in CRIRSCO Membership: removal of MPIGM (Mongolia)
- Послание Президента: за два года в Казахстане открыто 54 новых месторождения (President's Address: 54 new deposits discovered in two years)
- Kazatomprom 2025 Integrated Annual Report




