<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
<channel>
<title>Corridor Minerals: Mining</title>
<link>https://corridorminerals.com/</link>
<atom:link href="https://corridorminerals.com/category/mining/rss.xml" rel="self" type="application/rss+xml"/>
<description>Producers, output, projects and licences.</description>
<image><url>https://corridorminerals.com/img/brand/wordmark-mark-on-light.png?v=955e6486</url><title>Corridor Minerals: Mining</title><link>https://corridorminerals.com/</link><width>144</width><height>21</height></image>
<language>en-gb</language>
<copyright>Corridor Minerals</copyright>
<ttl>60</ttl>
<lastBuildDate>Thu, 12 Nov 2026 00:00:00 +0000</lastBuildDate>
<item><title>Erdene puts Bayan Khundii&#x27;s all-in sustaining cost at US$1,848 an ounce</title><link>https://corridorminerals.com/news/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results</link><guid isPermaLink="true">https://corridorminerals.com/news/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results</guid><pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate><description>Cash costs were US$1,742 an ounce in the third quarter against a realised price of US$4,313, and Erdene swung to a C$9.6m profit.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results.jpg?v=f69b8e12" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Mongolian gold, Bayan Khundii&#x27;s cost: US$1,848 an ounce</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results.jpg?v=f69b8e12" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results.jpg?v=f69b8e12" length="136677" type="image/jpeg"/><content:encoded><![CDATA[<p>Erdene Resource Development said Bayan Khundii, the Mongolian gold mine in which it holds a 50 per cent economic interest, ran at an all-in sustaining cost of US$1,848 an ounce in the third quarter, in <a href="https://www.globenewswire.com/news-release/2026/11/04/3395934/0/en/erdene-announces-q3-2026-results.html">results</a> published on 4 November.</p>
<p>Cash costs were US$1,742 an ounce, and total cost of sales was US$23m, or US$1,942 an ounce, the company said. The mine's operator, Erdene Mongol, its joint venture with Mongolian Mining Corporation, realised a weighted average price of US$4,313 an ounce on 11,853 ounces produced and sold, so the all-in cost was less than half the price. Erdene's <a href="https://www.globenewswire.com/news-release/2026/10/19/3383273/0/en/erdene-provides-q3-2026-update-and-notice-of-conference-call-and-webcast.html">quarterly update</a> of 19 October had given the price as US$4,315, as <a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">we reported</a>.</p>
<p>The margin turned into profit. Erdene recorded net income of C$9.6m for the three months to 30 September, against a net loss of C$2.7m a year earlier, the results show.</p>
<p>The mine moved 415,000 tonnes of ore at an average grade of 1.25 grams of gold a tonne, and the plant processed 164,000 tonnes, an average of 1,788 tonnes a day. Erdene Mongol had US$19m of cash at the end of the quarter and US$93m of debt outstanding, and the company bought back and cancelled 130,300 shares during the quarter.</p>
<p>Exploration is the next call on that cash. Erdene launched a 16,500 metre drill programme and a deep geophysical survey across its Khundii Minerals District, with 3,000 metres of drilling for the Dark Horse and Altan Arrow area, the company said. Its other Mongolian asset, the Zuun Mod molybdenum and copper project, has a <a href="https://corridorminerals.com/news/erdene-zuun-mod-pea-molybdenum-copper-mongolia">preliminary economic assessment</a> published in October.</p>
<p>Method: costs, the realised price and profit are from Erdene's third quarter results; cost and tonnage figures are for the mine as a whole. The results give no numerical guidance for the fourth quarter.</p><p><a href="https://corridorminerals.com/news/erdene-bayan-khundii-aisc-1848-per-ounce-q3-2026-results">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh coal sales at home fall 3.6 per cent as exports grow</title><link>https://corridorminerals.com/news/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026</guid><pubDate>Wed, 04 Nov 2026 00:00:00 +0000</pubDate><description>Exports took 27.4 per cent of the coal available in eight months, and the price index for coal and coke storage rose 31.1 per cent in a quarter.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026.jpg?v=a7a45acc" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh coal, Less coal sold at home</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026.jpg?v=a7a45acc" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026.jpg?v=a7a45acc" length="114844" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan sold 53.15 million tonnes of coal at home from January to August, 3.6 per cent less than a year earlier, while exports rose 3.2 per cent to 20.10 million tonnes, the national statistics bureau said in a <a href="https://stat.gov.kz/api/iblock/element/413816/file/en/">balance table</a> on 20 October.</p>
<p>Production of hard coal and lignite fell 1.9 per cent to 72.69 million tonnes and imports rose 4.6 per cent to 560,522 tonnes, the table shows. Exports took 27.4 per cent of the coal available, against 26.1 per cent a year earlier on a Corridor Minerals calculation.</p>
<table><thead><tr><th>Hard coal and lignite, thousand tonnes</th><th>January to August 2025</th><th>January to August 2026</th><th>Change</th></tr></thead><tbody><tr><td>Production</td><td>74,100.9</td><td>72,689.4</td><td>-1.9%</td></tr><tr><td>Imports</td><td>535.8</td><td>560.5</td><td>+4.6%</td></tr><tr><td>Exports</td><td>19,473.6</td><td>20,095.4</td><td>+3.2%</td></tr><tr><td>Sales on the domestic market</td><td>55,163.1</td><td>53,154.5</td><td>-3.6%</td></tr></tbody></table>
<p>The mix of output is changing. The bureau's <a href="https://stat.gov.kz/api/iblock/element/413699/file/en/">industry table</a>, published on 16 October, puts coal production, including concentrate, at 82.41 million tonnes for the first nine months, 1.9 per cent less than a year earlier. Within it, high-ash steam coal fell 6.3 per cent to 49.65 million tonnes, while steam coal of higher calorific value rose 8.1 per cent to 15.20 million tonnes and coking coal 7.0 per cent to 6.27 million tonnes.</p>
<p>The bureau also counts what was not shipped. Industrial enterprises held 7.70 million tonnes of coal unshipped at the end of September, after shipping 25.87 million tonnes in the third quarter, the bureau's <a href="https://stat.gov.kz/api/iblock/element/413702/file/en/">shipment and balances table</a> of 28 October shows. The table gives no earlier balance, so the change in stocks cannot be read from it, as with the ferroalloy stocks in <a href="https://corridorminerals.com/news/kazakhstan-ferrochrome-stocks-101654-tonnes-end-september-2026">our report on the same table</a>.</p>
<p>Storing it has become dearer. The bureau's producer price index for coal and coke storage services rose 31.1 per cent in the third quarter from the second and 34.1 per cent from the third quarter of 2025, its <a href="https://stat.gov.kz/api/iblock/element/413892/file/en/">services price table</a> of 27 October shows. Cargo handling services rose 3.5 per cent from the second quarter. The table gives no reason for the rise.</p>
<p>Where the exported coal goes, and at what declared value, is in <a href="https://corridorminerals.com/news/kazakhstan-coal-exports-eu-poland-russia-values-2026">our report on the trade tables</a>. The bureau marks the balance figures as preliminary; shares above are Corridor Minerals calculations from its figures in thousand tonnes.</p><p><a href="https://corridorminerals.com/news/kazakhstan-coal-home-sales-fall-3-6-per-cent-exports-rise-storage-prices-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakh metal ore miners double fixed assets to KZT 7.2 trillion since 2021</title><link>https://corridorminerals.com/news/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025</guid><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate><description>Fixed assets at original value rose 108 per cent in four years, against 34 per cent in metallurgy, as mine asset wear eased to 47.7 per cent.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025.jpg?v=210af530" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh fixed assets, Metal ore mines double their asset base</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025.jpg?v=210af530" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025.jpg?v=210af530" length="111542" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's metal ore mining companies held fixed assets worth KZT 7.15 trillion at original value in 2025, more than double the KZT 3.44 trillion of 2021, the Bureau of National Statistics said in tables <a href="https://stat.gov.kz/api/iblock/element/413909/file/en/">published on 30 October</a>.</p>
<p>The rise over four years is 107.8 per cent, on a Corridor Minerals calculation from the bureau's figures in million tenge, and 18.3 per cent in 2025 alone, from KZT 6.05 trillion in 2024. The tables do not split the rise in original value between new spending and other changes, but they report new assets separately: fixed assets entering metal ore mining reached KZT 888.9bn in 2025, against KZT 642.7bn in 2024. The bureau's renewal coefficient for the subsector, which compares new assets with the total, was 12.4 per cent in 2025, up from 10.6 per cent.</p>
<p>Wear eased slightly. The bureau puts the depreciation degree of metal ore mining assets at 47.7 per cent in 2025, down from 49.7 per cent in 2024 but above the 46.4 per cent of 2021. After depreciation, the carrying value was KZT 3.74 trillion.</p>
<table><thead><tr><th>Year</th><th>Metal ore mining, original value, KZT million</th><th>Metallurgy, original value, KZT million</th><th>Metal ore mining, depreciation degree</th><th>Metallurgy, depreciation degree</th></tr></thead><tbody><tr><td>2021</td><td>3,443,553</td><td>4,179,966</td><td>46.4%</td><td>49.2%</td></tr><tr><td>2022</td><td>5,008,776</td><td>4,036,984</td><td>42.7%</td><td>50.9%</td></tr><tr><td>2023</td><td>5,412,290</td><td>4,572,852</td><td>45.5%</td><td>50.5%</td></tr><tr><td>2024</td><td>6,046,392</td><td>5,166,462</td><td>49.7%</td><td>49.8%</td></tr><tr><td>2025</td><td>7,154,381</td><td>5,595,617</td><td>47.7%</td><td>51.2%</td></tr></tbody></table>
<p>The smelters and mills grew more slowly. Fixed assets in the metallurgy industry rose 33.9 per cent over the four years to KZT 5.60 trillion, on a Corridor Minerals calculation, so metal ore mining has carried the larger asset base since 2022. Metallurgy's depreciation degree was 51.2 per cent in 2025. New assets entering the industry rose to KZT 631.8bn from KZT 456.0bn, while disposals reached KZT 199.9bn, lifting its liquidation coefficient to 4.0 per cent from 1.5 per cent.</p>
<p>Oil and gas still dominate the wider sector. Mining and quarrying as a whole held KZT 67.7 trillion of fixed assets in 2025, of which crude oil and natural gas accounted for KZT 58.9 trillion, leaving metal ores with 10.6 per cent of the total, on a Corridor Minerals calculation. Machinery and equipment made up 59.2 per cent of the sector's fixed assets in 2025, against 44.3 per cent in 2021, the bureau's structure table shows.</p>
<p>The sector that includes the power plants feeding the mines and smelters is more worn on the same measure. Electricity, gas, steam and air conditioning supply as a whole, which also covers distribution, carried a depreciation degree of 67.6 per cent in 2025 and a renewal coefficient of 3.8 per cent, against 47.7 per cent wear in metal ore mining. The government plans 13.3 GW of new capacity through 2029, including 7.4 GW of base generation, a programme Vice Minister of Energy Bakytzhan Ilyasov presented to a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting on 29 October</a> and which is set out in <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">our report</a>.</p>
<p>The annual tables sit alongside the bureau's count of capacity commissioned this year, which recorded new copper ore capacity in <a href="https://corridorminerals.com/news/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026">the first nine months of 2026</a>. Shares and changes above are Corridor Minerals calculations from the bureau's tables, which give values in million tenge; the next edition of the tables is due on 29 October 2027, the bureau says.</p><p><a href="https://corridorminerals.com/news/kazakhstan-metal-ore-mining-fixed-assets-double-kzt-7-trillion-2021-2025">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s natural gas output falls to 27 billion cubic metres</title><link>https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Large producers extracted 16.4 per cent less gas in nine months than a year earlier, while mining and quarrying grew 3.1 per cent in real terms.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026.jpg?v=327c4d95" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek industry, Uzbek gas output drops for a second year</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026.jpg?v=327c4d95" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026.jpg?v=327c4d95" length="114230" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's large industrial enterprises produced 27.0 billion cubic metres of natural gas in January to September, against 32.3 billion a year earlier, the National Statistics Committee said in its <a href="https://stat.uz/img/news/press-reliz-sanoat-09-2026-en_p11189.pdf">nine-month industrial production release</a>.</p>
<p>That is a fall of 16.4 per cent, by Data Desk arithmetic. The committee's table gives 33.7 billion cubic metres for the same months of 2024, so output has now dropped for two years running and is 19.9 per cent below the 2024 level, by the same arithmetic. Gas condensate fell to 729.2 thousand tonnes from 849.2 thousand, oil to 482.2 thousand tonnes from 490.1 thousand, and coal to 5.4 million tonnes from 5.8 million. The committee notes that the 2024 and 2025 product figures were adjusted to the annual balance.</p>
<p>Not every extracted product fell. Portland cement output rose to 16.2 million tonnes from 15.7 million, after 11.9 million in the same months of 2024. Motor gasoline output rose to 913.2 thousand tonnes from 890.1 thousand and diesel to 979.0 thousand tonnes from 876.1 thousand, while oil and condensate output fell.</p>
<p>The hydrocarbon declines sit inside a mining sector that still grew. Mining and quarrying, section B of the classification, produced UZS 70.3trn of output in nine months, 6.5 per cent of all industrial output, and the committee's chart puts its physical volume index at 103.1 per cent, real growth of 3.1 per cent. The committee gave the section's eight-month output as <a href="https://stat.uz/en/press-center/news-of-committee/70704-zbekistonda-to-kon-sanoati-azhmi-arijb-58-trln-s-mga-etdi-4">57.8 trillion soums</a>, so September added about UZS 12.5trn, the Data Desk calculates.</p>
<p>Total industrial output reached UZS 1,085.7trn, up 8.1 per cent in real terms. Navoi region produced UZS 228,966.7bn, more than any other region, with a volume index of 107.4 per cent, and its output per head was UZS 192.4m against a national average of UZS 27.6m. The region's weight in metallurgy is set out in the Data Desk's <a href="https://corridorminerals.com/news/uzbekistan-metallurgy-quarter-of-industrial-output-navoi-january-august-2026">January to August metallurgy figures</a>.</p>
<p>Power generation moved the other way from gas. The release gives 67,159.5 million kWh of electricity generated in nine months, 7.3 per cent more than a year earlier. Large enterprises generated 44,402.6 million kWh against 45,100.5 million, while small businesses whose main activity is power production, generated 22,756.9 million kWh against 17,464.7 million, a rise of 30.3 per cent by Data Desk arithmetic. Heat output from large enterprises fell 19.3 per cent.</p>
<p>Investment has shifted away from both sectors as a share of the total. The committee's <a href="https://stat.uz/img/news/invest--english_p51718.pdf">fixed investment release</a> shows UZS 33,853.2bn invested in the mining industry in nine months, 5.8 per cent of the total against 9.5 per cent a year earlier, and UZS 38,980.7bn in electricity, gas, steam and air conditioning, 6.7 per cent against 12.9 per cent. The Data Desk set out those shares in its <a href="https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026">report on mining and power investment</a>.</p>
<p>The release does not give monthly gas output or name the producing fields, and it covers large enterprises only, so it does not show whether smaller producers made up any of the gap.</p><p><a href="https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhmys says it has repaired 346 units of mining equipment this year</title><link>https://corridorminerals.com/news/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The KZT 6.7bn programme has put KZT 5.8bn into repair work so far, with 277 of the machines repaired at the Zhezkazgan mines.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme.jpg?v=000fce8c" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh copper, Kazakhmys repairs 346 mining machines</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme.jpg?v=000fce8c" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme.jpg?v=000fce8c" length="112442" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhmys said it has repaired 346 units of mining equipment at its mines this year under a KZT 6.7bn programme, of which KZT 5.8bn has already gone to repair work, in a <a href="https://t.me/kazakhmys_news/5620">post on its news channel on 28 October</a>.</p>
<p>Most of the work was in the Zhezkazgan region, where 277 machines were repaired. A further 38 were repaired in the Balkhash region and 31 in the Karaganda region. The company said it has also restored or replaced 193 major components and assemblies and plans about 100 more by the end of the year, on drill rigs, load-haul-dump machines, haul trucks and other Caterpillar, Sandvik and Epiroc equipment.</p>
<p>Tyres are the one supply item the post itemises. Kazakhmys said its warehouses hold 183 large tyres, enough for about 26 days at the current average rate of use, and that it has signed a contract and placed an order for 943 more, with deliveries on schedule.</p>
<p>The equipment programme runs alongside work on buildings at the Balkhash smelter. In a <a href="https://t.me/kazakhmys_news/5616">post on 27 October</a>, the company said Kazakhmys Smelting plans to repair 27,310 square metres of roofing in 2026 and has completed 16,871, about 62 per cent. In the copper smelting shop, 2,642 of a planned 4,868 square metres are done. The company has set aside KZT 3.74bn this year for repairs to buildings and structures at the Balkhash site, covering the smelter, the copper electrolysis shop, the precious metals and sulphuric acid shops and the charge preparation shop.</p>
<p>A third programme covers 90 <a href="https://t.me/kazakhmys_news/5627">welfare and amenity buildings</a> at the group's sites, from changing rooms to canteens and medical points. Kazakhmys said repairs are complete at 34, under way at 30 and in preparation at 26. Of the finished sites, 17 belong to the Jezqazgan Tau-ken ondirisi production association, including the amenity block of shafts 73 to 75 at the West Zhezkazgan mine, and six each to the Balqash and Qaragayly associations.</p>
<p>The posts give no production figures, so they do not show how the repairs have changed mine output or availability. The Balkhash smelter and its feed are covered in Corridor Minerals' report on <a href="https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review">the government's Balkhash review</a>, and the owners of the country's copper producers in its <a href="https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners">ownership explainer</a>.</p><p><a href="https://corridorminerals.com/news/kazakhmys-repairs-346-units-mining-equipment-2026-kzt-6-7bn-programme">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Erdenes Tavan Tolgoi offers 998,400 tonnes of thermal coal in one lot</title><link>https://corridorminerals.com/news/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The 23 October lot, 156 packages with a US$85.1 floor, was 77.6 per cent of the coal the company listed on the exchange from 21 to 30 October.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026.jpg?v=c882dcb2" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Coal auctions, ETT offers 998,400 tonnes of thermal coal in one lot</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026.jpg?v=c882dcb2" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026.jpg?v=c882dcb2" length="126522" type="image/jpeg"/><content:encoded><![CDATA[<p>Erdenes Tavan Tolgoi put 998,400 tonnes of thermal coal up for sale in a single lot on the Mongolian Stock Exchange on 23 October, with a starting price of US$85.1 a tonne, <a href="https://mse.mn/uploads/auction_schedules/mn-2636-TC.pdf">its trading notice</a> says.</p>
<p>The notice splits the volume into 156 packages, or 6,400 tonnes each on a Corridor Minerals calculation. The notice sets the lowest calling price at US$85.1 and requires each call to raise it by at least US$0.3. The price is index-based with no quality adjustment, and the contract runs for 12 months to 23 October 2027. Delivery is to the buyer's nominated customs zone at Mandal on the Chinese side of the border, by road and rail. The schedule calls for 60.2 thousand tonnes in each of November and December 2026, then 87.8 thousand tonnes a month from January to 23 October 2027, with 25 per cent paid in advance.</p>
<p>The notice also sets US$8,496,384 for exchange buyers and US$4,248,192 for brokers, which on a Corridor Minerals calculation is 10 per cent and 5 per cent of the 998,400 tonnes valued at the floor price, or about US$85.0 million.</p>
<p>The lot sat inside a busy ten days. The company's <a href="https://ett.mn/operation/notices">notices page</a> lists ten auctions of coal from 21 to 30 October, and the exchange's <a href="https://comex.mse.mn/show-notices?isChangedPrice=&product=1&product_type=&seller=1&start_date=&end_date=">own register</a> carries the same lots. Nine of them are 32,000 tonnes each, in five packages. Together the ten total 1,286,400 tonnes, and on a Corridor Minerals calculation the 23 October thermal lot is 77.6 per cent of that.</p>
<table>
<thead><tr><th>Auction, 2026</th><th>Grade (notice)</th><th>Tonnes</th><th>Floor, US$ a tonne</th><th>Contract, months</th><th>Delivery port</th></tr></thead>
<tbody>
<tr><td>21 Oct</td><td>Medium-volatile coking (2649-CO)</td><td>32,000</td><td>177.7</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>22 Oct</td><td>Washed weakly coking (2640-13 WCO)</td><td>32,000</td><td>182.9</td><td>3</td><td>Mandal</td></tr>
<tr><td>23 Oct</td><td>1/3 coking (26121-13 CO)</td><td>32,000</td><td>170.0</td><td>3</td><td>Mandal</td></tr>
<tr><td>23 Oct</td><td>Thermal (2636-TC)</td><td>998,400</td><td>85.1</td><td>12</td><td>Mandal</td></tr>
<tr><td>26 Oct</td><td>Medium-volatile coking (2650-CO)</td><td>32,000</td><td>181.8</td><td>3</td><td>Mandal</td></tr>
<tr><td>27 Oct</td><td>Washed weakly coking (2641-13 WCO)</td><td>32,000</td><td>167.6</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>28 Oct</td><td>Thermal (2637-TC)</td><td>32,000</td><td>82.1</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>29 Oct</td><td>1/3 coking (26122-13 CO)</td><td>32,000</td><td>163.9</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>30 Oct</td><td>1/3 coking (26123-13 CO)</td><td>32,000</td><td>107.3</td><td>6</td><td>Gants Mod</td></tr>
<tr><td>30 Oct</td><td>Thermal (2638-TC)</td><td>32,000</td><td>82.1</td><td>6</td><td>Gants Mod</td></tr>
</tbody>
</table>
<p>All floor prices in the table come from the individual notices. The register also prints a higher figure beside some of the floors, for example 92.1 alongside 85.1, which the notices do not explain, so Corridor Minerals uses only the notice figure. These are starting prices. None of the documents read reports a result, so no clearing price or volume sold is given here.</p>
<p>Coking coal sat in a narrow band. Six of the seven coking lots opened between US$163.9 and US$182.9 a tonne. The 1/3 coking lot of 29 October, specified at no more than 9.0 per cent ash and 1.0 per cent sulphur, started at US$163.9, 3.6 per cent below the US$170.0 of the 23 October lot with the same specification, on a Corridor Minerals calculation. The two differ in terms: the earlier lot ran three months to Mandal, the later six months to Gants Mod.</p>
<p>The outlier is the 30 October 1/3 coking lot at US$107.3. Its notice allows ash of 22.0 per cent, plus or minus 3.0, which puts it on a lower-grade specification, and the floor is 34.5 per cent below the US$163.9 lot, on a Corridor Minerals calculation. The three thermal lots opened at US$85.1 and US$82.1 twice. The 23 October floor is US$3.0, or 3.7 per cent, above the smaller lots, on a Corridor Minerals calculation, with a 12-month contract against six.</p>
<p>The auctions feed a trade that is rising in value. Mongolia exported goods worth US$16.2 billion in January to September, with coal adding US$2 billion to the increase on the year, <a href="https://centralasiawire.com/articles/mongolias-exports-rise-51-in-nine-months-to-16-2-billion-on-copper-and-coal">Central Asia Wire reported</a> from the National Statistics Committee release; the report gives no volumes. Other Mongolian coal producers report into the same market. Mongolian Mining Corporation <a href="https://corridorminerals.com/news/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks">reported lower third-quarter coking coal sales</a>, and <a href="https://corridorminerals.com/news/aspire-mining-ovoot-coking-coal-mongolian-otc-bond-us-9-6-million">Aspire Mining is raising Mongolian bonds</a> for its Ovoot coking coal mine.</p><p><a href="https://corridorminerals.com/news/erdenes-tavan-tolgoi-998400-tonne-thermal-coal-lot-october-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kumtor doubles its payments to the Kyrgyz state to $627.8m</title><link>https://corridorminerals.com/news/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit</link><guid isPermaLink="true">https://corridorminerals.com/news/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Nine-month revenue passed $1bn and net profit rose 71 per cent, but the third quarter brought in less than the first half&#x27;s quarterly average.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit.jpg?v=d9b9a2ea" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kyrgyzstan gold, Kumtor doubles its payments to the state</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit.jpg?v=d9b9a2ea" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit.jpg?v=d9b9a2ea" length="118150" type="image/jpeg"/><content:encoded><![CDATA[<p>Kumtor Gold Company, which runs the Kumtor gold mine in Kyrgyzstan, paid $627.8m in taxes, dividends and other mandatory payments to the state in the first nine months of 2026, twice the $309.9m of a year earlier, <a href="https://www.kumtor.kg/en/kumt%d3%a9r-mamleketke-t%d2%afsh%d2%af%d2%afch%d2%af-t%d3%a9l%d3%a9md%d3%a9rd%d2%af-eki-ese-k%d3%a9b%d3%a9jtt%d2%af-toguz-ajda-deerlik-628-mln-dollar-kotordu/">the company said</a> on 27 October.</p>
<p>Revenue for January to September rose nearly 38 per cent to $1,012.8m from $735.8m, and net profit 71 per cent to $548.4m from $320.2m, the release shows. It sets both against earlier years: nine-month revenue was $579.8m in 2024 and $558.2m in 2023, and net profit $216.6m and $173.2m, so profit has more than tripled in three years.</p>
<p>Taxes and other mandatory payments, the part of the total that goes to the budget, rose nearly 74 per cent to $277.8m from $159.9m. The comparable figures were $114.7m in 2024 and $124.2m in 2023. The release does not give the dividend figure for the nine months. Subtracting taxes and other mandatory payments from the total leaves $350.0m, a Newsdesk calculation from the release.</p>
<p>Taxes and other mandatory payments took 27 per cent of revenue in the nine months, against 22 per cent a year earlier, on the same basis. The release does not break the total down by tax or say whether rates or the tax base changed. The first-half release gave taxes in soms, KGS 19bn, rather than dollars, so it cannot be set directly against the nine-month figure in dollars.</p>
<h2>A smaller third quarter</h2>
<p>The nine-month figures can be split using the company's <a href="https://www.kumtor.kg/en/kumt%D3%A9r-2026-zhyldyn-6-ajynda-%D3%A9lk%D3%A9-byudzhetine-19-mlrd-som-kotordu/">first-half release</a> of 16 July, which gave revenue of $732.7m and net profit of $418.9m for January to June, and dividends of $300m paid to Kyrgyzaltyn, its sole shareholder. On those figures the third quarter brought in about $280.1m of revenue and $129.5m of net profit, a Newsdesk calculation. Both are below the first half's average of about $366.4m of revenue and $209.5m of profit a quarter.</p>
<p>The same two releases leave the dividend side open. The first half's $300m is below the $350.0m left after taxes in the nine-month total, but neither release says whether the difference is a third-quarter dividend, another payment or a matter of how the two periods were counted.</p>
<p>Neither release gives gold output, ore grades, the price the company realised or costs, so the figures alone do not show what changed in the quarter. Net profit was 54 per cent of revenue for the nine months, against 44 per cent a year earlier, and about 46 per cent in the third quarter, on the same calculation.</p>
<p>For the whole of 2025 Kumtor reported revenue of $1.434bn, net profit of more than $706m and taxes and other mandatory payments of $246.5m, and its shareholder approved dividends of $300m, <a href="https://economist.kg/ekonomika/2026/10/27/kumtor-platezhi-627-8-mln-2026/">Economist.kg reported</a> on 27 October. The same report put the mine's 2025 output at 12.081 tonnes of gold. The release of 27 October gives no production figure for 2026.</p>
<h2>Four and a half years of state management</h2>
<p>In a <a href="https://www.kumtor.kg/en/kumt%d3%a9r-mamlekettik-bashkaruuga-%d3%a9tk%d3%a9n-45-zhyl-ichinde-byudzhetke-12-mlrd-dollardan-ashyk-karazhat-kotoruldu/">release of 21 July</a> covering what it called four and a half years of state management, January 2022 to June 2026, the company put its revenue at $4.99bn and its net profit at $2.20bn. It paid $1.23bn in taxes and other mandatory payments to the budget over the period and $741.3m in dividends to Kyrgyzaltyn, together about $1.97bn, a Newsdesk calculation. Over the same four and a half years the payments to the budget came to about a quarter of revenue.</p>
<p>The nine-month figures were also carried on 27 October by the Bishkek outlets Akchabar and Open.kg, with the same totals; Open.kg attributed them to the company's financial report for the first nine months of the year. Neither added output, cost or price figures for 2026.</p>
<p>Kyrgyzaltyn is also investing in new deposits. It started building a processing plant at its Togolok deposit in September and plans projects worth more than $1bn at five deposits over three years, <a href="https://corridorminerals.com/news/kyrgyzaltyn-togolok-gold-plant-azergold-joint-projects">as Corridor Minerals reported</a>. Elsewhere in the country the Altyn-Tor plant at the Solton-Sary deposit in Naryn region, in which Kyrgyzaltyn holds 35 per cent, began test operations in September (<a href="https://corridorminerals.com/news/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan">see the earlier report</a>).</p>
<p>The 27 October release did not say when Kumtor will publish its full-year figures for 2026 or its production for the year; for 2025, Economist.kg reported its annual profit on 1 April.</p><p><a href="https://corridorminerals.com/news/kumtor-nine-month-2026-payments-to-state-627-8-million-revenue-net-profit">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>CVK Maden&#x27;s first gold sales bring in 40 per cent of its revenue</title><link>https://corridorminerals.com/news/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar</link><guid isPermaLink="true">https://corridorminerals.com/news/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The Turkish chrome miner sold 11,998 ounces from Sarıalan in nine months and has a US$192m loan for its next project, Yenipazar.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar.jpg?v=4ce464b9" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Türkiye gold, CVK&#x27;s first gold sales lift revenue</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar.jpg?v=4ce464b9" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar.jpg?v=4ce464b9" length="124556" type="image/jpeg"/><content:encoded><![CDATA[<p>CVK Maden İşletmeleri, a Turkish chrome miner new to gold, sold 11,998 ounces of gold in concentrate, which also contains silver, in the first nine months of 2026 for TL 2.22bn, 40 per cent of its revenue, <a href="https://www.kap.org.tr/en/Bildirim/1687050">the company said</a> on 26 October.</p>
<p>Revenue rose to TL 5.58bn from TL 3.11bn a year earlier, an increase of 79 per cent, a Newsdesk calculation from the report. Net profit was TL 1.80bn, against TL 558.3m, and the part attributable to the company's shareholders TL 1.86bn, against TL 509.0m, <a href="https://www.kap.org.tr/en/Bildirim/1687049">the consolidated interim statements</a> show. The statements restate every figure, including those for 2025, in the purchasing power of the lira at 30 September 2026, under inflation accounting.</p>
<p>Chrome still brought in most of the money. The group sold 207,669 tonnes of chrome ore for TL 3.07bn, 55 per cent of revenue, against 94 per cent a year earlier, when gold brought in nothing. Royalty income from mining areas run by contractors added TL 291.9m. Sales abroad made up 79 per cent of revenue, against 66 per cent.</p>
<p>The third quarter carried the year. Revenue for July to September was TL 2.79bn, against TL 969.2m, and the quarter's net profit TL 1.10bn, after a loss of TL 184.8m in the same quarter of 2025, the statements show.</p>
<h2>Sarıalan moves to full capacity</h2>
<p>Trial production began at the Sarıalan gold operation in Balıkesir province on 18 February and the first concentrate was exported on 3 April, the report says. The company moved the plant to full capacity on 24 September, after a trial period in which it produced concentrate containing 14,450 ounces of gold up to 15 September, <a href="https://www.kap.org.tr/en/Bildirim/1667734">it said in a notice</a> that day.</p>
<p>Trafigura has a US$30 million offtake agreement, paid in advance, that gives it the right to buy all of the products from the planned open-pit production at Sarıalan until 2027, the report says. The company is paid separately for deliveries above the advance.</p>
<p>The report puts reserves at the two Sarıalan licences at 674,646 ounces of gold equivalent under UMREK, Türkiye's national reporting code: 538,625 ounces proved and 25,156 ounces probable on the main licence, in a report of May 2024, and 75,435 ounces measured and 35,430 ounces indicated on the adjacent licence bought in 2025, in a report of October 2025.</p>
<h2>Yenipazar is the next build</h2>
<p>The next project is Yenipazar, a polymetallic deposit in Yozgat province held by Aldridge Mineral Madencilik, which CVK controls through its 70 per cent of Virtus Mining. Aldridge signed a US$192 million loan with Türkiye Vakıflar Bankası on 29 January, for nine years with no principal repayment in the first three, <a href="https://www.kap.org.tr/en/Bildirim/1549155">the company said</a> the next day. The project is expected to cost US$240 million in all, so the loan covers 80 per cent and Virtus is to provide the rest as equity.</p>
<p>A 2024 report under the UMREK code puts Yenipazar's indicated and inferred resources at 1,211,084 ounces of gold, 40,017,230 ounces of silver, 123,156 tonnes of copper, 401,833 tonnes of lead and 585,694 tonnes of zinc, or 3,465,066 ounces of gold equivalent. The drilling behind it covered about a tenth of the 9,239 hectare licence, the company says. Since the loan, it has signed contracts for engineering, procurement of the main machinery and the site's buildings, and made most of the land payments for the site, the interim report says. Group long-term borrowings rose to TL 2.26bn at the end of September from TL 721.4m at the end of 2025, the balance sheet shows; the statements do not say how much of that is the Yenipazar loan.</p>
<p>A third project, TV Tower in Çanakkale province, has so far been explored and drilled, though its four licences carry operation permits; it has resources of 2.23 million ounces of gold, 36.3 million ounces of silver and 764.94 million pounds of copper, 4.58 million ounces of gold equivalent, in a 2024 report; plans for a plant will be considered later, the company says.</p>
<p>CVK is also preparing to list part of its chrome business. It filed a draft prospectus with the Capital Markets Board on 12 October for a public offering of part of Hayri Ögelman Madencilik, the subsidiary that runs its chrome mines and in which it owns 96.206 per cent, <a href="https://www.kap.org.tr/en/Bildirim/1679896">it said</a> on 13 October. Türkiye's chrome ore exports rose 65 per cent to US$386.5 million in the first nine months of the year, a company calculation from Istanbul Mineral Exporters' Association data shows.</p>
<p>Gold producers in Türkiye pay a state royalty that rises with the metal price, and on the table in the Mining Law it stood at 22 per cent for gold at September's prices (<a href="https://corridorminerals.com/news/turkiye-mining-royalty-sliding-scale-2026-gold-copper-rates">see the Corridor Minerals explainer</a>). Among the country's larger metals groups, Erdemir approved its own nine-month results the week before, <a href="https://corridorminerals.com/news/erdemir-nine-month-2026-net-profit-tl-11-1bn-third-quarter-flat-steel-sales">as Corridor Minerals reported</a>.</p><p><a href="https://corridorminerals.com/news/cvk-maden-sarialan-gold-sales-nine-month-2026-revenue-yenipazar">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Glencore says Kazzinc&#x27;s own gold output fell 42 per cent on lower grades</title><link>https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Kazzinc&#x27;s own sourced gold was 237,000 ounces in nine months as grades fell at its ATK mine; third-quarter output was 88,000 ounces against 89,000.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026.jpg?v=f3bf16c8" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan gold, Kazzinc&#x27;s own gold output falls 42 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026.jpg?v=f3bf16c8" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026.jpg?v=f3bf16c8" length="110525" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazzinc, Glencore's Kazakh zinc and gold producer, produced 237,000 ounces of gold from its own sources in the first nine months of 2026, 42 per cent less than a year earlier, as head grades fell at the Altyntau-Kokshetau mine, <a href="https://www.glencore.com/.rest/api/v1/documents/static/7ed50c65-7d84-4cc1-a2c4-216060583297/GLEN_2026-Q3_ProductionReport.pdf">Glencore said</a> on 29 October.</p>
<p>The third quarter production report puts the shortfall at 171,000 ounces against January to September 2025 and ties it to lower grades at the mine, known as ATK, "as it transitions into its next development phase". The refurbishment of the ATK processing mill that Glencore reported earlier in the year has been completed, with normal operations resumed, the report says.</p>
<p>Glencore controls almost 70 per cent of Kazzinc, and most of the rest belongs to the state mining holding Tau-Ken Samruk, <a href="https://inbusiness.kz/ru/news/syrevoj-gigant-kazahstana-perezhil-obval-proizvodstva-zolota">the Kazakh business site Inbusiness.kz reported</a> in July. The 237,000 ounces are the whole of the gold that Glencore's zinc business reports from its own sources.</p>
<h2>The third quarter steadied</h2>
<p>The quarterly table shows where the drop happened. Kazzinc's own gold output was 127,000 ounces in the third quarter of 2025 and 135,000 ounces in the fourth. It fell to 60,000 ounces in the first quarter of 2026, recovered to 89,000 ounces in the second and was 88,000 ounces in the third, which Glencore's table shows as 1 per cent below the second quarter.</p>
<p><a href="https://www.glencore.com/.rest/api/v1/documents/static/e44bf57f-8768-4b27-8a33-39087d02d00a/GLEN_2026-H1ProductionReport.pdf">The half-year production report</a> of 29 July gave two reasons for a 47 per cent fall to 149,000 ounces in the first six months: lower head grades at ATK and the refurbishment of one of its two processing mills during the period. With the mill back in service, grade is the only reason the third quarter report gives, and third-quarter output was still about 31 per cent below the 127,000 ounces of the same quarter of 2025, a Newsdesk calculation from the table.</p>
<p>The report gives no gold forecast for Kazzinc and does not say when the next development phase at ATK is expected to lift grades.</p>
<h2>Smelters short of outside concentrate</h2>
<p>Kazzinc's smelters also treat material bought from other miners, and that side of the business shrank too. Including third-party feed, Kazzinc's smelters produced 469,000 ounces of gold in the nine months, 35 per cent less than the 720,000 ounces of a year earlier. Zinc metal fell 12 per cent to 162,600 tonnes and copper metal 7 per cent to 35,200 tonnes, while lead metal rose 6 per cent to 60,600 tonnes.</p>
<p>Unlike the mine output, total smelter gold fell between the second and third quarters. It was 124,000 ounces in the first quarter, 187,000 ounces in the second and 158,000 ounces in the third, 16 per cent below the second quarter, the table shows. Total smelter silver fell 19 per cent to 5.98 million ounces in the nine months.</p>
<p>Glencore puts the zinc and lead shortfall down to the supply of outside material rather than to its mines. Own sourced zinc production of 142,400 tonnes was 5 per cent lower than a year earlier, and own sourced lead production of 23,200 tonnes 19 per cent lower, "primarily due to limited availability of high-quality third-party concentrates for blending, which reduced the rate at which the smelters could process own sourced material", the report says.</p>
<p>The mix inside the zinc figure moved as a result. Zinc metal from Kazzinc's own sources fell 24 per cent to 68,900 tonnes, while zinc sold in concentrate rose 23 per cent to 73,500 tonnes, so more of the company's own ore left as concentrate instead of being refined. Own sourced silver metal, excluding silver in concentrate, fell 5 per cent to 2.35 million ounces, and own sourced copper metal 4 per cent to 10,700 tonnes.</p>
<h2>What it means for Kazakh gold supply</h2>
<p>Kazzinc's lower output arrives in a year when the National Bank of Kazakhstan, which has the right to buy all gold produced in the country, bought close to 36 tonnes in the first eight months and then said it would cut gold's share of reserves, as <a href="https://corridorminerals.com/news/kazakhstan-central-bank-gold-sales-reserve-share-target">Corridor Minerals reported</a> on 23 October. On the resource side, the government counts 157.2 tonnes of gold added to resources and reserves in 2024 and 2025, <a href="https://corridorminerals.com/news/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions">a figure that names no deposits</a> or mine lives.</p>
<p>At group level, Glencore kept its full-year 2026 production guidance for its key commodities and said it expects zinc towards the upper end of its range. The report does not break that guidance down by asset.</p><p><a href="https://corridorminerals.com/news/glencore-kazzinc-own-gold-output-falls-42-per-cent-atk-grades-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s mining share of fixed investment falls to 5.8 per cent</title><link>https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Mining drew UZS 33.9 trillion in nine months, against 9.5 per cent of the total a year earlier; electricity and gas fell to 6.7 per cent from 12.9.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026.jpg?v=4520ec37" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan investment, Mining&#x27;s share of Uzbek investment falls to 5.8 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026.jpg?v=4520ec37" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026.jpg?v=4520ec37" length="126637" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's mining industry absorbed UZS 33.9 trillion of fixed capital investment in January to September 2026, 5.8 per cent of the national total against 9.5 per cent a year earlier, <a href="https://stat.uz/img/news/invest--english_p51718.pdf">the National Statistics Committee said</a> on 29 October.</p>
<p>Total fixed investment reached UZS 584.2 trillion, 20.1 per cent more than in the same period of 2025, the release says. Electricity, gas, steam and air conditioning took UZS 39.0 trillion, or 6.7 per cent of the total against 12.9 per cent a year earlier. Manufacturing remained the largest recipient with UZS 160.8 trillion, and its share rose to 27.5 per cent from 25.5 per cent.</p>
<p>The shares of construction, agriculture and the release's line for other types of activities rose. Construction took 8.8 per cent against 7.0 per cent and agriculture, forestry and fisheries 8.9 per cent against 7.0 per cent, while transport and storage held at 4.7 per cent.</p>
<p>Foreign investment and loans used for fixed assets came to US$33.9bn, or UZS 408 trillion, in the nine months, the release says, about 70 per cent of all fixed investment on the Data Desk's division.</p>
<h2>The third quarter alone</h2>
<p>The mining share was already lower in the first half and fell further in the third quarter. The committee's first-half statement, <a href="https://www.trend.az/casia/uzbekistan/4215522.html">reported by Trend</a> in August, put total fixed investment at UZS 338.9 trillion, with UZS 21.8 trillion in mining and quarrying and UZS 29.9 trillion in electricity, gas, steam and air conditioning supply. That gives mining 6.4 per cent and power 8.8 per cent of first-half investment, on the Data Desk's division.</p>
<p>Subtracting the half-year from the nine-month figures leaves an implied UZS 245.3 trillion of investment in July to September, of which about UZS 12.1 trillion, or 4.9 per cent, went to mining and about UZS 9.1 trillion, or 3.7 per cent, to power. These are Data Desk calculations from rounded published values, and the committee does not publish quarterly figures in this release.</p>
<p>A falling share does not by itself mean less money. The release gives 2025 shares but not 2025 values by activity, and its growth rate for the total is not split by activity, so the Data Desk does not derive whether mining investment rose or fell in soums.</p>
<h2>Output keeps rising</h2>
<p>Output has kept rising while investment shares fell. <a href="https://stat.uz/img/news/press-reliz-sanoat-09-2026-en_p11189.pdf">The committee's industry release</a> for the same nine months puts mining and quarrying output at UZS 70.3 trillion, 6.5 per cent of UZS 1,085.7 trillion of industrial production, which grew 8.1 per cent; manufacturing made up UZS 943.2 trillion, or 86.9 per cent. Electricity generation rose 7.3 per cent to 67,159.5 million kWh, while heat produced by large enterprises fell 19.3 per cent.</p>
<p>That power figure has a shift inside it. Large enterprises generated 44,402.6 million kWh, slightly less than the 45,100.5 million kWh of a year earlier, while small business entities whose main activity is electricity production generated 22,756.9 million kWh against 17,464.7 million kWh, on the committee's survey data. Large enterprises' share of generation fell to about 66 per cent from about 72 per cent, on the Data Desk's division. On those figures, the small producers account for all of the growth in generation, and more.</p>
<p>Spending at project level continues. Navoi Mining and Metallurgical Company is building <a href="https://corridorminerals.com/news/nmmc-muruntau-conveyor-lines-investor-call-strategy-2035">7.7 km of new conveyor lines</a>, and the government has set up <a href="https://corridorminerals.com/news/uzbekistan-copper-purchase-finance-uzsanoatexport-cathode-300000-tonnes">purchase finance for cable makers</a> as copper cathode supply grows.</p>
<p>Values and shares are the committee's, from its releases on fixed investment of 29 October and on industrial production for January to September 2026, and its first-half figures as reported by Trend. First-half shares and the implied third-quarter values are Data Desk calculations.</p><p><a href="https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan finds seven prospective targets in its new geological mapping</title><link>https://corridorminerals.com/news/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Twenty 1:50,000 survey projects cover about 100,000 sq km; the government plans to prepare the first seven targets for auction next year.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year.jpg?v=e6242f1d" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan exploration, Seven survey targets head for auction</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year.jpg?v=e6242f1d" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year.jpg?v=e6242f1d" length="112247" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's new detailed geological mapping has already confirmed seven prospective objects, which the government plans to prepare for auction next year, Vice Minister of Industry and Construction Iran Sharkhan told <a href="https://primeminister.kz/ru/news/ispolnenie-poslaniya-prezidenta-20-proektov-geologorazvedki-i-semku-novogo-masshtaba-zapustyat-v-kazahstane-32048">a government meeting</a> on 29 October.</p>
<p>The objects come from the state geological survey at a scale of 1:50,000 that began this year, which Sharkhan said the country had started for the first time and which the ministry calls a second-generation programme. Twenty projects covering about 100,000 sq km are planned over the next three years, and the confirmation of the seven objects rests on preliminary data, according to the government's account of the meeting. The work is to be finished before the objects go to auction.</p>
<p>Alongside traditional methods, the survey uses Ionic Leach geochemistry to find hidden deposits, artificial intelligence, satellite data and drones, the government said.</p>
<h2>What the programme pays for</h2>
<p>The government approved the money for the programme in February. A resolution signed by Prime Minister Olzhas Bektenov released more than KZT 40.7bn from the government reserve for geological work in 2026, <a href="https://www.gov.kz/memleket/entities/mps/press/news/details/1167307?lang=ru">the Ministry of Industry and Construction said</a> on 23 February, to start the 20 second-generation survey projects at 1:50,000. Each area averages about 5,000 sq km.</p>
<p>The programme gives special attention to known and newly identified ore zones and to the assessment of ore fields with an estimate of forecast resources, and its results are to become the basis for detailed prospecting and exploration, the ministry said.</p>
<p>The 2026 season covers airborne geophysics and field work, including geochemistry, test pits and trenches, followed by preliminary laboratory analysis of samples, the ministry said. The survey areas are in the Akmola, Aktobe, Almaty, East Kazakhstan, Karaganda, Kostanay, North Kazakhstan, Mangystau, Turkestan, Abai and Ulytau regions.</p>
<p>The programme also includes six 2D seismic projects in the Shu-Sarysu and North Torgai basins, which the ministry describes as little studied for oil and gas. All the projects are to be completed by the end of 2028, and about KZT 240bn, or US$500m, is planned for state geological study over the three years, the ministry said. The KZT 40.7bn reserve release for 2026 is about a sixth of that sum, a Newsdesk calculation; the ministry gives no breakdown of the three-year figure by year.</p>
<h2>Gold, copper and rare metals</h2>
<p>The 1:50,000 work targets areas considered prospective for gold, copper, polymetals, rare and rare earth metals, lithium, tungsten and molybdenum, <a href="https://primeminister.kz/ru/news/reviews/poslanie-prezidenta-za-dva-goda-v-kazahstane-otkryto-54-novyh-mestorozhdeniya-31833">the government said</a> in a September review. That review put the country's geological and geophysical coverage at the older 1:200,000 scale at about 2.04 million sq km, with a goal of 2.2 million sq km in 2026, and said the more detailed survey was meant to give investors more structured information on areas worth further study.</p>
<p>The September review also listed 54 deposits registered in 2024 and 2025 and the growth in resources and reserves that came with them, including 157.2 tonnes of gold, <a href="https://corridorminerals.com/news/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions">as Corridor Minerals reported</a>. It named no deposits behind those totals. The same review said recent changes to the Subsoil Code had widened the electronic auction mechanism through which subsoil areas are offered, given the Unified Subsoil Use Platform a legal status and added support measures for strategic investors.</p>
<h2>A digital archive behind the auctions</h2>
<p>The second strand of the work is digital. More than 70,000 geological reports and 109,000 outlines of studied areas have been loaded onto the Unified Subsoil Use Platform, and the country's primary geological information, about 4.8 million items, has been fully digitised, Sharkhan said. The next steps are to integrate those materials into the platform, convert historical data into machine-readable form and sort it with artificial intelligence to speed up the search for new deposits.</p>
<p>Private explorers are working alongside the state programme. Ivanhoe Mines holds a stake in a 16,708 sq km joint venture searching for copper, and the ministry has offered it support, <a href="https://corridorminerals.com/news/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support">Corridor Minerals reported</a> on 30 October.</p>
<p>The government's account of the 29 October meeting does not name the seven objects, their regions or the minerals they are prospective for, and gives no date for the auctions beyond next year.</p><p><a href="https://corridorminerals.com/news/kazakhstan-geological-mapping-seven-prospective-objects-auction-next-year">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Eldorado cuts gold guidance as Kışladağ output falls on lower grades</title><link>https://corridorminerals.com/news/eldorado-kisladag-gold-output-falls-q3-2026-grades-guidance</link><guid isPermaLink="true">https://corridorminerals.com/news/eldorado-kisladag-gold-output-falls-q3-2026-grades-guidance</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Output at the Turkish heap leach fell to 22,713 ounces on a grade of 0.55 g/t; group outlook for existing mines is now 410,000 to 430,000 ounces.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/eldorado-kisladag-gold-output-falls-q3-2026-grades-guidance.jpg?v=409ecc5b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Eldorado Gold, Kışladağ output falls on grade</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/eldorado-kisladag-gold-output-falls-q3-2026-grades-guidance.jpg?v=409ecc5b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/eldorado-kisladag-gold-output-falls-q3-2026-grades-guidance.jpg?v=409ecc5b" length="114444" type="image/jpeg"/><content:encoded><![CDATA[<p>Eldorado Gold said on 28 October that its Kışladağ mine in Türkiye produced 22,713 ounces of gold in the third quarter, down from 37,184 a year earlier, and cut its 2026 production outlook for the group, in <a href="https://www.sec.gov/Archives/edgar/data/918608/000091860826000025/eldoradogoldreportsq32026f.htm">its third-quarter results</a>.</p>
<p>The group as a whole produced 106,351 ounces in the quarter against 115,190 in the third quarter of 2025. The release ties the decrease to Kışladağ, where a planned lower ore grade was stacked, and to Efemçukuru, where grade was also lower, with higher output at Lamaque partly offsetting both.</p>
<p>The revised outlook for operating assets, leaving out the Skouries and McIlvenna Bay projects, is 410,000 to 430,000 ounces of gold, against original guidance of 430,000 to 490,000. Including the two projects, it is 425,000 to 475,000 ounces, against 495,000 to 600,000. The release names Kışladağ and the Olympias mine as sources of lower expected production, and a slower than expected ramp-up at Skouries as a further cause; Skouries gold guidance falls to 10,000 to 35,000 ounces from 60,000 to 100,000.</p>
<h2>Lower grade and slower mining at Kışladağ</h2>
<p>Ore grade at Kışladağ fell to 0.55 grams per tonne in the third quarter from 0.70 a year earlier, partly offset by higher stacked tonnage, the release says. Eldorado gave two reasons: lower planned grades in the current cutback, and slower than planned mining progress that delayed access to higher-grade material during the quarter.</p>
<p>The quarter was better than the second. In its <a href="https://www.sec.gov/Archives/edgar/data/918608/000091860826000022/eldoradogoldreportsq22026f.htm">second-quarter results</a> of 30 July, Eldorado reported 19,108 ounces from Kışladağ against 46,058 a year earlier, at a grade of 0.40 grams per tonne against 0.74. The third-quarter figure is 19 per cent above that, on Corridor Minerals' calculation. For the nine months to 30 September, Kışladağ produced 70,160 ounces against 127,561 in the same period of 2025.</p>
<p>Costs rose with the fall in output. Total cash costs at Kışladağ were $2,328 an ounce sold in the third quarter against $1,309 a year earlier, and all-in sustaining costs $2,832 against $1,545. The release attributes the cash cost increase to lower production and higher production costs, which the release says were driven by higher labour and contractor costs, higher maintenance and higher reagent costs for water management after higher than average precipitation in the first half. Revenue from the mine was $93.1 million against $130.5 million.</p>
<p>Eldorado says higher-grade material is now being stacked on the North Heap Leach Pad. Because the leach cycle is about 300 days, the production benefit is expected toward the end of the fourth quarter and into 2027, the release says. A whole ore agglomeration circuit, built to increase permeability and cut leach time, is on track for commissioning and ramp-up in the first half of 2027.</p>
<p>The mine also takes more capital. Growth capital guidance for operating assets rose to $395 million to $430 million from $375 million to $405 million, which the release attributes in part to additional investment at Kışladağ, including land acquisitions and more waste movement for the Western Area.</p>
<h2>Efemçukuru holds closer to last year</h2>
<p>Efemçukuru produced 17,073 ounces in the third quarter against 17,586 a year earlier. Its grade fell to 4.44 grams per tonne from 4.71, partly offset by higher mill throughput and recovery. Gold sold was 15,908 ounces against 20,031 because a concentrate shipment was delayed to October, the release says, and revenue was $72.8 million against $77.8 million. All-in sustaining costs there were $2,313 an ounce sold against $1,791.</p>
<p>The release also touches Türkiye's fiscal terms. Production costs at Efemçukuru rose partly on higher royalty expense as a result of higher gold prices, while at Kışladağ the release lists lower royalty costs among the offsets to higher production costs. Türkiye's state royalty is a sliding scale that stood at 22 per cent for gold at September prices, Corridor Minerals found in its <a href="https://corridorminerals.com/news/turkiye-mining-royalty-sliding-scale-2026-gold-copper-rates">explainer on Mining Law No. 3213</a>; the Eldorado release does not give the rate it pays. Its adjustments for the first nine months of 2026 also include a $47.4 million gain on deferred tax due to changes in the Turkish corporate income tax rate.</p>
<p>Of the four operating mines, Lamaque, where Ormaque ore is lifting output, produced the most in the quarter at 52,748 ounces, followed by Kışladağ at 22,713, Efemçukuru at 17,073 and Olympias at 13,430. Kışladağ and Efemçukuru together made 37 per cent of the group's 106,351 ounces on Corridor Minerals' calculation.</p>
<h2>Price, guidance and the next checkpoint</h2>
<p>Eldorado realised an average $4,326 an ounce on gold sold in the quarter and $4,301 at Kışladağ, against $3,527 and $3,463 a year earlier. The release puts Kışladağ's lower revenue down to fewer ounces sold, partly offset by the higher price. Gold sold elsewhere in the region fetched similar prices: Erdene reported an average of US$4,315 an ounce at Mongolia's <a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">Bayan Khundii mine</a> in the same quarter.</p>

<p>The trade paper The Northern Miner <a href="https://www.northernminer.com/news/eldorado-drops-as-skouries-setbacks-cut-gold-outlook-18/1003896247/">put the cut</a> to the group's consolidated forecast at 18 per cent at the midpoint.</p><p>The next checkpoint is the Mineral Reserve and Mineral Resource update that Eldorado expects in the fourth quarter, which is to include life-of-mine optimisation for Kışladağ, and an evaluation of an investment decision on additional screening at the mine before year-end, the release says.</p><p><a href="https://corridorminerals.com/news/eldorado-kisladag-gold-output-falls-q3-2026-grades-guidance">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan adds 910,000 tonnes of copper ore capacity in nine months</title><link>https://corridorminerals.com/news/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The KZT 1.35bn copper line is small beside 250 MW of wind plants valued at KZT 104.6bn, the statistics bureau&#x27;s commissioning table shows.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026.jpg?v=eaeb5f66" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan capacity, Kazakhstan adds 910,000 tonnes of copper ore capacity</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026.jpg?v=eaeb5f66" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026.jpg?v=eaeb5f66" length="128098" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan commissioned 910,000 tonnes of copper ore mining and processing capacity in January to September 2026, with an actual value of KZT 1.35bn, <a href="https://stat.gov.kz/api/iblock/element/519454/file/en/">the Bureau of National Statistics said</a> on 23 October.</p>
<p>The table gives that line in thousand tonnes without stating a period, unlike the gold ore and ferroalloy lines, which it gives per year; the nine months are when the capacity entered service, not its throughput period.</p>
<p>Two regions make up the copper line. Karagandy added 250,000 tonnes, valued at KZT 1.33bn, and Pavlodar 660,000 tonnes, valued at KZT 19.7m, the bureau's table on the commissioning of non-residential facilities shows. The table gives no number of new objects for either region, only the capacity and its value, and it does not name the enterprises.</p>
<p>Other metals lines are smaller in tonnes and larger in value. Gold ore development capacity of 500,000 tonnes a year entered service in Akmola region, valued at KZT 1.44bn, and iron, steel and ferroalloy capacity of 175,000 tonnes a year in Karagandy, valued at KZT 5.77bn. The line for precious metals and rare metal ores, in Abay region, is marked confidential. Akmola is also where Zijin has started building <a href="https://corridorminerals.com/news/zijin-rg-gold-raygorodok-second-gold-plant-us600m-akmola">a second gold plant at Raygorodok</a>, though the bureau's figures do not identify any project.</p>
<p>Generation dominates by value. Wind plants of 250 MW, four objects in Aktobe (150 MW) and Karagandy (100 MW), had an actual value of KZT 104.6bn, about 78 times the copper ore line. Thermal capacity of 22 MW in Astana was valued at KZT 34.0bn, solar plants of 95.8 MW in Kostanay and Mangystau at KZT 31.6bn, gas turbines of 30.7 MW at KZT 20.7bn and hydropower of 34.8 MW at KZT 15.2bn, the last two in Zhetisu.</p>
<p>All 2,926 non-residential objects commissioned in the period had an actual value of KZT 2,555.2bn. Wind plants alone made up about 4.1 per cent of that, and the five power plant lines together about 8.1 per cent, on the Data Desk's division.</p>
<p>The government is setting larger targets for both sides. The vice minister of energy said on 29 October that 13.3 GW of generating capacity would enter service up to and including 2029, <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">the government said</a>. At the same meeting the vice minister of industry and construction said 20 state geological mapping projects at 1:50,000 scale would run over about 100,000 square kilometres in the next three years, with seven prospective objects to be prepared for auction next year, and that the ministry had approved <a href="https://primeminister.kz/ru/news/ispolnenie-poslaniya-prezidenta-20-proektov-geologorazvedki-i-semku-novogo-masshtaba-zapustyat-v-kazahstane-32048">a methodology for assessing the balance of production capacities</a>. It weighs new initiatives against market capacity, existing production and resource supply, and its results are to count when investment preferences and state support are allocated.</p>
<p>Copper already carries more weight in the export mix: <a href="https://corridorminerals.com/news/kazakhstan-copper-share-of-exports-january-august-2026">its share of Kazakhstan exports rose to 10.8 per cent</a> in eight months. In Karagandy region, Qarmet is installing <a href="https://corridorminerals.com/news/qarmet-rolling-mill-540000-tonnes-installation-dar-metall">a 540,000-tonne rolling mill</a> due by the end of 2026.</p>
<p>Capacities and actual values in thousand tenge are the bureau's, from its release of 23 October 2026; values are rounded here, and ratios are Data Desk calculations. The next release is due on 25 January 2027, the bureau says.</p><p><a href="https://corridorminerals.com/news/kazakhstan-910000-tonnes-copper-ore-capacity-commissioned-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Tajikistan&#x27;s metal ore output falls 5.2 per cent in nine months</title><link>https://corridorminerals.com/news/tajikistan-metal-ore-output-falls-nine-months-2026-precious-exports-rise</link><guid isPermaLink="true">https://corridorminerals.com/news/tajikistan-metal-ore-output-falls-nine-months-2026-precious-exports-rise</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Exports of precious metals and stones still rose to $521.3 million, while base metal exports fell by $191.1 million and coal output climbed 17.1 per cent.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/tajikistan-metal-ore-output-falls-nine-months-2026-precious-exports-rise.jpg?v=82635ff7" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Tajikistan, mining data, Tajik ore output down, precious exports up</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/tajikistan-metal-ore-output-falls-nine-months-2026-precious-exports-rise.jpg?v=82635ff7" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/tajikistan-metal-ore-output-falls-nine-months-2026-precious-exports-rise.jpg?v=82635ff7" length="112652" type="image/jpeg"/><content:encoded><![CDATA[<p>Tajikistan's output of metal ores fell 5.2 per cent in the first nine months of 2026 from a year earlier, while exports of precious metals and stones rose 56.7 per cent, the country's statistics agency said in its <a href="https://www.stat.tj/wp-content/uploads/2026/10/asosi-9-2026-doklad-russkij.pdf">January to September report</a>.</p>
<p>Mining as a whole produced 13,701.1 million somoni of output, 4.0 per cent less than a year earlier in comparable prices, the agency said. Metal ores make up most of it: 12,788.5 million somoni. Crude oil and natural gas fell 32.8 per cent. Coal went the other way: hard coal output rose 17.1 per cent to 2,283,719.6 tonnes and brown coal 18.5 per cent to 67,925.0 tonnes.</p>
<p>The export lines tell a different story from the mine output. Exports in total rose 18.4 per cent to $2,169.5 million. Mineral products, a group that covers ores and concentrates as well as cement, oil products, coal and electricity, rose 43.8 per cent to $821.5 million. Precious and semi-precious stones and metals rose to $521.3 million from $332.7 million. Base metals and articles of them, which include aluminium and copper, fell 28.7 per cent to $473.7 million, $191.1 million less than a year earlier.</p>
<table><thead><tr><th>Export group, January to September</th><th>2025, $ thousand</th><th>2026, $ thousand</th><th>Change</th></tr></thead><tbody><tr><td>Mineral products</td><td>571,118</td><td>821,473</td><td>+43.8 per cent</td></tr><tr><td>Precious stones and metals</td><td>332,672</td><td>521,291</td><td>+56.7 per cent</td></tr><tr><td>Base metals and articles</td><td>664,800</td><td>473,727</td><td>minus 28.7 per cent</td></tr></tbody></table>
<p>The agency's report does not split the export lines into volume and price. Prices moved up: the World Bank expects precious metal prices to rise by 40 per cent on average in 2026, with gold and silver both on course for annual records, it said in its <a href="https://thedocs.worldbank.org/en/doc/2ac43f46629cf90c2ea5b8929a343593-0050012026/original/CMO-October-2026.pdf">Commodity Markets Outlook</a> of 28 October.</p>
<p>China took 30.5 per cent of Tajikistan's exports in the nine months and Switzerland 23.5 per cent, Interfax <a href="https://interfax.com/newsroom/top-stories/119682/">reported</a>, citing the agency. Elsewhere in the region, Azerbaijan's gold sales to Switzerland <a href="https://corridorminerals.com/news/azerbaijan-gold-exports-switzerland-rise-29-percent-january-august-2026">rose on price</a> in the first eight months as volume slipped. The ore line also covers antimony, where <a href="https://corridorminerals.com/news/tajikistan-antimony-who-mines-processes-and-where-us-fits">two operations dominate</a> Tajik output; the agency does not publish a breakdown by metal in this report.</p>
<p>Imports rose faster than exports, by 40.8 per cent to $8,482.9 million, so the trade deficit reached $6,313.4 million in the nine months.</p><p><a href="https://corridorminerals.com/news/tajikistan-metal-ore-output-falls-nine-months-2026-precious-exports-rise">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Centerra&#x27;s Öksüt gold output falls 36 per cent on lower leach grades</title><link>https://corridorminerals.com/news/centerra-oksut-gold-output-falls-36-per-cent-q3-2026-leach-grade</link><guid isPermaLink="true">https://corridorminerals.com/news/centerra-oksut-gold-output-falls-36-per-cent-q3-2026-leach-grade</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The Turkish mine stacked ore at 0.85 g/t against 1.82 a year earlier, lifting all-in sustaining costs to $1,893 an ounce in the third quarter.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/centerra-oksut-gold-output-falls-36-per-cent-q3-2026-leach-grade.jpg?v=b3411df9" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Turkish gold, Öksüt output falls as leach grade drops</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/centerra-oksut-gold-output-falls-36-per-cent-q3-2026-leach-grade.jpg?v=b3411df9" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/centerra-oksut-gold-output-falls-36-per-cent-q3-2026-leach-grade.jpg?v=b3411df9" length="112368" type="image/jpeg"/><content:encoded><![CDATA[<p>Centerra Gold said its Öksüt mine in Türkiye produced 31,359 ounces of gold in the third quarter against 49,234 a year earlier, a fall of 36 per cent, in its <a href="https://www.sec.gov/Archives/edgar/data/1854640/000162828026068296/exh_992x20260930.htm">quarterly management's discussion and analysis</a>.</p>
<p>The document, dated 29 October and filed with the US Securities and Exchange Commission, puts the grade of ore stacked on the heap leach pad at 0.85 g/t against 1.82. Over nine months the mine produced 102,340 ounces, 1 per cent more than the 100,986 of the same period of 2025.</p>
<h2>Grade did the damage, not tonnage</h2>
<p>Öksüt moved slightly more material than a year earlier. The MD&amp;A shows 4.97 million tonnes mined in the quarter against 4.88 million, 1.73 million tonnes of ore mined against 1.62 million, and 1.50 million tonnes of ore stacked against 1.48 million. The grade of the ore mined fell to 0.79 g/t from 1.71, and the gold contained in what was stacked fell 53 per cent to 41,003 ounces from 86,422.</p>
<p>In its <a href="https://www.sec.gov/Archives/edgar/data/1854640/000117184326006975/exh_991.htm">third quarter results release</a>, Centerra said mining in the quarter focused on phases 5 and 6 of the Keltepe pit, and that the company remains on track for its 2026 Öksüt guidance of 120,000 to 135,000 ounces. That range was raised with the second quarter report from 110,000 to 125,000 ounces. Reaching the low end needs about 17,700 ounces in the fourth quarter, by Corridor Minerals' arithmetic, a little over half of the third quarter's output.</p>
<h2>Royalties and costs per ounce</h2>
<p>Unit costs rose with the lower output. Gold production costs were $1,659 an ounce in the quarter against $1,219 a year earlier, and all-in sustaining costs on a by-product basis, a non-GAAP measure, were $1,893 against $1,473. Centerra reaffirmed its 2026 Öksüt range of $1,850 to $1,950 an ounce for that measure.</p>
<p>Royalties paid to the Turkish state are a large part of the bill. The MD&amp;A says Öksüt's production costs include government royalties of $20.4 million in the quarter and $68.9 million in nine months, the nine-month figure including a $4.6 million adjustment to the 2025 royalty cost, against $24.2 million and $39.7 million a year earlier. For the full year the company expects royalties to make up $600 to $700 an ounce of production costs of $1,650 to $1,750, at an assumed gold price of $4,250. Türkiye's sliding royalty scale, which rises with the gold price, is set out in Corridor Minerals' <a href="https://corridorminerals.com/news/turkiye-mining-royalty-sliding-scale-2026-gold-copper-rates">explainer on the 2026 rates</a>.</p>
<p>A higher realised price softened the fall in revenue. Öksüt sold gold at an average of $4,165 an ounce in the quarter against $3,487, and its revenue fell 23 per cent to $130.7 million from $169.1 million. Cash provided by mine operations fell to $68.3 million from $139.4 million, and free cash flow from the mine, a non-GAAP measure, to $65.8 million from $133.6 million. Earnings from mine operations were $62.9 million against $90.2 million, which the MD&amp;A attributes mainly to fewer ounces sold, partly offset by the higher price.</p>
<p>Site costs crept up as well. Mining costs were $3.52 a tonne mined against $3.16, and on-site costs $26.09 a tonne processed against $24.07. Sustaining capital spending fell to $2.5 million in the quarter from $5.8 million. Over nine months, Öksüt's revenue rose 38 per cent to $455.7 million, on the higher gold price and slightly higher sales.</p>
<h2>Tax cut and a mine life study in 2027</h2>
<p>Centerra said the Turkish government announced in June changes expected to cut Öksüt's corporate income tax rate to 12.5 per cent from 25 per cent from 1 January 2027, which it expects to lift the mine's long-term cash flow. A Life of Mine Optimization study is under way, with results expected in early 2027 alongside the year-end disclosures. The company said the study will look at residual leaching of the heap leach facility and at bringing low-grade oxide mineralisation outside the current reserve pit into the mine plan.</p>
<p>Group gold output was 75,429 ounces in the quarter, with 44,070 from Mount Milligan in Canada. The board also approved a <a href="https://www.sec.gov/Archives/edgar/data/1854640/000117184326006976/exh_991.htm">quarterly dividend of C$0.07 a share</a>, payable on 2 December to shareholders of record on 19 November. For another corridor gold producer's third quarter, see Corridor Minerals' report on <a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">Bayan Khundii in Mongolia</a>.</p><p><a href="https://corridorminerals.com/news/centerra-oksut-gold-output-falls-36-per-cent-q3-2026-leach-grade">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan offers support to Ivanhoe&#x27;s 40,000 metre copper search</title><link>https://corridorminerals.com/news/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support</link><guid isPermaLink="true">https://corridorminerals.com/news/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support</guid><pubDate>Fri, 30 Oct 2026 00:00:00 +0000</pubDate><description>The Canadian miner has drawn its first $18.7m, committed $20m more and holds 20 per cent of a 16,708 sq km joint venture with Pallas Resources.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support.jpg?v=0b226687" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Copper exploration, Kazakhstan offers support to Ivanhoe&#x27;s Shu-Sarysu copper search</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support.jpg?v=0b226687" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support.jpg?v=0b226687" length="127612" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's industry minister Yersaiyn Nagaspayev told Ivanhoe Mines on 27 October that the government is ready to support its copper search in the Shu-Sarysu basin, where the company plans <a href="https://www.ivanhoemines.com/news-stories/news-release/ivanhoe-mines-issues-2026-second-quarter-financial-results-overview-of-operations-and-exploration-activities/">about 40,000 metres</a> of drilling, according to the ministry's <a href="https://www.trend.az/casia/kazakhstan/4239831.html">readout</a> as reported by Trend News Agency.</p>
<p>The search is run by the Chu-Sarysu Basin Exploration Joint Venture, which Ivanhoe formed with the UK-based private company Pallas Resources over a licence area of 16,708 square kilometres. Ivanhoe holds 20 per cent of the venture and can rise to 80 per cent through staged earn-in milestones, the company said in its second-quarter report of 29 July. It committed $18.7m of exploration funding over an initial two-year period, which has been fully drawn down, and from May 2026 it invested a further $20m, to be spread across all the licences. That more than doubled the planned drill programme, to about 40,000 metres.</p>
<p>Nagaspayev met Alexander Picard, Ivanhoe's executive vice president for corporate development and investor relations, the readout, which GURK.KZ also carried, said. It put Ivanhoe's projects in four regions, Zhambyl, Turkistan, Kyzylorda and Ulytau, over about 16,500 square kilometres, with about 18,000 metres drilled so far. Ivanhoe's own last published count, in the second-quarter report, was 7,048 metres for the year to the end of June, with three diamond drill rigs working. Ivanhoe's quarterly reports are the company's published count, so the 18,000 metres is the readout's number, not one the company has put in a report.</p>
<p>"We are open to mutually beneficial cooperation with Ivanhoe Mines and ready to support your projects and investments," Nagaspayev said, in the readout's wording. The readout also records discussion of Kazakhstan's aim of joining the world's top 10 producers of high-quality refined copper. Both sides confirmed an interest in long-term cooperation on exploration and mining; the readout records no document signed.</p>
<h2>What the first year of drilling found</h2>
<p>Ivanhoe set out the venture's geology on 4 September 2025, when it <a href="https://www.ivanhoemines.com/news-stories/news-release/ivanhoe-mines-announces-discovery-of-copper-mineralization-on-surface-at-project-licences-in-kazakhstan/">announced copper mineralisation at surface</a> on its Merke licence in the south of the basin and the start of a 15,000-metre drill campaign at Glubokoe, several hundred kilometres to the north. At Merke the mineralised zone is about 20 metres thick, on a licence with a 36-kilometre stratigraphic trend mapped by earlier work, with visible malachite, azurite and chalcocite, and several samples returned between 1.0 and 5.0 per cent copper. The company called the outcrop "clearly not an economic occurrence in isolation" and said it supported the thesis that faults and fractures channelled copper-bearing fluids into folded carbonate rocks.</p>
<p>The first hole at Glubokoe tested extensions of a 1980s Soviet-era stratigraphic hole that cut three copper-bearing intervals over 26 metres, with initial holes planned at 800 to 1,000 metres to calibrate geophysics against the historical data. The release described the Chu-Sarysu as the world's third-largest sediment-hosted copper basin after the Central African Copperbelt and the European Kupferschiefer, holding 27 million tonnes of known copper, including the Dzhezkazgan deposit mined for more than a century, with the US Geological Survey estimating about 25 million tonnes still undiscovered. By the second quarter of 2026 the company said the stratigraphic drilling continued to show promise across the district, but it has published no assay from a drill hole.</p>
<h2>Money drawn, money committed</h2>
<p>The venture's terms allow Ivanhoe to earn up to 80 per cent of all seven projects for a maximum consideration of $115m over four years, the September 2025 release said. The $18.7m first commitment is drawn down; the $20m added in May is committed, and the company said in its <a href="https://www.ivanhoemines.com/news-stories/news-release/ivanhoe-mines-issues-2026-first-quarter-financial-results-overview-of-operations-and-exploration-activities/">first-quarter report</a> of 6 May that the group's 2026 exploration budget rose to $127m from $90m, with $20m of it for the Kazakhstan venture. Spending reached $4m in the second quarter and $9m in the first half, the second-quarter report shows.</p>
<p>Those are exploration sums. No resource has been declared, and Ivanhoe has given no date for one. The ministry's readout lists the sequence it expects if the ground proves commercial: resource assessment and feasibility studies, then industrial production, with infrastructure and jobs in Kazakhstan.</p>
<h2>Where it sits in Kazakhstan's copper plans</h2>
<p>The top 10 ambition the minister cited rests on two smelter projects, each designed for 300,000 tonnes of cathode a year and each due in 2030: Kazakhmys's Qazaq Smelter at Balkhash, <a href="https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review">reviewed by the prime minister on 8 October</a>, and KAZ Minerals' Aktogay smelter, <a href="https://corridorminerals.com/news/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply">launched on 20 October</a>. Both will need concentrate that today goes almost entirely to China, as Corridor Minerals <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">reported from the trade tables</a>. The existing copper producers, and who owns them, are mapped in <a href="https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners">an earlier piece in this series</a>.</p>
<p>Kazakhstan's World Bank compact, which Corridor Minerals <a href="https://corridorminerals.com/news/kazakhstan-joins-world-bank-metals-minerals-compact-20bn-2031">covered on 20 October</a>, sets an exploration spending target per square kilometre, and the September release put exploration spending in the country at about $100m a year over 15 years, citing S&P Global. The Chu-Sarysu venture's $38.7m, the first two-year commitment plus the sum added in May, is one programme's money set against that pace for the whole country.</p>
<p>The next milestone is Ivanhoe's third-quarter report, which carries the exploration update. The second quarter's came 29 days after the quarter closed; the third quarter closed on 30 September.</p><p><a href="https://corridorminerals.com/news/ivanhoe-shu-sarysu-copper-drilling-40000-metres-kazakhstan-ministry-support">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Mongolian Mining Corporation&#x27;s coking coal sales fall 26 per cent in the third quarter as border trucks drop by a third</title><link>https://corridorminerals.com/news/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks</link><guid isPermaLink="true">https://corridorminerals.com/news/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks</guid><pubDate>Thu, 29 Oct 2026 00:00:00 +0000</pubDate><description>Run-of-mine output rose 8 per cent from the second quarter, but sales of washed coal fell to 1,996.9 thousand tonnes; the company gives no reason and no inventory figure.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks.jpg?v=3ab17358" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Coking coal, Mongolian coking coal sales fall 26 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks.jpg?v=3ab17358" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks.jpg?v=3ab17358" length="118440" type="image/jpeg"/><content:encoded><![CDATA[<p>Mongolian Mining Corporation sold 1,996.9 thousand tonnes of washed coking coal from its Ukhaa Khudag and Baruun Naran mines in the third quarter, 26 per cent less than in the second quarter and 13 per cent less than a year earlier, <a href="https://www.globenewswire.com/news-release/2026/10/16/3382220/0/en/mongolian-mining-corporation-operational-update-for-the-quarter-ended-30-september-2026.html">the Hong Kong-listed company said on 16 October</a>. Production of washed coal fell less, by 11 per cent from the second quarter to 2,503.1 thousand tonnes, and was 19 per cent higher than in the third quarter of 2025.</p>
<p>Run-of-mine coal output rose 8 per cent from the second quarter to 4,791.2 thousand tonnes and was 33 per cent above the 3,604.3 thousand tonnes of a year earlier. It processed 4,253.2 thousand tonnes of run-of-mine coking coal, 6 per cent less than in the second quarter.</p>
<h2>Fewer trucks at the border</h2>
<p>Coal-loaded trucks crossing the border averaged 897 per operating day in the quarter, the company said, 34 per cent fewer than the 1,366 of the second quarter and 29 per cent fewer than the 1,270 of the first. The 2026 average so far, 1,177 trucks a day, is still 15 per cent above the 2025 average of 1,023. The release does not explain the fall in sales or give a reason for the lower truck count, and it gives no inventory figure.</p>
<p>Production exceeded sales by about 506 thousand tonnes in the quarter, a Corridor Minerals calculation from the two lines of the company's table. The company does not say whether that coal was stockpiled at the mine, at the border or elsewhere.</p>
<p>Coking coal prices in China rebounded strongly during the quarter, mainly because supply from Chinese producers was constrained, the company said. It shows the Mongolian Stock Exchange auction prices for its main product only in a chart, without figures, and gives no realised coal price.</p>
<h2>Gold from Bayan Khundii</h2>
<p>The company's gold side, the Bayan Khundii mine, where it is Erdene Resource Development's partner, sold 11,853 ounces in the quarter at a weighted average price of US$4,315 an ounce, from 164.5 thousand tonnes of ore processed. Ore mined rose 68 per cent from the second quarter to 414.9 thousand tonnes. The quarter at the mine is covered in more detail in <a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">Corridor Minerals' report on Erdene's update</a>.</p>
<h2>Coal in Mongolia's export bill</h2>
<p>Coal and copper carry Mongolia's exports. The National Statistics Committee's figures for January to September put exports at US$16.2 billion, 51.2 per cent more than a year earlier, with copper ore and concentrate adding US$3.1 billion to the increase and coal US$2 billion, <a href="https://centralasiawire.com/articles/mongolias-exports-rise-51-in-nine-months-to-16-2-billion-on-copper-and-coal">Central Asia Wire reported</a>, citing the committee through Montsame. Copper concentrate earned US$7.08 billion and coal US$6.11 billion in the nine months, together 81.4 per cent of export earnings, <a href="https://ardnews.beehiiv.com/p/ardnews-2d4e">ArdNews reported</a>. Neither report gives export volumes.</p>
<p>Other coking coal projects in the country are raising money locally, such as <a href="https://corridorminerals.com/news/aspire-mining-ovoot-coking-coal-mongolian-otc-bond-us-9-6-million">Aspire Mining's Ovoot project in Khuvsgul</a>. The company's operational figures are unaudited and come from its internal records, it said, and may differ from its periodic reports. The next document is its next periodic report, for which the release gives no date.</p><p><a href="https://corridorminerals.com/news/mongolian-mining-corporation-q3-2026-coking-coal-sales-fall-border-trucks">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kounrad&#x27;s 2025 sustainability data: emissions down 5%, water use up 146%</title><link>https://corridorminerals.com/news/kounrad-2025-sustainability-data-emissions-water-taxes-kazakhstan</link><guid isPermaLink="true">https://corridorminerals.com/news/kounrad-2025-sustainability-data-emissions-water-taxes-kazakhstan</guid><pubDate>Wed, 28 Oct 2026 00:00:00 +0000</pubDate><description>Central Asia Metals&#x27; report shows the Kazakh copper site emits nine-tenths of group CO2 from coal boilers while solar covers 15% of its energy.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kounrad-2025-sustainability-data-emissions-water-taxes-kazakhstan.jpg?v=d857f05f" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: ESG data, Kounrad 2025: emissions down 5%, water use up 146%</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kounrad-2025-sustainability-data-emissions-water-taxes-kazakhstan.jpg?v=d857f05f" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kounrad-2025-sustainability-data-emissions-water-taxes-kazakhstan.jpg?v=d857f05f" length="117145" type="image/jpeg"/><content:encoded><![CDATA[<p>Kounrad, Central Asia Metals' copper operation in Kazakhstan, produced 48,640 tonnes of carbon dioxide equivalent in Scope 1 and 2 emissions in 2025, 5 per cent less than in 2024 and about nine-tenths of the London-listed group's total, according to the company's <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">2025 Sustainability Report</a>. The report names the coal boilers at Kounrad as the group's most significant source of Scope 1 emissions.</p>
<p>Group Scope 1 and 2 emissions fell 2 per cent to 53,770 tonnes, helped by improved coal efficiency at Kounrad and a warmer winter, while emissions intensity rose to 2.42 tonnes per tonne of copper-equivalent product from 2.31 because production was lower, the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a> says. The group's target is a 50 per cent cut in Scope 1 and 2 emissions by 2030 from a 2020 base; it reports a 45 per cent reduction so far.</p>
<table>
<thead><tr><th>Indicator, 2025</th><th><a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">Kounrad, Kazakhstan</a></th><th><a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">Sasa, North Macedonia</a></th><th><a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">Group</a></th></tr></thead>
<tbody>
<tr><td>Scope 1 and 2 GHG emissions, tCO2e</td><td>48,640 (2024: 51,236)</td><td>5,130</td><td>53,770 (2024: 55,059)</td></tr>
<tr><td>Water withdrawal, megalitres</td><td>847</td><td>4,325</td><td>5,172 (2024: 5,517)</td></tr>
<tr><td>Energy from own solar plant or renewable sources</td><td>15% of energy from the site's solar plant</td><td>100% of electricity renewable</td><td>29% of electricity (2024: 28%)</td></tr>
<tr><td>Taxes paid, $ million</td><td>42.1 (Kazakhstan)</td><td>14.2 (North Macedonia)</td><td>56.3</td></tr>
<tr><td>Revenue, $ million</td><td>129.7 (copper)</td><td>100.1 (zinc, lead, silver)</td><td>229.8 (calculated)</td></tr>
<tr><td>Community investment through foundations, $ million</td><td>0.5</td><td>0.2</td><td>0.8 in total, including a corporate fund</td></tr>
<tr><td>Closure provision, $ million (non-discounted closure cost)</td><td>9.5 (16.1)</td><td>27.5</td><td>37.1</td></tr>
<tr><td>Lowest wage against national minimum, per month</td><td>$655 against $163</td><td>$877 against $657</td><td>n/a</td></tr>
</tbody>
</table>
<h2>Water: a closed circuit, but more of it</h2>
<p>Kounrad drew 847 megalitres of water in 2025, mostly from an old mine shaft nearby and from Lake Balkhash, and its consumption rose 146 per cent from 2024, according to the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a>. The company attributes the rise to leaching mainly fresh ore blocks that had not been irrigated before: dry material needs its moisture content roughly doubled before solution flows out at a steady rate.</p>
<p>The site runs as a closed circuit with no significant water losses to the environment beyond evaporation, solution held in the dumps and sanitary wastewater that is taken off site, and its abstraction equals about 0.01 per cent of total annual withdrawal from Lake Balkhash, the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a> says. Preparations have begun for a new surface-water abstraction point to allow year-round abstraction from the lake; permitting is under way, with construction expected to be completed early in the second half of 2026, the report says, giving more flexibility as lake levels change with the seasons.</p>
<p>The company's solar power plant at Kounrad met 15 per cent of the operation's energy requirements, while in North Macedonia the Sasa mine has moved to 100 per cent renewable electricity, according to the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a>. Across the group, electricity was 54 per cent of total energy consumption of 706,698 gigajoules, and 29 per cent of electricity came from renewable sources.</p>
<p>Smaller measures at Kounrad in 2025 included temperature sensors on dripper lines to cut coal use, lighting upgrades saving 75,320 kilowatt-hours a year, an upgraded rectifier cooling-fan control designed to cut energy use at fan start-up by about 50 per cent, and a hybrid inverter with 15 kilowatts of battery storage as backup power for critical equipment, the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a> says. Winter leach blocks are fitted with dual dripper pipes to keep production going in extreme cold.</p>
<h2>What Kazakhstan receives</h2>
<p>The group paid $56.3 million in taxes in 2025, of which $42.1 million was paid in Kazakhstan and $14.2 million in North Macedonia, including payroll and other taxes, and Kounrad received a largest-taxpayer award from the State Revenue Department of the Karaganda region for the 2024 financial year, according to the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a>. Copper revenue from Kazakhstan was $129.7 million.</p>
<p>The average monthly salary at Kounrad was $1,675, and the lowest wage paid was $655 a month against a national minimum of $163. Women made up 19 per cent of Kounrad's employees. The Kounrad Foundation spent $0.5 million on community projects, and the company holds a $9.5 million closure provision for the site, against non-discounted closure costs of $16.1 million inflated to the end of mine life, the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a> shows. Neither the group nor its subsidiaries has made political donations, it says.</p>
<p>Safety held up. The group's lost-time injury frequency rate was 0.39 in 2025, against a target below 1.13, though its total recordable rate rose to 1.16 from 0.77, and there have been no fatalities at Kounrad or Sasa under the company's ownership, according to the <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">report</a>.</p>
<h2>Method</h2>
<p>All figures are from Central Asia Metals' <a href="https://wp-caml-2023.s3.eu-west-2.amazonaws.com/media/2026/04/CAML_SR25_WEB.pdf">2025 Sustainability Report</a>, published in April 2026 and listed on its <a href="https://www.centralasiametals.com/sustainability/sustainability-reports/">sustainability reports page</a>; they are company-reported. Sasa's emissions figure is Scope 1 only, as the report gives no Scope 2 figure for a site on 100 per cent renewable electricity. The group revenue total and Kounrad's share of group emissions are Data Desk calculations from the report's figures. The report did not give Kounrad's 2025 copper output alongside these data, so no site intensity is calculated here.</p><p><a href="https://corridorminerals.com/news/kounrad-2025-sustainability-data-emissions-water-taxes-kazakhstan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Bayan Khundii sells 11,853 ounces of gold in the third quarter as Erdene repays US$20m more debt</title><link>https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid</link><guid isPermaLink="true">https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid</guid><pubDate>Wed, 28 Oct 2026 00:00:00 +0000</pubDate><description>The Mongolian mine processed 164,000 tonnes at 2.3 g/t with 96 per cent recovery; production in ounces, costs and cash are due with results on 4 November.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid.jpg?v=ea928e23" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Mongolian gold, Bayan Khundii sells 11,853 ounces in the quarter</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid.jpg?v=ea928e23" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid.jpg?v=ea928e23" length="123135" type="image/jpeg"/><content:encoded><![CDATA[<p>The Bayan Khundii gold mine in Mongolia sold 11,853 ounces of gold and 3,046 ounces of silver in the third quarter, for gross revenue of US$51 million, and its owner repaid a further US$20 million of debt, <a href="https://www.globenewswire.com/news-release/2026/10/19/3383273/0/en/erdene-provides-q3-2026-update-and-notice-of-conference-call-and-webcast.html">Erdene Resource Development said on 19 October</a>. The plant processed 164 thousand tonnes of ore at an average 1,788 tonnes a day, at a grade of 2.3 grams of gold per tonne and a quarterly average recovery of 96 per cent.</p>
<p>Bayan Khundii is run by Erdene Mongol, the Mongolian subsidiary in which Mongolian Mining Corporation (MMC), the Hong Kong listed coking coal producer, agreed in 2023 to invest US$40 million for a 50 per cent interest, <a href="https://www.globenewswire.com/en/news-release/2023/05/04/2661535/0/en/Erdene-Closes-Second-Stage-of-Strategic-Alliance-With-Mongolian-Mining-Corporation-and-Reports-Q1-2023-Results.html">Erdene said at the time</a>. Erdene's latest release names MMC as its partner in the mine but gives no ownership percentages.</p>
<h2>Flat sales, more ore mined</h2>
<p>MMC's own operational update for the quarter shows that sales barely moved from the second quarter while mining picked up. Ore mined rose 68 per cent to 414.9 thousand tonnes from 247.2 thousand tonnes, and ore processed rose 7 per cent to 164.5 thousand tonnes, <a href="https://www.globenewswire.com/news-release/2026/10/16/3382220/0/en/mongolian-mining-corporation-operational-update-for-the-quarter-ended-30-september-2026.html">the update shows</a>. Gold sold was 1 per cent higher than the 11,709 ounces of the second quarter, while the average gold price fell 4 per cent to US$4,315 an ounce from US$4,493. Commercial production at the mine began on 14 September 2025, MMC says, which is why its year-on-year comparisons run into the thousands of per cent.</p>
<p>Erdene's chief executive, Peter Akerley, said third-quarter gold production was "slightly ahead" of the second quarter. The release gives no production figure in ounces, no all-in sustaining cost and no cash balance; those are due with the unaudited third-quarter financial and operating results after the market closes on Wednesday 4 November, followed by a conference call on Thursday 5 November.</p>
<p>The silver price averaged US$62 an ounce. On Corridor Minerals' calculation, gold accounts for almost all of the quarter's revenue: 11,853 ounces at US$4,315 comes to about US$51.1 million, and silver adds about US$0.2 million. The release also gives revenue as C$71 million.</p>
<h2>US$93 million of debt left</h2>
<p>The repayment brings total debt outstanding to US$93 million (C$132 million), Erdene said. Erdene published a preliminary economic assessment for its Zuun Mod molybdenum and copper project on 14 October, which Corridor Minerals covered in <a href="https://corridorminerals.com/news/erdene-zuun-mod-pea-molybdenum-copper-mongolia">its report on the study</a>. The 19 October release repeats the study's base case of an after-tax net present value of US$745 million at an 8 per cent discount rate and an internal rate of return of 16.1 per cent, at US$25.00 a pound for molybdenum and US$5.00 a pound for copper. It notes that the assessment is preliminary and includes Inferred Mineral Resources, so it is not a statement of reserves.</p>
<h2>Drilling plan for the fourth quarter</h2>
<p>Erdene plans about 16,000 metres of drilling with three rigs in the fourth quarter: about 9,000 metres at Bayan Khundii West, about 3,000 metres on the Dark Horse to Altan Arrow gold trend and about 4,000 metres at Zuun Mod and Khuvyn Khar. Quantec Geoscience is to run a 3D DCIP and magnetotelluric survey of 17 lines, each 6 km long and 400 metres apart, 102 line-km in all, imaging to more than 600 metres below surface, the release says.</p>
<p>MMC's update also covers its coking coal. In the same quarter it produced 2,503.1 thousand tonnes of washed coking coal, 11 per cent less than in the second quarter, and sold 1,996.9 thousand tonnes, 26 per cent less, as coal trucks crossing to Ganqimaodu in China averaged 897 per operating day against 1,366 in the second quarter, its update shows. Elsewhere in Mongolia's south, Rio Tinto reported higher copper output from <a href="https://corridorminerals.com/news/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up">Oyu Tolgoi</a> in the same quarter.</p>
<p>The next milestone is Erdene's unaudited results on 4 November, the first figures for the quarter's production, costs and cash.</p><p><a href="https://corridorminerals.com/news/bayan-khundii-gold-q3-2026-11853-ounces-erdene-debt-repaid">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Private owners hold most of Kazakhstan&#x27;s copper and gold assets</title><link>https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners</link><guid isPermaLink="true">https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners</guid><pubDate>Tue, 27 Oct 2026 00:00:00 +0000</pubDate><description>US Geological Survey tables and official releases show a state stake through Tau-Ken Samruk and two 2024 changes of owner or name.</description><category>Mining</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/who-owns-kazakhstan-copper-gold-producers-owners.jpg?v=aa413ba0" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Who owns, part 2, Private owners hold most of Kazakhstan&#x27;s copper and gold</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/who-owns-kazakhstan-copper-gold-producers-owners.jpg?v=aa413ba0" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/who-owns-kazakhstan-copper-gold-producers-owners.jpg?v=aa413ba0" length="132338" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's copper and gold are mostly in private hands, with the state's main holding through Tau-Ken Samruk, the US Geological Survey (USGS) <a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">table of the industry's structure</a> shows.</p>
<p>The first part of this series mapped Kazakhstan's uranium from Kazatomprom's own filings. Copper and gold have no single filer, so this second part starts from the US Geological Survey's table of the structure of Kazakhstan's mineral industry, whose latest edition covers 2023, and updates it where the survey's 2024 country review or official releases show a change. Kazakhstan produced 130,338 kilograms of mined gold in 2024 and an estimated 690,000 tonnes of copper contained in mine concentrates, <a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">the USGS says</a>.</p>
<table><thead><tr><th>Producer</th><th>Main copper and gold assets</th><th>Owners on record</th><th>Source</th></tr></thead><tbody><tr><td>KAZ Minerals</td><td>Aktogay, Bozshakol and East Region copper mines; gold in Bozshakol concentrate</td><td>Nova Resources BV, 100%</td><td><a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">USGS, 2023</a></td></tr><tr><td>Kazakhmys Corp.</td><td>Zhezkazgan, Balkhash and Karaganda copper complexes, Zhaisan mine</td><td>Not given</td><td><a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">USGS, 2023</a></td></tr><tr><td>Kazzinc</td><td>Ridder, Altay and Ust-Kamenogorsk complexes; Vasilkovsky gold mine</td><td>Glencore 69.7%, Tau-Ken Samruk 29.82%</td><td><a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">USGS, 2023</a></td></tr><tr><td>Aktyubinskaya Mednaya Kompaniya</td><td>Copper mines in Aqtobe Province</td><td>KM Kazakh Mining 90%, Integro Global Investment 10%, from 2024</td><td><a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">USGS, 2024</a></td></tr><tr><td>Irkaz Metal Corp.</td><td>Borly copper complex</td><td>Kavand Nahan Zamin (Iran)</td><td><a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">USGS, 2024</a></td></tr><tr><td>Central Asia Metals</td><td>Kounrad copper from waste dumps</td><td>London-listed parent</td><td><a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">CAML</a></td></tr><tr><td>AK Altynalmas</td><td>Akbakay, Pustynnoye, Aksu, Zholymbet and Bestobe gold</td><td>Gouden Reserves B.V. 59.97%, other private owners 40.03%</td><td><a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">USGS, 2023</a></td></tr><tr><td>Solidcore Resources (formerly Polymetal International)</td><td>Kyzyl (Bakyrchik) and Varvara gold, Varvara copper concentrate</td><td>Parent company, 100%; shareholders not given</td><td><a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">USGS, 2023</a></td></tr><tr><td>Zijin RG Gold</td><td>Raygorodok gold, Akmola Region</td><td>Zijin Mining involved; stake not stated</td><td><a href="https://invest.gov.kz/media-center/press-releases/v-akmolinskoy-oblasti-nachalas-realizatsiya-proekta-stroitelstva-novoy-zolotoizvlekatelnoy-fabriki-z/">Kazakh Invest</a></td></tr><tr><td>Eastern Gold</td><td>Kokpety gold dore plant, Abay Province</td><td>Altyn Samruk Qazakhstan, 100%</td><td><a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">USGS, 2024</a></td></tr><tr><td>JSC FIK Alel</td><td>Suzdal gold mine</td><td>Nord Gold N.V.</td><td><a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">USGS, 2023</a></td></tr></tbody></table>
<h2>A private sector with a state stake</h2>
<p>Unlike uranium, where the state-controlled Kazatomprom holds a stake in every mining asset, copper and gold are mostly in private hands. The state's main holding is through Tau-Ken Samruk, the national mining company owned by the sovereign wealth fund Samruk-Kazyna, which holds 29.82 per cent of Kazzinc alongside Glencore's 69.7 per cent and owns 100 per cent of the Tau-Ken Altyn gold refinery, with an estimated capacity of 52,000 kilograms a year, <a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">the USGS table shows</a>. JSC Altyn Samruk Qazakhstan owned 100 per cent of Eastern Gold, which completed the Kokpety dore plant in 2024, <a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">the survey says</a>.</p>
<p>The two largest copper groups are privately held. KAZ Minerals is recorded as 100 per cent owned by Nova Resources BV, with estimated mine capacity of 203,000 tonnes of contained copper at Aktogay and 102,000 tonnes at Bozshakol, and Kazakhmys Corp. owns the Zhezkazgan, Balkhash and Karaganda mining complexes, <a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">the table shows</a>. A separate entity, Kazakhmys Smelting LLP, runs the Balkhash and Zhezkazgan smelting and refining plants, with a combined estimated capacity of 420,000 tonnes of copper a year. The table names the owners of neither.</p>
<h2>Foreign owners and what changed</h2>
<p>Foreign groups hold several of the gold assets and some copper. Glencore controls Kazzinc, which owns the Vasilkovsky gold mine through JSC Altyntau-Kokshetau; Gouden Reserves B.V. holds 59.97 per cent of Altynalmas; and the Suzdal mine operator, JSC FIK Alel, is listed under Nord Gold N.V., <a href="https://pubs.usgs.gov/myb/vol3/2023/myb3-2023-kazakhstan.xlsx">the table says</a>. Zijin RG Gold has begun building a second plant at Raygorodok, with investment of more than $600 million, which would lift annual output from 6 tonnes to more than 12 tonnes of dore, <a href="https://invest.gov.kz/media-center/press-releases/v-akmolinskoy-oblasti-nachalas-realizatsiya-proekta-stroitelstva-novoy-zolotoizvlekatelnoy-fabriki-z/">Kazakh Invest said</a> on 7 September; the release says the project brings in Zijin Mining but does not give its shareholding.</p>
<p>Two owners changed in 2024. That year 90 per cent of Aktyubinskaya Mednaya Kompaniya, previously a subsidiary of Russian Copper Co., was acquired by KM Kazakh Mining Co. Ltd., with the remaining 10 per cent held by Integro Global Investment B.V., and Polymetal International, which sold its Russian assets, changed its name to Solidcore Resources as a result of US sanctions, <a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">the USGS says</a>. An Iranian company, Kavand Nahan Zamin, owns Irkaz Metal Corp., which started production at the Borly copper deposit in 2022, according to the <a href="https://www.usgs.gov/centers/national-minerals-information-center/kazakhstan">same review</a>.</p>
<h2>What the records do not show</h2>
<p>The USGS records the immediate parent, not the ultimate owner. The table does not name who stands behind Nova Resources, Gouden Reserves or Kazakhmys, and gives no shareholder register for Solidcore. It also contains at least one evident error: by ditto mark it attributes the Aktogay and Bozshakol concentrators to Kazzinc, while its mine rows attribute both mines to KAZ Minerals; this piece follows the mine rows. The owners recorded here will be checked against Kazakhstan's company registry and companies' own disclosures in the next update. The third part of the series covers Uzbekistan.</p><p><a href="https://corridorminerals.com/news/who-owns-kazakhstan-copper-gold-producers-owners">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>AzerGold plans $7.8m of exploration at Uzbekistan&#x27;s Akba gold deposit</title><link>https://corridorminerals.com/news/azergold-akba-gold-deposit-uzbekistan-exploration-2028-decision</link><guid isPermaLink="true">https://corridorminerals.com/news/azergold-akba-gold-deposit-uzbekistan-exploration-2028-decision</guid><pubDate>Tue, 27 Oct 2026 00:00:00 +0000</pubDate><description>Later stages are put at no less than $100 million, with a final decision due in 2028, its chairman told investors; no resource figure is given.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/azergold-akba-gold-deposit-uzbekistan-exploration-2028-decision.jpg?v=e099f262" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kashkadarya gold, AzerGold plans $7.8m of exploration at Akba</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/azergold-akba-gold-deposit-uzbekistan-exploration-2028-decision.jpg?v=e099f262" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/azergold-akba-gold-deposit-uzbekistan-exploration-2028-decision.jpg?v=e099f262" length="123202" type="image/jpeg"/><content:encoded><![CDATA[<p>Azerbaijan's AzerGold plans to spend $7.8 million on exploration at the Akba gold deposit in Uzbekistan's Kashkadarya region and to take a final investment decision in 2028, its chairman told foreign investors on 21 October, <a href="https://en.apa.az/energy-and-industry/zakir-ibrahimov-outlines-prospects-for-development-of-akba-gold-deposit-at-uzbek-presidents-meeting-with-investors-531785">APA reported</a>.</p>
<p>Zakir Ibrahimov, Chairman of the Board of AzerGold CJSC, put the later stages of preparing the deposit for mining at no less than $100 million. The $7.8 million is for preparatory and additional geological exploration, and he spoke at a meeting of foreign investors held during President Shavkat Mirziyoyev's working visit to the region.</p>
<p>The president's press service confirmed the project in outline. Its <a href="https://president.uz/ru/lists/view/9760">readout of the visit</a>, published in Russian, says a gold mining project in cooperation with Azerbaijan is starting in Kitab district, and records a ceremony at which 69 projects were commissioned and construction of 92 more began. It does not name the deposit, and APA's account places Akba only in Kashkadarya region, without a district. <a href="https://www.trend.az/casia/uzbekistan/4237493.html">Trend News Agency</a>, citing the press service, reported the launch the same day and placed the project in Kitab district.</p>
<p>Mirziyoyev said 20 trillion soums had been directed to the region over the past five years and $7 billion of foreign investment attracted, the readout says. He thanked foreign partners and investors for their investment in the region, and their proposals were heard.</p>
<h2>What is published, and what is not</h2>
<p>The figures are preliminary. AzerGold's estimates of investment, production indicators and employment, which it puts at up to 200 new jobs, will be refined on the results of additional geological exploration and a mineral resource assessment, followed by technical and economic analysis and project design, APA reports. The report gives no resource, reserve, grade, production rate or ownership split for Akba, so the size of the deposit cannot yet be stated.</p>
<p>Ibrahimov also presented AzerGold Uzbekistan, a limited liability company with foreign investment that the report describes as AzerGold's first foreign subsidiary, established in Uzbekistan. The report does not say which company holds the rights to Akba.</p>
<h2>A July agreement and a venture near Navoi</h2>
<p>APA's report also describes a wider exploration tie-up. On 17 July 2026 AzerGold, Uzbekgeologorazvedka JSC and the Azerbaijan-Uzbekistan Investment Company signed a cooperation document on joint geological exploration in promising mineral areas of Uzbekistan. A joint venture is being set up to explore areas between the cities of Navoi and Nurata, and the parties are discussing the joint exploration and development of other promising deposits in Azerbaijan and Uzbekistan. Neither APA's report nor the presidential readout gives a budget or shareholding for the venture.</p>
<p>The Uzbek project gives AzerGold a named deposit, a first-stage budget and a decision date in Central Asia. At home, AzerGold's exports rose 22 per cent to $180.6 million in January to August, <a href="https://corridorminerals.com/news/azerbaijan-gold-exports-switzerland-rise-29-percent-january-august-2026">Corridor Minerals reported</a>.</p>
<h2>Kashkadarya's wider plan</h2>
<p>A second readout, dated 22 October, sets out the president's industrial aims for the region. To ensure sustainable growth, the region must produce more finished goods with high added value, and its gas and mineral reserves and energy resources must serve that aim, <a href="https://president.uz/ru/lists/view/9766">the readout</a> says. Officials were told to prepare a three-year programme of projects worth $20 billion that would create 50,000 jobs, and the meeting reviewed projects including an expansion of capacity at the Dekhkanabad potash plant. The readout does not mention gold.</p>
<p>Akba would bring an Azerbaijani company into Uzbek gold mining alongside the public-sector Navoi Mining and Metallurgical Company, whose conveyor work at the Muruntau pit was <a href="https://corridorminerals.com/news/nmmc-muruntau-conveyor-lines-investor-call-strategy-2035">reported here in October</a>.</p>
<p>The next steps in AzerGold's account are the additional exploration and the resource assessment, which are to set the investment, output and job figures, and then the final investment decision in 2028. The presidential readout says the project is starting; neither document gives a timetable for the exploration work.</p><p><a href="https://corridorminerals.com/news/azergold-akba-gold-deposit-uzbekistan-exploration-2028-decision">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan adds 157 tonnes of gold and 262 million tonnes of iron ore</title><link>https://corridorminerals.com/news/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions</guid><pubDate>Mon, 26 Oct 2026 00:00:00 +0000</pubDate><description>The Ministry of Industry and Construction counts 54 new deposits for 2024 and 2025 and smaller resource and reserve additions of copper, zinc and lead.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions.jpg?v=994f21af" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan resources, Kazakhstan adds 157 t of gold to resources and reserves</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions.jpg?v=994f21af" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions.jpg?v=994f21af" length="133840" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan registered 54 new deposits in 2024 and 2025 and added 157.2 tonnes of gold and 262.2 million tonnes of iron ore to resources and reserves, <a href="https://primeminister.kz/ru/news/reviews/poslanie-prezidenta-za-dva-goda-v-kazahstane-otkryto-54-novyh-mestorozhdeniya-31833">Ministry of Industry and Construction figures</a> published on 2 September show.</p>
<p>The government framed the data as part of its work on instructions in the President's annual addresses, which include raising the efficiency of geological exploration. The registrations were 35 deposits in 2024, of which 23 were solid minerals, six hydrocarbons and six groundwater, and 19 in 2025, of which 17 were solid minerals, one hydrocarbon and one groundwater, <a href="https://primeminister.kz/ru/news/reviews/poslanie-prezidenta-za-dva-goda-v-kazahstane-otkryto-54-novyh-mestorozhdeniya-31833">the same page shows</a>.</p>
<h2>What was added</h2>
<p>The <a href="https://primeminister.kz/ru/news/reviews/poslanie-prezidenta-za-dva-goda-v-kazahstane-otkryto-54-novyh-mestorozhdeniya-31833">ministry's list</a> of growth in resources and reserves for 2024 and 2025 covers gold at 157,210.6 kilograms and silver at 9,432 tonnes. Base and ferrous metals are copper at 122.7 thousand tonnes, zinc at 171.9 thousand tonnes, lead at 114.8 thousand tonnes, chromium ores at 927 thousand tonnes, iron ore at 262,209.4 thousand tonnes, manganese at 11.052 thousand tonnes and phosphorite ores at 1,338.32 thousand tonnes. Hydrocarbons are 199 million tonnes of oil and 22 billion cubic metres of gas. The <a href="https://timesca.com/kazakhstan-mineral-deposits-54-new-sites-state-register/">Times of Central Asia</a> reported the same figures on 3 September, describing them as the result of exploration and reassessment.</p>
<p>The list does not say how much of each figure is classified as reserves and how much as resources, and it names no deposits, grades or mine lives. Without that split the numbers show direction rather than bankable inventory.</p>
<h2>Scale against production</h2>
<p>Gold is the clearest comparison. The Times of Central Asia reported in June, citing the ministry, that <a href="https://timesca.com/kazakhstan-registers-five-new-gold-deposits-as-jewelers-seek-raw-materials/">refined gold output in 2025 was 71.2 tonnes</a> and that the state balance sheet lists 374 gold deposits with reserves of 2,369 tonnes. On those figures the two-year addition of 157.2 tonnes is equal to about 2.2 years of 2025 refined output, and about 6.6 per cent of the stated balance of 2,369 tonnes, on simple division. The June report said five new deposits with about 98 tonnes of gold reserves were added in 2025 alone.</p>
<p>Copper looks thinner. The 122.7 thousand tonnes added over two years compares with the 232,000 tonnes of cathode copper that <a href="https://interfax.com/newsroom/top-stories/118561/">Interfax reported</a> was produced in the first half of 2026, so the two-year addition is about half of one half-year's refined output. The measures are not identical, one being growth in resources and reserves and the other refined metal, and the figures are not net of depletion, so the comparison indicates scale only. It matters because the government is backing new smelting capacity, including a 300,000-tonne a year smelter at Balkhash, that will need concentrate.</p>
<h2>Licences, funding and the royalty timetable</h2>
<p>The <a href="https://primeminister.kz/ru/news/reviews/poslanie-prezidenta-za-dva-goda-v-kazahstane-otkryto-54-novyh-mestorozhdeniya-31833">same government page</a> reports that the ministry issued 96 licences for solid-mineral extraction over three years, 33 in 2024, 32 in 2025 and 31 in 2026, and that seven subsoil-use contracts moved from exploration to extraction, three in 2024, two in 2025 and two in 2026. State budget funding for geological work totalled 62.4 billion tenge for 2024 to 2026. At the Astana Mining and Metallurgy congress in June, Prime Minister Olzhas Bektenov said, according to the <a href="https://primeminister.kz/en/news/olzas-bektenov-prinial-ucastie-v-astana-mining-metallurgy-2026-pravitelstvo-realizuet-poruceniia-prezidenta-po-razvitiiu-produkcii-vysokogo-peredela-v-gmk-31506">government's summary</a>, that the state would allocate about $470 million for geological exploration in 2026 to 2028.</p>
<p>Fiscal terms for new discoveries are also in flux. On 17 September, participants in a meeting of the Tax Code implementation project office <a href="https://primeminister.kz/ru/news/vvedenie-royalti-na-tverdye-poleznye-iskopaemye-perenesut-na-2029-god-31896">backed moving the start of a royalty on solid minerals</a> from 1 January 2027 to 1 January 2029. The readout says the royalty applies to minerals extracted under licences issued after 31 December 2026 in areas where subsoil-use rights had not previously been granted. It does not give rates, and the ministry said further work is needed on the tax base for technogenic deposits, rates for new licences and project capital intensity.</p><p><a href="https://corridorminerals.com/news/kazakhstan-54-new-deposits-gold-iron-ore-resource-additions">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Solidcore&#x27;s mining tax rises 122 per cent as Kounrad&#x27;s falls to $0.8m</title><link>https://corridorminerals.com/news/kazakhstan-mining-tax-changes-2026-met-royalty-explained</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-mining-tax-changes-2026-met-royalty-explained</guid><pubDate>Mon, 26 Oct 2026 00:00:00 +0000</pubDate><description>Solidcore attributes its rise to a progressive extraction tax and higher gold prices, and a government meeting backed delaying a new royalty to 2029.</description><category>Mining</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-mining-tax-changes-2026-met-royalty-explained.jpg?v=d2202078" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan mining tax, Kazakhstan mining tax: three changes in 2026</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-mining-tax-changes-2026-met-royalty-explained.jpg?v=d2202078" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-mining-tax-changes-2026-met-royalty-explained.jpg?v=d2202078" length="131569" type="image/jpeg"/><content:encoded><![CDATA[<p>Solidcore Resources' mining tax expense rose 122 per cent in the first half of 2026, its <a href="https://menafn.com/1111636275/Half-Year-Report-For-The-Six-Months-Ended-30-June-2026">half-year report</a> shows. The mineral extraction tax (MET) charge at Central Asia Metals' Kounrad copper operation fell to $0.8 million, its <a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">interim results</a> show.</p>
<p>Three changes to Kazakhstan's mineral taxes are now visible in company filings and government statements. Solidcore attributes the rise to a progressive MET introduced in January and to higher gold prices, and Central Asia Metals attributes the Kounrad fall, from $5.0 million, to a rate cut for man-made mineral formations. On 17 September, <a href="https://primeminister.kz/ru/news/vvedenie-royalti-na-tverdye-poleznye-iskopaemye-perenesut-na-2029-god-31896">a government meeting backed</a> moving the start of a new royalty on solid minerals from 1 January 2027 to 1 January 2029.</p>
<h2>Solidcore: a progressive extraction tax</h2>
<p>The <a href="https://menafn.com/1111636275/Half-Year-Report-For-The-Six-Months-Ended-30-June-2026">half-year report</a>, released on 8 September, puts mining tax expense at $142 million, against $64 million a year earlier, and says the rate in the half stood at 11 per cent against 7.5 per cent in the first half of 2025. Cash operating costs rose 38 per cent to $353 million, so mining tax made up about 40 per cent of the total, on Drill Core's arithmetic. The report books the tax in cost of sales and reports income tax separately, at 26 per cent for the period. It does not name the statute behind the extraction tax or set out its rate schedule.</p>
<p>In the report's cash-cost bridge, the change in mining tax adds $241 per gold-equivalent ounce to both total cash costs and all-in sustaining costs, which the company reports at $1,435 and $1,912 per ounce. On Drill Core's calculation, the tax change accounts for about 17 per cent of the first figure and 13 per cent of the second.</p>
<h2>Kounrad: a lower rate for man-made formations</h2>
<p>Central Asia Metals' <a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">interim results</a>, published on 26 August, say MET charges at Kounrad were $0.8 million in the first half, against $5.0 million a year earlier. The company attributes the fall to legislation cutting the applicable MET rate for man-made mineral formations, including Kounrad, to 0.855 per cent with effect from 1 January 2026. The filing does not name the law.</p>
<p>Over the same period Kounrad's revenue rose to $80.8 million from $53.0 million, according to the <a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">filing</a>. On Drill Core's subtraction, MET fell by $4.2 million while revenue rose by $27.8 million, and MET went from about 9.4 per cent of revenue to about 1.0 per cent. Kounrad's EBITDA was $68.0 million at a margin of 84 per cent, against $38.3 million and 72 per cent a year earlier. The company also said new reserve and resource reports show that the dumps contain enough recoverable copper to support operations until at least 2034.</p>
<h2>The royalty that keeps slipping</h2>
<p>A royalty on solid minerals has been planned for several years. The Times of Central Asia <a href="https://timesca.com/why-kazakhstan-wants-to-change-subsoil-user-taxation/">reported in December 2024</a> that royalties, which would calculate taxes on the volume of products sold or profits earned, would apply only to licences issued from 1 January 2026, under a new Tax Code then expected to take effect that year. The government's <a href="https://primeminister.kz/ru/news/vvedenie-royalti-na-tverdye-poleznye-iskopaemye-perenesut-na-2029-god-31896">readout of 17 September</a> says the Tax Code now provides for royalties from 1 January 2027. It says the 28th session of the Tax Code project office, chaired by Deputy Prime Minister and Minister of National Economy Serik Zhumangarin, backed moving the start to 1 January 2029 after the Ministry of Industry and Construction proposed a postponement.</p>
<p>The readout says the royalty covers mineral raw materials and solid minerals, including processed ones, extracted under licences issued after 31 December 2026 in areas where subsoil-use rights had not previously been granted. It lists unresolved points: the tax base for technogenic mineral formations, administration, and rates that reflect the specifics of new licences, project capital intensity and the profitability of associated components. These need inter-agency agreement and testing on enterprises' financial and economic models, it says. It gives no rates.</p>
<p>The <a href="https://timesca.com/kazakhstan-mining-royalty-system-delayed-2029/">Times of Central Asia</a> reported on 18 September that the Tax Code sets a rate of 13 per cent for ore, 10 per cent for concentrate and 7 per cent for metals, so a miner selling raw ore would face almost twice the royalty rate of a company producing metal. An existing copper mine would continue paying MET, it said, which is charged on minerals extracted, while the royalty would be linked to the sale of the mineral product. The outlet also cited 2024 State Revenue Committee estimates that rates similar to those used in Western Australia could reduce annual budget revenue by about 270 billion tenge, and that extending royalties to all subsoil users could cause losses of about 450 billion tenge. It said those estimates do not apply directly to the much narrower reform now planned.</p>
<p>Budget revenue was already a concern in 2024. Zhanybek Nurzhanov, deputy chairman of the State Revenue Committee, <a href="https://timesca.com/why-kazakhstan-wants-to-change-subsoil-user-taxation/">was quoted</a> as saying: "We can switch to royalties only if there are no losses for the budget."</p>
<p>On Drill Core's reading, the readout's technogenic formations and the <a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">man-made formations</a> in Central Asia Metals' filing appear to describe the same category of material. Neither document says how a royalty would treat dumps such as Kounrad's, which now carry the 0.855 per cent MET rate. Under <a href="https://primeminister.kz/ru/news/vvedenie-royalti-na-tverdye-poleznye-iskopaemye-perenesut-na-2029-god-31896">the scope the readout describes</a>, the royalty would reach an existing operation only through a new licence in a previously unlicensed area.</p><p><a href="https://corridorminerals.com/news/kazakhstan-mining-tax-changes-2026-met-royalty-explained">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>ERG&#x27;s Bolashak chrome mine reaches first million tonnes after hydrogen halt</title><link>https://corridorminerals.com/news/erg-bolashak-chrome-mine-first-million-tonnes-kazchrome</link><guid isPermaLink="true">https://corridorminerals.com/news/erg-bolashak-chrome-mine-first-million-tonnes-kazchrome</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>The Kazchrome mine in Aktobe region is designed for 7.5 million tonnes of ore a year; ERG is spending more than KZT 1 trillion to get it there.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/erg-bolashak-chrome-mine-first-million-tonnes-kazchrome.jpg?v=39a553af" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, chrome ore, Bolashak mine reaches its first million tonnes</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erg-bolashak-chrome-mine-first-million-tonnes-kazchrome.jpg?v=39a553af" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erg-bolashak-chrome-mine-first-million-tonnes-kazchrome.jpg?v=39a553af" length="115646" type="image/jpeg"/><content:encoded><![CDATA[<p>Bolashak, the underground chrome ore mine at the Donskoy mining and processing plant in Kazakhstan's Aktobe region, has produced its first million tonnes of ore since its launch, <a class="hub-link" href="https://corridorminerals.com/eurasian-resources-group">Eurasian Resources Group</a> (ERG) said in a <a href="https://www.erg.kz/ru/news/show/3874">statement on 30 September 2026</a>.</p>
<p>ERG said it took less than two years to reach the mark, but the figure is small against what the mine is built for. Bolashak has a design capacity of 7.5 million tonnes of chrome ore a year, and ERG is investing more than KZT 1 trillion in building it and bringing it to that capacity, <a href="https://www.erg.kz/ru/news/show/3874">the statement says</a>. A million tonnes in just under two years means an average of a little over half a million tonnes a year, well under a tenth of the design rate, on Headframe's arithmetic from those two figures. The statement does not give a current monthly rate or a date for reaching full capacity.</p>
<p>The mine belongs to TNC Kazchrome JSC, which ERG describes as part of the group; the statement gives no percentage holding. It matters beyond Khromtau because it feeds the group's ferroalloy smelters. ERG's <a href="https://www.erg.kz/en/enterprises/ao-transnacionalnaia-kompaniia-kazxrom">page on Kazchrome</a> says the Donskoy deposits are the main raw material base for ferroalloy production at the Aktobe and Aksu plants, and that Bolashak, launched at the end of 2024 as the second phase of the mine named after the 10th anniversary of Kazakhstan's independence, should allow the country to raise output to up to 2 million tonnes of ferroalloys a year.</p>
<h2>A three-month stoppage</h2>
<p>The ramp-up has not been smooth. Four months after the launch, work at the mine was suspended because hydrogen had appeared in the workings, <a href="https://www.erg.kz/ru/news/show/3874">the statement says</a>. The mine team, Kazchrome specialists and outside research organisations spent three months on measures that allowed production to restart safely, the company said. It did not say how much ore was lost during the stoppage, where the gas came from or what the measures were.</p>
<p>Since May 2026, new sections of the mine have been worked by sublevel caving, a bulk underground method, with self-propelled equipment, <a href="https://www.erg.kz/ru/news/show/3874">the statement says</a>. ERG said the mine had been equipped from the start with drill rigs capable of automatic drilling under remote control from the surface and with a fully automated hoist.</p>
<p>Yerzhan Abdulabekov, general director of Kazchrome, said the task now was to make each further million tonnes more stable, safer and more efficient, and that the company was changing the mining method, raising mechanisation and training staff, because the mine's output affected the reliability of the whole Kazchrome chain from the Donskoy plant to the ferroalloy smelters, <a href="https://www.erg.kz/ru/news/show/3874">the Russian-language statement says</a>. Kudrat Shamiyev, chief executive of ERG in Kazakhstan, linked the mine's development to jobs and the long-term future of Khromtau, the company said. ERG also posted the news on its <a href="https://t.me/ergkaz/1983">official Telegram channel</a> on 1 October.</p>
<h2>Faster than the older shafts</h2>
<p>ERG compared the pace with the plant's earlier underground mines. About 40 years ago, the Molodezhnaya mine took four years to produce its first million tonnes, and the mine named after the 10th anniversary of independence took five years, <a href="https://www.erg.kz/ru/news/show/3874">the statement says</a>. The comparison says nothing about ore grade or about how much of each mine's output went to the smelters.</p>
<p>For scale, ERG's <a href="https://www.erg.kz/en/enterprises/ao-transnacionalnaia-kompaniia-kazxrom">Kazchrome page</a> lists 4.828 million tonnes of ore mined in 2022, the latest year it shows, without a split by mine. On the same page the Aksu ferroalloy plant is described as producing more than 1 million tonnes of products a year and the Aktobe ferroalloy plant more than 700 thousand tonnes of ferroalloys a year. A further unit, Zhairem manganese operations, sends more than 100 thousand tonnes of manganese concentrate a year to Kazchrome's ferroalloy plants, the page says.</p>
<h2>What the release does not say</h2>
<ul>
<li>The chromium oxide grade of the ore mined at Bolashak, or the recovery at the concentrator.</li>
<li>How much of the more than KZT 1 trillion budget has been spent, and how it is financed.</li>
<li>A date for reaching the design capacity of 7.5 million tonnes a year, or an output target for 2026.</li>
<li>Whether the hydrogen issue affects other parts of the deposit.</li>
</ul>
<p>The company's figures for full-year 2026 output, which ERG has not yet scheduled, are the next document that would show whether the ramp-up has reached a steady rate.</p><p><a href="https://corridorminerals.com/news/erg-bolashak-chrome-mine-first-million-tonnes-kazchrome">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Indian-backed Altyn-Tor gold plant starts test runs in Kyrgyzstan</title><link>https://corridorminerals.com/news/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan</link><guid isPermaLink="true">https://corridorminerals.com/news/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>First metal was planned for December 2024; investment had reached $34.2 million by August, above the $25 million minimum cited, and no capacity is given.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan.jpg?v=f5b8a628" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Altyn-Tor gold, Altyn-Tor gold plant begins test operations</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan.jpg?v=f5b8a628" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan.jpg?v=f5b8a628" length="121148" type="image/jpeg"/><content:encoded><![CDATA[<p>A gold processing plant developed by Avelum Partner at the Altyn-Tor section of the Solton-Sary deposit in Kyrgyzstan's Naryn region began test operations on 12 September, the <a href="https://timesca.com/indian-gold-mining-project-kyrgyzstan/">Times of Central Asia reported</a> on 14 September.</p>
<p>India's Deccan Gold Mines, which holds a controlling stake in Avelum Partner, describes the project as the first Indian investment in Kyrgyzstan's gold mining sector to reach this stage, the report says. The state-owned miner Kyrgyzaltyn holds the other part of the partnership.</p>
<h2>Ownership and scope</h2>
<p>Kyrgyzaltyn's own <a href="https://ru.kyrgyzaltyn.kg/branch/info/15">project page</a> says the company and Avelum Partner signed a simple partnership agreement on 20 December 2021, with Kyrgyzaltyn holding 35 per cent and Avelum Partner 65 per cent. The agreement covers integrated development of the Altyn-Tor plot of the Solton-Sary deposit, and the work involves processing technogenic formations, meaning existing tailings storage facilities and mining waste dumps. The Times of Central Asia reports that, under the agreement, commercial-grade gold must be delivered to Kyrgyzaltyn and the Indian partner cannot export it independently. The page does not give the plant's capacity, the investment amount or job numbers.</p>
<p>Investment had reached $34.2 million by the end of August 2026, according to the <a href="https://timesca.com/indian-gold-mining-project-kyrgyzstan/">same report</a>. Kyrgyzaltyn said that at planned capacity the plant should create at least 400 jobs, more than 95 per cent of them for Kyrgyz citizens.</p>
<h2>A later start than planned</h2>
<p>The timetable has moved. When the plant's foundation was laid in July 2024, <a href="https://en.archive.kabar.kg/news/indian-investors-invest-in-construction-of-processing-plant-at-solton-sary-gold-field">Kabar reported</a> that the investment would be at least $25 million, with more than $8 million already spent, and that first commercial metal was planned for December 2024. Test operations in September 2026 therefore came about 21 months after that date, and the $34.2 million invested is about 37 per cent above the $25 million minimum cited in 2024, on simple division. Kabar's account gave the same job figures, at least 400 posts with more than 95 per cent for Kyrgyz citizens, and described the gold sources as the tailings dump, substandard overburden ore and open-pit reserves.</p>
<h2>The deposit and its neighbours</h2>
<p>Solton-Sary lies about 355 kilometres from Bishkek at an altitude of 3,500 to 3,600 metres. Kyrgyzaltyn's <a href="https://en.kyrgyzaltyn.kg/branch/info/3">deposit page</a> says the field has three areas, Buchuk, Ak-Tash and Altyn-Tor, with total probable gold reserves of about 20 tonnes. Test production began at Altyn-Tor in 1994. The open pit was placed on care and maintenance in 1997 because falling gold prices and low end-to-end recovery made it unviable, and mining resumed in early 2003 as prices and recovery improved. The existing gravity plant has a capacity of 100 thousand tonnes of ore a year and produces more than 100 kilograms of gold a year, the company says.</p>
<p>A second project operates next door. <a href="https://timesca.com/indian-gold-mining-project-kyrgyzstan/">The Times of Central Asia reports</a> that the Kyrgyz-Chinese company Zhong Ji Mining, which is developing the Buchuk section, launched a processing plant in test mode in October 2024 and produced 876.3 kilograms of gold in 2025. It cites explored reserves at Buchuk of about 12 tonnes and a possible further 22 tonnes of resources. The same report recalls that residents of the Naryn region protested against Zhong Ji Mining's operations in 2019, linking mining to livestock deaths and fearing contamination, and that the protest turned into clashes on 5 August 2019, after which authorities suspended operations.</p>
<p>The <a href="https://timesca.com/indian-gold-mining-project-kyrgyzstan/">report</a> also places the project against the wider sector. Kumtor, Kyrgyzstan's largest gold mine, was taken under state control from Centerra Gold in 2021, and a 2022 settlement transferred ownership to Kyrgyzaltyn. The capacity of the new Altyn-Tor plant is not given in the Kyrgyzaltyn page, the Kabar report or the Times of Central Asia report, so production figures from the test phase will be the first indication of its scale.</p><p><a href="https://corridorminerals.com/news/altyn-tor-solton-sary-gold-plant-test-operations-kyrgyzstan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>KAZ Minerals&#x27; own mines could supply about 365,000 tonnes of copper a year</title><link>https://corridorminerals.com/news/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply</link><guid isPermaLink="true">https://corridorminerals.com/news/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>That is twice the 182,400 tonnes of copper in first-half concentrate; the Aktogay smelter is designed to make 300,000 tonnes of cathode a year.</description><category>Mining</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply.jpg?v=711e3f4f" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh copper, What KAZ Minerals&#x27; mines can feed Aktogay</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply.jpg?v=711e3f4f" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply.jpg?v=711e3f4f" length="115715" type="image/jpeg"/><content:encoded><![CDATA[<p>KAZ Minerals Group is to build a copper smelter at Aktogay, in Kazakhstan's Abay region, designed to make 300,000 tonnes of cathode copper a year from its own concentrate, with first cathode scheduled for 2030, <a href="https://www.trend.az/casia/kazakhstan/4237157.html">Trend News Agency reported</a> on 20 October.</p>
<p>The report covered the ceremony at which President Kassym-Jomart Tokayev, joining by video link, launched the $1.8 billion project. KAZ Minerals' production reports show how much copper its mines now put into concentrate, and where it comes from.</p>
<p>China's NFC is the engineering partner, and the plant is expected to create more than 1,000 jobs and to produce metallic gold, silver and sulphuric acid as by-products, Trend reported, citing the presidential press service. Once the plant is commissioned, Kazakhstan will enter the world's top 10 producers of high-quality refined copper, Trend reported, and it quoted Tokayev as saying: "This will fully meet the needs of the domestic market." The report gives $1.8 billion as the project's value and says nothing about how it will be financed.</p>
<h2>Where the copper would come from</h2>
<p>KAZ Minerals produced 179,800 tonnes of copper in the six months to 30 June 2026, against 184,000 tonnes a year earlier, its <a href="https://www.kazminerals.com/app/uploads/2026/08/KAZ-Minerals_-Q2-2026-Production-Report_ENG.pdf">production report</a> of 11 August shows. That figure counts payable metal in concentrate plus cathode made from Aktogay's oxide ore, 5,700 tonnes in the half, which comes from ore sent to leach pads rather than through a concentrate. The copper contained in concentrate, which is what a smelter takes in, came to 182,400 tonnes across the group's four operations, on the Data Desk's addition of the report's figures.</p>
<table><thead><tr><th>Operation, first half of 2026</th><th>Copper grade processed</th><th>Copper in concentrate, tonnes</th><th>Copper production, tonnes</th><th>Gold production, ounces</th></tr></thead><tbody><tr><td>Aktogay, open pit</td><td>0.41%</td><td>113,700</td><td>114,300</td><td>1,800</td></tr><tr><td>Bozshakol, open pit</td><td>0.37%</td><td>46,800</td><td>44,700</td><td>37,200</td></tr><tr><td>East Region, three underground mines</td><td>1.90%</td><td>19,100</td><td>18,100</td><td>6,200</td></tr><tr><td>Bozymchak, Kyrgyzstan</td><td>0.62%</td><td>2,800</td><td>2,700</td><td>12,700</td></tr><tr><td>Group</td><td></td><td>182,400 (calculated)</td><td>179,800</td><td>57,900</td></tr></tbody></table>
<p>Source: KAZ Minerals production report for the six months to 30 June 2026. Copper and gold production are payable metal; Aktogay's copper production includes its oxide cathode. The group's copper in concentrate is the sum of the four operations.</p>
<h2>The arithmetic against 300,000 tonnes</h2>
<p>At the first-half rate, the group's operations would put about 365,000 tonnes of copper a year into concentrate, on simple doubling of the six-month total, against the plant's design output of 300,000 tonnes of cathode. Aktogay's concentrate alone would hold about 227,000 tonnes a year at the same rate, roughly three-quarters of that design output, so on these figures the plant would also need concentrate from Bozshakol or the East Region, or higher output at Aktogay. A smelter recovers less than all the copper it is fed, and neither Trend's report nor the production report gives a design recovery, so this compares contained copper with cathode capacity; it is not a feed plan.</p>
<p>Doubling also ignores variation between quarters: group copper production was 87,900 tonnes in the first quarter and 91,900 tonnes in the second, the report shows.</p>
<p>The two open pits processed ore grading 0.41 per cent copper at Aktogay and 0.37 per cent at Bozshakol in the first half, against 1.90 per cent at the East Region mines and 0.62 per cent at Bozymchak. Bozshakol accounted for most of the year-on-year fall in copper: its ore extraction dropped to 15.2 million tonnes from 18.2 million and its copper production to 44,700 tonnes from 47,600, a fall of 2,900 tonnes out of the group's 4,200. Aktogay's copper production was 114,300 tonnes against 114,800, and group gold production fell to 57,900 ounces from 62,600. The <a href="https://www.kazminerals.com/q1-2026-production-report/">first-quarter report</a>, published on 14 May, said output fell at Bozshakol in that quarter and that the mine experienced reduced throughput and recoveries as a result of changes in ore characteristics.</p>
<h2>Where the concentrate goes now</h2>
<p>The reports do not name buyers or smelters. They do show cathode already in the group's sales chain: first-half copper sales of 172,900 tonnes were 4 per cent below production, which the report attributes to shipment timing differences and increased volumes of cathodes in transit and smelter work in progress at the period end, and its definition of sales includes toll-processed metal. Kazakhstan already exports refined copper, as Corridor Minerals' analysis of <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">refined copper shipments</a> has shown; Trend's report says the new complex will process the group's own concentrate.</p>
<p>Trend's report puts the national picture at more than 9,500 deposits, about 160 million tonnes of ore mined and around 3.5 million tonnes of copper concentrate produced each year. KAZ Minerals reports copper content rather than concentrate tonnage, so its share of that concentrate cannot be calculated from its reports. The Aktogay plant is not the only new smelter in preparation: a separate project at Balkhash was <a href="https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review">reviewed by the prime minister in October</a>.</p>
<p>Production figures are KAZ Minerals' own for the six months to 30 June 2026 and 2025, published on 11 August. The group's copper in concentrate, the annual rates and the shares of the design output are the Data Desk's calculations: a sum of the four operations, a simple doubling of six-month figures, and a division by 300,000 tonnes. The next document is the group's third-quarter production report; the first- and second-quarter reports appeared on 14 May and 11 August.</p><p><a href="https://corridorminerals.com/news/aktogay-smelter-explained-kaz-minerals-mine-output-concentrate-supply">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Aluminium of Kazakhstan readies Taunsor bauxite pits for first ore in 2028</title><link>https://corridorminerals.com/news/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028</link><guid isPermaLink="true">https://corridorminerals.com/news/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028</guid><pubDate>Sat, 24 Oct 2026 00:00:00 +0000</pubDate><description>Hearing documents set ceilings of up to 1.5m tonnes a year per section, though approved balance reserves total about 9.5m tonnes across the four areas.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028.jpg?v=3fc023b8" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, bauxite, ERG readies Taunsor bauxite for first ore in 2028</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028.jpg?v=3fc023b8" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028.jpg?v=3fc023b8" length="120405" type="image/jpeg"/><content:encoded><![CDATA[<p>Aluminium of Kazakhstan JSC, <a class="hub-link" href="https://corridorminerals.com/eurasian-resources-group">ERG</a>'s alumina producer, is preparing to open the Taunsor bauxite deposit in Kostanay region's Kamysty district, with open-pit mining on the first two sections to start in 2028, <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">the mining portal Qazba.kz reported on 30 September</a>, citing public hearing documents.</p>
<p>The plans put section No. 19 at up to 1.5 million tonnes of ore a year and section No. 18, ore body 1, at up to 500 thousand tonnes a year, each for nine years.</p>
<p>The company is ERG's link between ore and metal. ERG's <a href="https://www.erg.kz/en/enterprises/ao-aliuminii-kazaxstana">page on Aluminium of Kazakhstan</a> describes it as the only alumina producer in Kazakhstan, making alumina from bauxite mined in Kostanay and Pavlodar regions at its Pavlodar plant. Mining at Taunsor will be carried out by its Krasnooktyabrsky bauxite mining branch, which works the Krasnooktyabrskoye deposit 70 to 90 km north of Taunsor, <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">Qazba.kz reported</a>.</p>
<p>The timing matters because ERG has said it wants to smelt all of its alumina at home. A planned second phase at Kazakhstan Aluminium Smelter, set out by an ERG executive in September, would add up to 400 thousand tonnes a year of metal capacity from 2028 or 2029, <a href="https://kz.kursiv.media/2026-09-25/svan-erg-postroit-alyuminievyj-zavod-polnogo-cikla-za-pochti-1-mlrd-do-2029-goda/">Kursiv has reported</a>, and a larger smelter needs a secure long-term bauxite supply.</p>
<h2>Five sections, staggered over a decade</h2>
<p>The hearing documents cover preparatory work on five sections before open-pit mining begins: hydrogeological studies, haul roads and stripping of topsoil, <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">Qazba.kz said</a>. Preparation on sections 18 (ore body 1) and 19 is scheduled for 2026 and 2027, and on the other three sections from 2026 to 2031.</p>
<ul>
<li>Section 18, ore body 1: from 2028, nine years, up to 500 thousand tonnes of ore a year.</li>
<li>Section 19: from 2028, nine years, up to 1.5 million tonnes a year.</li>
<li>Section 18, ore body 8: from 2031, nine years, up to 500 thousand tonnes a year.</li>
<li>Section 25: from 2035, 11 years, up to 500 thousand tonnes a year.</li>
<li>Section 20: from 2037, 10 years, up to 529 thousand tonnes a year.</li>
</ul>
<p>The schedule is drawn from the <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">Qazba.kz account</a> of the published mining plans. No mining has previously taken place at Taunsor, and the nearest village, Druzhba, is 18 km away, the portal said.</p>
<h2>The ceilings exceed the reserves</h2>
<p>A 2016 protocol of the State Reserves Commission, cited in the plans, approved balance reserves on sections 18, 19, 20 and 25 at 9,528.8 thousand tonnes of bauxite, of which 9,510.4 thousand tonnes are in category C1 and 18.4 thousand tonnes in C2, with a further 2,915.7 thousand tonnes counted as off-balance, <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">Qazba.kz reported</a>. These are categories under the national classification inherited from the Soviet system, not reserves reported under an international code, and the report gives no bauxite grade.</p>
<p>Multiplying each section's maximum annual rate by its stated life gives about 33.3 million tonnes, more than three times the approved balance reserves, on Headframe's arithmetic from the five figures <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">reported by Qazba.kz</a>. The annual numbers are therefore permitted ceilings for each section, not a production plan. On approved reserves alone, the deposit would supply the combined maximum rate of 2 million tonnes a year from the first two sections for under five years.</p>
<p>Exploration at Taunsor dates from 1957, when the deposit was found, and 25 ore sections were prospected and explored up to 1985, the plans say. Aluminium of Kazakhstan signed an exploration contract with the government in 2005, but the programme was cut back to sections 18, 19, 20 and 25 because much of the deposit lies inside a nature reserve of the same name, <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">the portal reported</a>.</p>
<h2>What the documents do not say</h2>
<ul>
<li>The alumina content and silica ratio of the Taunsor ore, which determine how it can be processed.</li>
<li>Output and remaining reserves at the Krasnooktyabrskoye deposit that Taunsor is meant to supplement.</li>
<li>The capital cost of the new pits.</li>
</ul>
<p>The next step is completion of preparatory work on the first two sections, <a href="https://qazba.kz/dobycha/alyuminij-kazahstana-nachnet-podgotovku-k-osvoeniyu-taunsorskogo-mestorozhdeniya/">scheduled for 2027</a>, ahead of first ore in 2028.</p><p><a href="https://corridorminerals.com/news/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kounrad copper output slips 4% in third quarter as Central Asia Metals holds guidance</title><link>https://corridorminerals.com/news/central-asia-metals-kounrad-copper-q3-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/central-asia-metals-kounrad-copper-q3-2026</guid><pubDate>Fri, 23 Oct 2026 00:00:00 +0000</pubDate><description>The Kazakh dump-leach operation made 3,454 tonnes in the quarter and 9,758 tonnes in nine months, 1% lower than a year earlier, with the 2026 target unchanged.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/central-asia-metals-kounrad-copper-q3-2026.jpg?v=130b050c" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kounrad copper, Kounrad copper slips 4% as guidance holds</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/central-asia-metals-kounrad-copper-q3-2026.jpg?v=130b050c" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/central-asia-metals-kounrad-copper-q3-2026.jpg?v=130b050c" length="116172" type="image/jpeg"/><content:encoded><![CDATA[<p>Kounrad, the copper operation in Kazakhstan run by Central Asia Metals (AIM: CAML), produced 3,454 tonnes of copper in the third quarter, down 4 per cent from 3,615 tonnes a year earlier, according to the company's <a href="https://www.lse.co.uk/rns/CAML/q3-2026-operations-update-hqd1qqxsi1h4w3u.html">Q3 2026 operations update</a>, published on 7 October. Production for the first nine months was 9,758 tonnes, which the company described as only fractionally lower than the 9,833 tonnes of the same period of 2025. Sales were 3,458 tonnes in the quarter and 9,746 tonnes for the nine months, in line with production.</p>
<p>The company said both its operations are on track to meet 2026 guidance, which for copper is 12,000 to 13,000 tonnes. That guidance is unchanged from the level it <a href="https://www.mining.com/?p=1208195">reiterated in June</a>, when the company also said, as Mining.com reported, that it expected a stronger second half at Kounrad because warmer weather should help the dump-leach process.</p>
<h2>What the guidance implies for the fourth quarter</h2>
<p>The nine-month total leaves 2,242 to 3,242 tonnes to be produced in the final quarter for the year to land inside the range, on simple subtraction from the <a href="https://www.lse.co.uk/rns/CAML/q3-2026-operations-update-hqd1qqxsi1h4w3u.html">reported figures</a>. Third-quarter output of 3,454 tonnes is above the top of that quarterly requirement, so the range implies a fourth quarter below the third, or leaves headroom. The third quarter was also about 10 per cent above the first-half quarterly average of 3,152 tonnes, a figure derived from the 6,304 tonnes produced in the first six months, consistent with the stronger second half the company had signalled.</p>
<p>Prices helped the operation. The company said in the <a href="https://www.lse.co.uk/rns/CAML/q3-2026-operations-update-hqd1qqxsi1h4w3u.html">update</a> that the average copper price received in the quarter was $14,218 a tonne, 43 per cent higher than a year earlier. It reported zinc at $3,841 a tonne, up 34 per cent on a provisional basis, and lead at $1,859 a tonne, down 5 per cent. It also said 50 per cent of the Sasa mine's payable zinc for 2026 is hedged at an average of $3,011.5 a tonne, which is not reflected in the zinc figure.</p>
<h2>Margins and costs at Kounrad</h2>
<p>The company's <a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">interim results</a>, published on 26 August, give the latest cost detail. Kounrad's first-half EBITDA was $68.0 million, against $38.3 million a year earlier, with a margin of 84 per cent compared with 72 per cent. Its C1 cash cost of copper production rose to $0.91 per pound from $0.79 per pound, which the company attributed mainly to a weaker US dollar against the tenge and inflation-linked payroll increases.</p>
<p>Mineral extraction tax charges fell to $0.8 million from $5.0 million in the first half of 2025. The <a href="https://www.lse.co.uk/rns/CAML/interim-results-for-six-months-ended-30-june-2026-5kd0ycg9uo8727r.html">filing</a> says legislation reduced the applicable rate for man-made mineral formations, including Kounrad, to 0.855 per cent from 1 January 2026. The same document says the new JORC reports show the dumps contain sufficient recoverable copper to support operations until at least 2034, that the solvent extraction and electrowinning plant ran at 99.8 per cent availability, and that a solar plant generated 4.6 million kilowatt-hours, about 18 per cent of the site's power consumption.</p>
<h2>Exploration in Kazakhstan and the wider portfolio</h2>
<p>The <a href="https://www.lse.co.uk/rns/CAML/q3-2026-operations-update-hqd1qqxsi1h4w3u.html">quarterly update</a> also reports drilling at the company's Kazakh exploration licences. A maiden programme of 2,100 metres in seven holes at Yuzhnoe returned copper mineralisation over more than one kilometre of strike length, with a best intersection of 311 metres at 0.22 per cent copper, including 13 metres at 0.52 per cent and 11 metres at 0.52 per cent. At that grade the main intersection is wide rather than rich, and the company has scheduled 3,600 metres of follow-up drilling in 12 holes. At Otyar, 2,200 metres in nine holes returned 9 metres at 140 grams per tonne silver, but the company said widths and grades are limited and ranked the project as a lower priority. A 3,550-metre, 14-hole programme is planned at Shaindy for spring 2027, and about 4,000 metres of drilling is envisaged in the Teniz Basin in 2027.</p>
<p>Elsewhere in the portfolio, the <a href="https://www.lse.co.uk/rns/CAML/q3-2026-operations-update-hqd1qqxsi1h4w3u.html">update shows</a> that zinc-in-concentrate at the Sasa mine in North Macedonia rose 18 per cent to 4,968 tonnes in the quarter and lead-in-concentrate rose 21 per cent to 7,255 tonnes. The company also said it exercised its remaining warrants in Aberdeen Minerals, raising its stake to 38.9 per cent, and that the closing of its all-share acquisition of Cygnus Metals is scheduled for late October 2026.</p><p><a href="https://corridorminerals.com/news/central-asia-metals-kounrad-copper-q3-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Tau-Ken Samruk cites 150,000 tonnes of confirmed copper as PM reviews Balkhash</title><link>https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review</link><guid isPermaLink="true">https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review</guid><pubDate>Fri, 23 Oct 2026 00:00:00 +0000</pubDate><description>At Karatas and the Kazakhmys smelter on 8 October, officials reported higher copper grades, a 21.8 billion tenge upgrade and a 300,000-tonne smelter due in 2030.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review.jpg?v=9c41abdb" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Balkhash copper review, Tau-Ken Samruk cites 150,000 t of confirmed copper</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review.jpg?v=9c41abdb" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review.jpg?v=9c41abdb" length="133129" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's state-owned National Mining Company Tau-Ken Samruk told Prime Minister Olzhas Bektenov on 8 October that its confirmed reserves exceed 8 tonnes of gold and 150,000 tonnes of copper, according to the <a href="https://primeminister.kz/en/news/olzhas-bektenov-reviews-development-of-systemically-important-enterprises-in-balkhash-31975">government's readout</a> of a visit to the Balkhash area. The Prime Minister also toured the Kazakhmys Smelting plant and was briefed on the 750 billion tenge Qazaq Smelter project, which is meant to lift national copper output above 800,000 tonnes a year.</p>
<h2>A state-led exploration model</h2>
<p>The <a href="https://primeminister.kz/en/news/olzhas-bektenov-reviews-development-of-systemically-important-enterprises-in-balkhash-31975">readout</a> describes a model in which Tau-Ken Samruk secures licences, carries out exploration, registers confirmed reserves on the state balance sheet and then brings in foreign partners at a more advanced stage of readiness. Nariman Absametov, chairman of the company's management board, reported that it had secured three licences in the past year and started exploration for gold, copper and rare earth deposits. The readout's account of his report says: "Confirmed reserves already exceed 8 tons of gold and 150,000 tons of copper." It calls the figures confirmed but does not say whether they are yet on the state balance sheet.</p>
<p>At Karatas, a copper deposit operated by Tau-Ken Samruk, Absametov said the average copper content had increased from 0.35 per cent to 0.46 per cent. The readout does not describe those grades as reserves. It adds that bulk technological sampling is under way, to be followed by hydrogeological and geotechnical studies.</p>
<p>Kazgeology JSC is working in seven regions covering 55,000 square kilometres, the readout says, and has started detailed mapping at a scale of 1:50,000 on 20 key sites with a total area of 100,000 square kilometres. The readout says state funding alone "has been increased tenfold, totaling approximately $500 million over the next three years", and that Bektenov instructed Tau-Ken Samruk to apply the Karatas approach to the Zhosabay project and other prospective sites. The figure is close to the $470 million for exploration in 2026 to 2028 that the government's <a href="https://primeminister.kz/en/news/olzas-bektenov-prinial-ucastie-v-astana-mining-metallurgy-2026-pravitelstvo-realizuet-poruceniia-prezidenta-po-razvitiiu-produkcii-vysokogo-peredela-v-gmk-31506">summary</a> of the June Astana Mining and Metallurgy congress attributed to Bektenov.</p>
<h2>The existing smelter</h2>
<p>The Kazakhmys Smelting plant at Balkhash has operated since 1938 and accounts for approximately 51 per cent of refined copper cathode output, the readout says. Its design capacity is 220,000 tonnes of copper cathode a year, and Kazakhmys is running a modernisation programme valued at 21.8 billion tenge this year. Zhanibek Baigabelov, general director of Kazakhmys Smelting, reported on major repairs to Vanyukov Furnace No. 1, while a major overhaul of Vanyukov Furnace No. 2, valued at over 5.4 billion tenge, is scheduled for 2027.</p>
<h2>The planned second smelter</h2>
<p>Qazaq Smelter's plant would be built under a government-approved investment agreement with the Ministry of Industry and Construction, according to the readout. Private investment is put at 750 billion tenge, with construction due to begin in 2027 and commissioning in 2030. Design capacity is 300,000 tonnes of copper cathode, 10 tonnes of gold and 1.5 million tonnes of sulphuric acid a year, with 1,200 permanent jobs. The readout says copper recovery would reach up to 98 per cent and emissions would fall from 60,000 tonnes to 5,000 tonnes a year.</p>
<p><a href="https://interfax.com/newsroom/top-stories/118561/">Interfax reported</a> on 30 July that the government had approved the agreement and that Qazaq Smelter was founded in June for the project. The 300,000-tonne design is about 36 per cent larger than the existing plant's 220,000-tonne capacity, on simple division of the readout's figures. <a href="https://news.metal.com/en/newscontent/104036568-kazakhstan-approves-300000-mt-copper-smelting-project-in-balkhash-planned-to-start-production-in-2030">SMM noted</a> at the time that the concentrate source, process route, financing and construction contractor had not been disclosed, and the readout does not name them either. SMM also pointed to a separate 300,000-tonne smelter planned by KAZ Minerals in the Abay region for commissioning in 2030 or 2031. The government's June summary referred to a copper smelter worth more than $1.5 billion under construction in the Abay region.</p><p><a href="https://corridorminerals.com/news/tau-ken-samruk-karatas-copper-reserves-balkhash-smelter-review">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Anglo Asian&#x27;s copper output more than doubles as Demirli nears full production</title><link>https://corridorminerals.com/news/anglo-asian-mining-q3-2026-demirli-copper-azerbaijan</link><guid isPermaLink="true">https://corridorminerals.com/news/anglo-asian-mining-q3-2026-demirli-copper-azerbaijan</guid><pubDate>Fri, 23 Oct 2026 00:00:00 +0000</pubDate><description>The Azerbaijan miner made 5,514 tonnes of copper in the third quarter and kept 2026 guidance, but cash fell as $30 million of September sales were paid in October.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/anglo-asian-mining-q3-2026-demirli-copper-azerbaijan.jpg?v=f7e5ce5c" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Azerbaijan copper, Demirli lifts Anglo Asian&#x27;s copper output</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/anglo-asian-mining-q3-2026-demirli-copper-azerbaijan.jpg?v=f7e5ce5c" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/anglo-asian-mining-q3-2026-demirli-copper-azerbaijan.jpg?v=f7e5ce5c" length="108014" type="image/jpeg"/><content:encoded><![CDATA[<p>Anglo Asian Mining's copper output more than doubled in the third quarter as its Demirli mine in Azerbaijan moved towards full production, and the AIM-listed company kept its 2026 guidance, <a href="https://www.investegate.co.uk/announcement/rns/anglo-asian-mining--aaz/q3-2026-production-and-sales-update/9827632">according to its quarterly update</a>, first released on 15 October and amended the next day. Copper production was 5,514 tonnes in the three months to 30 September, against 2,288 tonnes a year earlier and 5,129 tonnes in the second quarter.</p>
<p>Demirli produced 3,824 tonnes and Gedabek 1,690 tonnes. The company expects Demirli to reach steady-state production by the end of November, and says it will become a majority copper producer this year. In the first nine months copper output reached 14,354 tonnes, up from 3,476 tonnes in the same period of 2025, <a href="https://www.investegate.co.uk/announcement/rns/anglo-asian-mining--aaz/q3-2026-production-and-sales-update/9827632">the update shows</a>.</p>
<h2>Gold flat, silver up</h2>
<p>Gold production was 6,781 ounces in the quarter, almost unchanged from 6,798 ounces a year earlier, of which 5,582 ounces were contained in doré and 1,199 ounces came from flotation and SART processing. Silver production rose to 52,969 ounces from 41,623 ounces. Mining resumed at Ugur during the quarter after an evaluation of the mineralisation, the company said. Nine-month gold output was 19,110 ounces and silver 145,824 ounces.</p>
<p>The company sold 5,733 ounces of gold bullion at an average of $4,259 an ounce, against 5,181 ounces at $3,430 a year earlier, <a href="https://www.investegate.co.uk/announcement/rns/anglo-asian-mining--aaz/q3-2026-production-and-sales-update/9827632">according to the update</a>. Concentrate sales totalled 28,987 dry metric tonnes worth $80.5 million: 19,332 tonnes from Demirli worth $50.1 million, from nothing a year earlier, and 9,655 tonnes from Gedabek worth $30.4 million, up from $17.8 million.</p>
<h2>Cash falls on timing of receipts</h2>
<p>Cash fell to $56.5 million at the end of September from $70.0 million at the end of June, and debt to $9.4 million from $12.3 million. The net cash outflow of $10.6 million in the quarter included $10.0 million of payments for the 2025 final dividend and profits tax and $30.1 million of working capital tied up in sales invoiced in September and paid in October, which the company expects to reverse in the fourth quarter, <a href="https://www.investegate.co.uk/announcement/rns/anglo-asian-mining--aaz/q3-2026-production-and-sales-update/9827632">the update says</a>. Unsold doré and copper concentrate inventory was worth $27.0 million at the end of the quarter.</p>
<p>Full-year guidance is unchanged at 20,000 to 25,000 tonnes of copper, 26,000 to 30,000 ounces of gold and 170,000 to 210,000 ounces of silver, with all-in sustaining costs of $6,000 to $7,000 a tonne of copper and $1,500 to $1,800 an ounce of gold. Copper output of 14,354 tonnes in nine months leaves between about 5,650 and 10,650 tonnes to be produced in the fourth quarter to land within that range, on the company's figures; the third-quarter rate was 5,514 tonnes.</p>
<h2>Three more mines planned</h2>
<p>The company aims to become a multi-asset, mid-tier copper and gold producer by 2030, with forecast copper production of around 50,000 to 55,000 tonnes a year in 2030, <a href="https://www.investegate.co.uk/announcement/rns/anglo-asian-mining--aaz/q3-2026-production-and-sales-update/9827632">according to the update</a>. That growth depends on bringing three new mines into production between 2027 and 2030, at Xarxar, Garadag and Zafar, in addition to Gilar and Demirli, which started production in May and July 2025. Copper is now the company's principal product, the update says, and Gilar and Demirli are its two newest operating mines.</p>
<p>The update does not give capital costs or a financing plan for the three new mines. On the reported cash and debt figures, the company had net cash of about $47 million at the end of September. The amended release corrected the reported doré sales value for the first half of 2026 to $4,664 an ounce and put the copper content of ore fed to the Demirli plant in the third quarter at 5,120 tonnes.</p><p><a href="https://corridorminerals.com/news/anglo-asian-mining-q3-2026-demirli-copper-azerbaijan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Erdene&#x27;s Zuun Mod study shows US$745 million NPV for Mongolian moly-copper project</title><link>https://corridorminerals.com/news/erdene-zuun-mod-pea-molybdenum-copper-mongolia</link><guid isPermaLink="true">https://corridorminerals.com/news/erdene-zuun-mod-pea-molybdenum-copper-mongolia</guid><pubDate>Wed, 21 Oct 2026 00:00:00 +0000</pubDate><description>The preliminary assessment assumes US$687 million of initial capex and a 34-year life, but inferred resources make up about 74% of plant feed.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/erdene-zuun-mod-pea-molybdenum-copper-mongolia.jpg?v=379f6400" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Zuun Mod economics, Erdene Zuun Mod study: US$745m NPV</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/erdene-zuun-mod-pea-molybdenum-copper-mongolia.jpg?v=379f6400" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/erdene-zuun-mod-pea-molybdenum-copper-mongolia.jpg?v=379f6400" length="109093" type="image/jpeg"/><content:encoded><![CDATA[<p>Erdene Resource Development said on 14 October that a preliminary economic assessment of its Zuun Mod molybdenum-copper project in Mongolia returns an after-tax net present value of US$745.1 million at an 8 per cent discount rate and an after-tax internal rate of return of 16.1 per cent, on initial capital expenditure of US$686.8 million, according to the company's <a href="https://erdene.com/erdene-announces-preliminary-economic-assessment-results-for-zuun-mod-molybdenum-copper-project/">release</a>. The Toronto-listed company's base case assumes US$25.00 a pound for molybdenum and US$5.00 a pound for copper, with payback in the sixth year of production.</p>
<h2>What the study assumes</h2>
<p>The <a href="https://erdene.com/erdene-announces-preliminary-economic-assessment-results-for-zuun-mod-molybdenum-copper-project/">release</a> sets out a 34-year mine life with nominal throughput of 25 million tonnes a year and 834.2 million tonnes of total plant feed, at grades of 0.041 per cent molybdenum and 0.058 per cent copper. Average annual recovered production is about 19.8 million pounds of molybdenum and 27.9 million pounds of copper. Over the life of the mine that adds up to 672.1 million pounds of molybdenum (304.9 thousand tonnes) and 947.2 million pounds of copper (429.6 thousand tonnes). The strip ratio is 1.31 to 1.</p>
<p>Initial capital cost includes US$176.7 million of contingency and is spread over a three-year construction period. Sustaining capital is US$462.6 million and closure costs are US$86.5 million, for a total of US$1,235.9 million. The all-in sustaining cost is US$13.89 a pound of molybdenum, with a C1 cash cost of US$10.24, the release says. At the base prices, annual production is worth about US$635 million before any deductions, of which molybdenum accounts for about 78 per cent, on our calculation, matching the share <a href="https://www.northernminer.com/news/erdene-eyes-687m-build-for-mongolia-moly-project/1003895759/">the Northern Miner</a> gives for molybdenum's part of projected revenue.</p>
<h2>Spot case and the inferred share</h2>
<p>At spot-case prices of US$33.00 a pound for molybdenum and US$6.50 for copper, the study shows an after-tax net present value of US$1,980.7 million, an internal rate of return of 27.8 per cent and payback in the fourth production year. Undiscounted life-of-mine EBITDA is US$7.1 billion in the base case and US$13.0 billion in the spot case.</p>
<p>The resource estimate, effective 1 May 2026 at a cut-off of 0.025 per cent molybdenum, has measured and indicated resources of 407.1 million tonnes at 0.048 per cent molybdenum and 0.062 per cent copper, and inferred resources of 596.2 million tonnes at 0.041 per cent and 0.056 per cent. Inferred material makes up about 74 per cent of the plant feed in the study, and about 16 per cent of feed in the six-year payback period, the <a href="https://erdene.com/erdene-announces-preliminary-economic-assessment-results-for-zuun-mod-molybdenum-copper-project/">release</a> says. It adds that inferred resources are too speculative to be classed as reserves and that the results are less certain than those of a pre-feasibility or feasibility study. Northern Miner quotes Erdene as saying the assessment "doesn't establish economic viability".</p>
<h2>Funding and next steps</h2>
<p>The release contains no funding plan. It says only that Erdene is in talks with multiple potential partners on offtake, financing and strategic partnership structures. Northern Miner reports that the company is seeking a partner for the larger project while expecting cash flow from gold, and that the Bayan Khundii gold mine, 35 kilometres west of Zuun Mod, has entered commercial production through a 50:50 joint venture with Mongolian Mining. It puts Zuun Mod about 280 kilometres from a railhead at the Mongolia-China border and says shares rose 1.8 per cent to C$5.71 on the day, valuing Erdene at about C$374 million. Northern Miner gives initial capex as C$976 million, so the build cost is about 2.6 times the company's market value, on our division.</p>
<p>Peter Akerley, president and chief executive, said in the release: "This PEA confirms Zuun Mod as one of the world's premier undeveloped resources of molybdenum." Northern Miner quotes him describing the construction cost estimate as "relatively modest for the scale of the project given the economics of operating in Asia", and reports that the company sees production within five years, without giving a calendar year in the body of the article. The release, for its part, gives no start date.</p>
<p>Drilling is due to begin in late October to upgrade and expand the resource and to test for copper across the wider porphyry system, with engineering, environmental and hydrogeological work running alongside. A 2027 programme is meant to convert inferred resources to measured and indicated, starting with the first five years of the mine plan. The technical report is to be filed on SEDAR+ within 45 days of the release.</p><p><a href="https://corridorminerals.com/news/erdene-zuun-mod-pea-molybdenum-copper-mongolia">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Oyu Tolgoi copper output rises 27% in third quarter on underground ramp-up</title><link>https://corridorminerals.com/news/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up</link><guid isPermaLink="true">https://corridorminerals.com/news/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up</guid><pubDate>Tue, 20 Oct 2026 00:00:00 +0000</pubDate><description>Rio Tinto&#x27;s Mongolian mine produced 113.5 kt of copper in concentrates, while gold fell about 11% as the open pit moved into lower-grade phases.</description><category>Mining</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up.jpg?v=bde3088a" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Oyu Tolgoi output, Oyu Tolgoi copper up 27% on underground ramp-up</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up.jpg?v=bde3088a" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up.jpg?v=bde3088a" length="116613" type="image/jpeg"/><content:encoded><![CDATA[<p>Oyu Tolgoi, the copper and gold mine in Mongolia in which Rio Tinto holds a 66 per cent interest, produced 113.5 thousand tonnes of copper in concentrates in the third quarter, up 27 per cent on the same quarter of 2025 and 17 per cent on the second quarter, according to the <a href="https://www.sec.gov/Archives/edgar/data/0000863064/000086306426000041/ex1prodresults.htm">operational data in Rio Tinto's third-quarter production results</a>, released on 14 October.</p>
<p>Output for the first nine months reached 312.0 thousand tonnes, 29 per cent above the 241.3 thousand tonnes produced in the same period of 2025, the <a href="https://www.sec.gov/Archives/edgar/data/0000863064/000086306426000041/ex1prodresults.htm">same document</a> shows. Rio Tinto said the operation was running at an annualised rate of about 450 thousand tonnes. Its stated target is an average of around 500 thousand tonnes of copper a year, on a 100 per cent basis and as recoverable metal, from 2028 to 2036, and it said the ramp-up remains on track. On those figures the gap between the current pace and the target is about 50 thousand tonnes a year.</p>
<h2>Underground operations drive the gain</h2>
<p>Rio Tinto attributed the quarterly increase to the continued ramp-up of underground operations with higher recoveries. Underground ore treated rose to 3,768 thousand tonnes in the third quarter from 2,870 thousand tonnes a year earlier and 3,263 thousand tonnes in the second quarter, <a href="https://www.sec.gov/Archives/edgar/data/0000863064/000086306426000041/ex1prodresults.htm">according to the production tables</a>. The underground copper grade was 2.36 per cent, against 2.16 per cent in the third quarter of 2025 and 2.28 per cent in the second.</p>
<p>The comparison base matters. Rio Tinto said that the third quarter of 2025 was affected by a planned concentrator shutdown, and that the equivalent shutdown this year took place in the second quarter. The year-on-year and quarter-on-quarter gains therefore include a timing effect. On Rio Tinto's account each nine-month period contains one such shutdown, so the 29 per cent increase for the first nine months is the cleaner measure of the underlying trend.</p>
<h2>Gold slips as the pit moves on</h2>
<p>Gold in concentrates fell to 123.6 thousand ounces in the third quarter from 138.2 thousand ounces a year earlier, a decline of about 11 per cent calculated from the <a href="https://www.sec.gov/Archives/edgar/data/0000863064/000086306426000041/ex1prodresults.htm">company's table</a>, and from 127.3 thousand ounces in the second quarter. Nine-month gold output was 374.0 thousand ounces, against 297.2 thousand ounces in 2025.</p>
<p>Rio Tinto said it had recently completed the latest phase of mining in a high gold-grade area of the open pit, and that the next planned phases of the sequence contain lower gold grades for the rest of 2026 and into 2027.</p>
<h2>Licence, loan and group context</h2>
<p>The release also updates the mine's licence and financing position. In June 2026, it says, the Government of Mongolia agreed to commence work on resolution of the Entrée licence transfer for Panel 1. While that remains in progress, Rio Tinto continues to advance Panels 0 and 2 North, followed by Panel 2 South, and it expects Panel 1 to be the final panel brought into production. The company also said that, as part of the periodic review required under the Shareholders Agreement, it formally signed the previously agreed adjustment to the Oyu Tolgoi shareholder loan interest rate during the third quarter. The <a href="https://www.sec.gov/Archives/edgar/data/0000863064/000086306426000041/ex1prodresults.htm">sentence in the release</a> does not state the revised rate.</p>
<p>At group level, Rio Tinto's consolidated copper production was 205 thousand tonnes in the third quarter, unchanged on a year earlier and 4 per cent lower than the second quarter. Production for the nine months was 646 thousand tonnes, up 1 per cent. Full-year guidance of 800 to 870 thousand tonnes was left unchanged, which on simple subtraction implies fourth-quarter output of 154 to 224 thousand tonnes. The company also kept its copper C1 net unit cost guidance for Kennecott, Oyu Tolgoi and Escondida at 30 to 50 US cents per pound. A market-news summary of the release by <a href="https://www.directorstalkinterviews.com/rio-tinto-maintains-2026-guidance-as-oyu-tolgoi-copper-output-rises-29/4121266317">DirectorsTalk Interviews</a> headlines the same 29 per cent nine-month rise at Oyu Tolgoi.</p><p><a href="https://corridorminerals.com/news/oyu-tolgoi-copper-output-q3-2026-underground-ramp-up">Read on Corridor Minerals</a></p>]]></content:encoded></item>
</channel>
</rss>
