<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/">
<channel>
<title>Corridor Minerals: Energy Transition</title>
<link>https://corridorminerals.com/</link>
<atom:link href="https://corridorminerals.com/category/energy-transition/rss.xml" rel="self" type="application/rss+xml"/>
<description>Renewables, grids and hydrogen tied to mining and metals.</description>
<image><url>https://corridorminerals.com/img/brand/wordmark-mark-on-light.png?v=955e6486</url><title>Corridor Minerals: Energy Transition</title><link>https://corridorminerals.com/</link><width>144</width><height>21</height></image>
<language>en-gb</language>
<copyright>Corridor Minerals</copyright>
<ttl>60</ttl>
<lastBuildDate>Sat, 14 Nov 2026 00:00:00 +0000</lastBuildDate>
<item><title>Kazakhstan signs $1.2bn of wind and gas deals at COP31 in Antalya</title><link>https://corridorminerals.com/news/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay</guid><pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate><description>The package includes a 1 GW wind plant in Kostanay and a 150 MW plant in Turkestan, as renewables reach 8 per cent of the energy mix.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay.jpg?v=06fc380b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan at COP31, $1.2bn of wind and gas deals</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay.jpg?v=06fc380b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay.jpg?v=06fc380b" length="116586" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan signed agreements worth about $1.2 billion on renewable energy and the modernisation of gas infrastructure at the COP31 climate conference in Antalya, including wind power plants of 1 GW in Kostanay region and 150 MW in Turkestan region, <a href="https://primeminister.kz/ru/news/olzhas-bektenov-po-porucheniyu-prezidenta-prinyal-uchastie-v-sammite-cop31-v-antale-32111">the government said</a> on 11 November.</p>
<p>Prime Minister Olzhas Bektenov attended the leaders' summit on the President's instruction. He said the share of renewables in the energy mix had quadrupled in six years to 8 per cent in 2026, against a target of 15 per cent by 2030, and that nuclear, wind, solar and green hydrogen projects were under development. Kazakhstan, Azerbaijan and Uzbekistan have a joint Green Energy Corridor project to export clean electricity, he said. Azerbaijan has four power export links <a href="https://corridorminerals.com/news/azerbaijan-four-power-export-links-under-way-studied-open">under way or under study</a>.</p>
<p>The package also covers 1.35 million smart gas meters with remote data transmission for Aqyl Energy. The government did not name the developers of the two wind plants or give the cost of each. The new capacity adds to the government's plan for 13.3 GW of new generation by 2029, of which 5.9 GW is renewable, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">as we reported</a>.</p>
<p>Before the conference opened, Kazakhstan had prepared a preliminary package of 28 cooperation documents, including 19 memorandums of understanding, with the final list to be set by the Ministry of Ecology and Natural Resources, <a href="https://astanatimes.com/?p=122742">The Astana Times reported</a> on 9 November. The country's pavilion was to host 36 events, <a href="https://caspianpost.com/kazakhstan/kazakhstan-to-sign-28-cooperation-documents-at-cop31-in-turkiye">Caspian Post reported</a>. Projects shown there included methane emissions reduction, recycling of lithium-ion batteries and a green energy corridor across the Caspian Sea to Europe, the government said. COP31 runs in Antalya until 20 November.</p>
<p>The leaders' summit drew heads of state and government from more than 70 countries. Kazakhstan's pavilion programme also covered the restoration of the North Aral Sea, protection of the Caspian Sea environment, the energy transition, carbon markets and green investment, and its digital exhibits included a regional carbon AI platform and a Caspian Climate Shield adaptation system, the government said.</p><p><a href="https://corridorminerals.com/news/kazakhstan-cop31-antalya-1-2-billion-wind-gas-deals-1-gw-kostanay">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan readies for 18,200 MW winter peak with 5.8m tonnes of coal</title><link>https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>Repair budgets rose 27 per cent for plants and grids that are up to 65.7 per cent worn, and 62 per cent of the season&#x27;s coal has been procured.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes.jpg?v=ee4251c9" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh heating season, Winter peak seen at 18,200 MW</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes.jpg?v=ee4251c9" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes.jpg?v=ee4251c9" length="139409" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan expects electricity demand to peak at up to 18,200 MW this winter, 3 per cent above last season, and its power plants hold 5.8 million tonnes of coal in reserve, Energy Minister Yerlan Akkenzhenov told a government session, <a href="https://primeminister.kz/en/news/heating-season-in-kazakhstan-is-proceeding-routinely-yerlan-akkenzhenov-32103">the government said</a> on 10 November.</p>
<p>The minister said the heating season was proceeding routinely and that all consumers were fully supplied with electricity and heat. Power plants also hold 137,000 tonnes of fuel oil. Kazakhstan generated 102 billion kWh of electricity in the first ten months of 2026, 2.3 per cent more than in the same period of 2025, the government said.</p>
<p>Under the System Operator's schedule for the 2026 to 2027 autumn and winter period, 9 power units, 55 boilers and 51 turbines were due for repair. By the session, 8 units, 49 boilers and 37 turbines had been completed, and the remaining work concerns reserve capacity and does not affect the season, the ministry said. Regional grid companies repaired 17,100 km of power lines and 444 substations, all of their plan, as well as 377 km of heating networks.</p>
<p>Repair financing rose by an average of 27 per cent. Power plants received up to 384 billion tenge, electric grids up to 393 billion tenge and heating networks up to 198 billion tenge, the ministry said, which comes to 975 billion tenge on a Corridor Minerals calculation. <a href="https://www.zakon.kz/obshestvo/6538169-teplo-bez-pereboev-i-ugol-bez-ocheredey-glava-minenergo-rasskazal-o-prokhozhdenii-otopitelnogo-sezona.html">Zakon.kz</a> described the total as almost 1 trillion tenge.</p>
<p>The equipment that money goes to remains old. The ministry put wear at 52 per cent for power plants, 65.7 per cent for electric networks and 48 per cent for heating networks. Technological disruptions fell by an average of 6 per cent year on year, and by 8 per cent at power plants.</p>
<p>Summer works under the national project for modernising the energy and utilities sectors replaced some of the most worn pipes. Stepnogorsk rebuilt 9.5 km of heating networks with about 85 per cent wear. Taldykorgan renewed, in a first stage, 3.5 km of a 700 mm trunk pipeline that had been in service for 46 years and was 87 per cent worn, and Petropavl modernised two heating main sections totalling 4.3 km.</p>
<p>Households and municipal users need 7.3 million tonnes of coal this season: 5.7 million tonnes for the population and 1.6 million tonnes for the municipal and household sector. By the reporting date 4.52 million tonnes, 62 per cent of the requirement, had been procured. A republican headquarters at the ministry coordinates supply with coal mining companies, operators, the national railway company KTZ and local authorities.</p>
<p>Regions are also receiving 255,000 tonnes of fuel oil for social needs under a delivery schedule, with shipments running since September, <a href="https://bes.media/news/energosistema-kazahstana-zimoy-budet-rabotat-s-povyshennoy-nagruzkoy-kak-gotovyatsya-k-holodam/">Bes.media reported</a> from the same session. Receivables owed to power producers fell 11 per cent to 72 billion tenge, the outlet added.</p>
<p>The winter forecast sits inside a supply plan that runs to 2029. The government plans 13.3 GW of new generating capacity by that year, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">as we reported</a>, and Samruk-Energy's plants produced 29.6 billion kWh in the first nine months of 2026, <a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">above their plan</a>. The ministry said it was monitoring the remaining plant repairs, the non-reducible regulatory fuel reserve and emergency stocks of materials and equipment, with duty crews on standby.</p><p><a href="https://corridorminerals.com/news/kazakhstan-winter-peak-18200-mw-coal-stocks-5-8-million-tonnes">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>KEGOC to add 440 MW to southern transit as Kazakhstan targets surplus</title><link>https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029</link><guid isPermaLink="true">https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>The grid operator plans a 500 MW link for western Kazakhstan by December 2027 and expects digital dispatch to save 5.5 billion tenge a year.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029.jpg?v=6c341577" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh grid, KEGOC to add 440 MW in the south</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029.jpg?v=6c341577" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029.jpg?v=6c341577" length="136392" type="image/jpeg"/><content:encoded><![CDATA[<p>KEGOC, Kazakhstan's grid operator, will add 440 MW of throughput to the transit linking Almaty, Zhambyl and Shymkent by July 2027, its chairman Nabi Aitzhanov told a meeting chaired by Prime Minister Olzhas Bektenov, <a href="https://primeminister.kz/en/news/olzhas-bektenov-holds-meeting-on-countrys-electric-power-industry-development-samruk-kazyna-fund-projects-reviewed-32087">the government said</a> on 5 November.</p>
<p>The meeting reviewed power projects of the Samruk-Kazyna sovereign fund. Bektenov cited President Kassym-Jomart Tokayev's declaration of 2027 as the Year of Large-Scale Nationwide Construction and said a sustainable energy surplus by 2029 requires generation, grids and the growth in consumption to move in step. He instructed officials to speed up development of the national electrical grid, told the Ministry of Energy to complete its update of the energy balance by September 2027 and ordered tighter oversight of investment projects in the power sector, the government said.</p>
<p>Aitzhanov said the project to unite the grid of western Kazakhstan with the Unified Power System will raise throughput to 500 MW, with completion in December 2027. A second stage, due in 2035, will close the high-voltage ring. KEGOC also plans upgrades to the Almaty and Zhetysu grids to take power from hydropower plants and new renewable facilities. The Energy Ministry first set out the western link in March as more than 600 km of new 500 kV line, <a href="https://astanatimes.com/2026/03/kazakhstan-to-link-western-regions-to-national-grid-in-major-network-upgrade-by-2027/">The Astana Times reported</a>.</p>
<p>Aitzhanov gave a fuller outlook to a committee of the National Kurultai, <a href="https://www.trend.az/casia/kazakhstan/4242423.html">Trend reported</a> on 3 November. KEGOC expects average annual load growth of 5.6 per cent in 2027 to 2033 and a capacity surplus of 2.8 GW by 2029, including the required reserve, and 5.9 GW by 2035 if the planned generation projects are built. Its investment programme rises from 48.8 billion tenge in 2024 to 181.8 billion tenge in 2026, the agency reported.</p>
<p>KEGOC expects digital technologies and artificial intelligence to yield 5.5 billion tenge a year, about 3 per cent of its EBITDA, through optimised power flows and lower losses. Connecting power plants to automatic frequency and active power control should save about 4 billion tenge a year. The National Dispatch Centre controls all 83 KEGOC substations and tracks more than 50,000 indicators, the government said.</p>
<p>Since the start of the year the North to South line has seen more than 70 sharp load surges, and 95 per cent of them were resolved without cutting power to households. The AI-KEGOC platform forecasts generation and consumption a day ahead across 21 power hubs and 169 renewable facilities, and synchrophasor monitoring raised the throughput of the North to South link by 250 MW without new construction.</p>
<p>Samruk-Energy chairman Ansar Aidarov, <a href="https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman">appointed at the end of October</a>, reported progress on the modernisation of Almaty CHP-2, the reconstruction of Almaty CHP-3, combined heat and power plants in Kokshetau and Semey, the expansion of Ekibastuz GRES-2, combined cycle plants in the Kyzylorda and Turkestan regions, and renewable projects with energy storage and hydropower. The projects form part of the government's plan for 13.3 GW of new capacity by 2029, <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">set out in October</a>.</p><p><a href="https://corridorminerals.com/news/kegoc-440-mw-southern-transit-2027-kazakhstan-power-surplus-2029">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s October power output rises 7.2 per cent on hydro and solar</title><link>https://corridorminerals.com/news/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar</guid><pubDate>Fri, 13 Nov 2026 00:00:00 +0000</pubDate><description>Solar plants produced 729.9 million kWh, 39.2 per cent more than a year earlier, while wind output slipped and thermal plants grew 2.3 per cent.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar.jpg?v=53c46c2b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek power output, October output up 7.2 per cent</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar.jpg?v=53c46c2b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar.jpg?v=53c46c2b" length="145709" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's power plants generated 7.23 billion kWh of electricity in October, 7.2 per cent more than a year earlier, as hydropower output rose 41.8 per cent and solar plants 39.2 per cent, <a href="https://gov.uz/en/minenergy/news/view/240830">the Ministry of Energy said</a> on 1 November.</p>
<p>Total output was 7,230.2 million kWh, up 482.6 million kWh from 6,747.6 million kWh in October 2025. Thermal plants still produced most of it, 5,449.2 million kWh, 2.3 per cent more than a year earlier. Wind was the only large source to fall, slipping 1.5 per cent to 459.6 million kWh.</p>
<table><thead><tr><th>Electricity, million kWh</th><th>October 2025</th><th>October 2026</th><th>Change</th></tr></thead><tbody><tr><td>Thermal power plants</td><td>5,324.7</td><td>5,449.2</td><td>+2.3%</td></tr><tr><td>Solar power plants</td><td>524.3</td><td>729.9</td><td>+39.2%</td></tr><tr><td>Hydropower plants</td><td>346.8</td><td>491.7</td><td>+41.8%</td></tr><tr><td>Wind power plants</td><td>466.8</td><td>459.6</td><td>-1.5%</td></tr><tr><td>Small-scale solar panels</td><td>79.3</td><td>89.2</td><td>+12.5%</td></tr><tr><td>Small-capacity solar panels</td><td>5.7</td><td>10.7</td><td>+87.7%</td></tr></tbody></table>
<p>Hydropower, solar plants, wind and both classes of small solar panels together supplied 1,781.1 million kWh in October, 24.6 per cent of the total, against 1,422.9 million kWh and 21.1 per cent a year earlier, on a Corridor Minerals calculation from the ministry's figures. Solar plants produced 270.3 million kWh more than wind farms, on the same calculation. The 500 MW Forish solar plant alone had generated 897 million kWh since the start of the year by late October, <a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">as we reported</a>.</p>
<p>October extends the trend of the first nine months. Uzbekistan generated 69.6 billion kWh from January to September, 8.4 per cent more than a year earlier, an Energy Ministry official told a briefing, <a href="https://kun.uz/en/news/2026/10/21/uzbekistans-electricity-generation-rises-84-to-696-billion-kwh-in-nine-months">Kun.uz reported</a>. Large solar and wind plants produced 10.5 billion kWh in the nine months, matching their output for the whole of 2025, and hydropower plants 6.6 billion kWh, above the 6.5 billion kWh of 2025. Adding October gives 76.8 billion kWh for ten months, on a Corridor Minerals calculation.</p>
<p>Thermal plants carry the base load and are being expanded. Talimarjan's two new combined cycle units, with a capacity of 1,065 MW, can generate 8 billion kWh a year, <a href="https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan">as we reported</a>.</p>
<p>Daily figures since the end of October show the seasonal turn. On 9 November output was 246.9 million kWh, 1.1 per cent less than on the same date of 2025, and solar plants produced 5.7 million kWh, 62.5 per cent less, <a href="https://gov.uz/en/minenergy/news/view/245471">the ministry said</a>. It attributed the fall mainly to lower demand: warmer weather cut consumption by 7.6 per cent against the same day last year, when colder air raised heating demand. The ministry's monthly figures, <a href="https://www.trend.az/casia/uzbekistan/4241799.html">also carried by Trend</a>, do not separate block power plants for October.</p><p><a href="https://corridorminerals.com/news/uzbekistan-october-2026-power-output-rises-7-2-per-cent-hydro-solar">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Talimarjan&#x27;s new 1,065 MW gas units can generate 8 billion kWh a year</title><link>https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan</link><guid isPermaLink="true">https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan</guid><pubDate>Tue, 03 Nov 2026 00:00:00 +0000</pubDate><description>The US$944.87m expansion, lent by ADB, EBRD and Uzbekistan&#x27;s reconstruction fund, is meant to save 300 million cubic metres of gas a year.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan.jpg?v=1d5a609e" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek power, Talimarjan adds 1,065 MW of gas power</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan.jpg?v=1d5a609e" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan.jpg?v=1d5a609e" length="135612" type="image/jpeg"/><content:encoded><![CDATA[<p>Talimarjan Thermal Power Plant's two new combined cycle units, with a capacity of 1,065 MW, can generate 8 billion kWh of electricity a year, <a href="https://tpp.uz/oz/news/yangi-investitsiya-loyihasi-zamonaviy-energetikada-yangi-ishlab-chiqarish-yechimlari">Thermal Power Plants JSC said</a> on 29 October after a press tour of the site for journalists.</p>
<p>The project cost US$944.87m and was financed with loans from the Asian Development Bank, the European Bank for Reconstruction and Development and the Fund for Reconstruction and Development of Uzbekistan, the company said in its Uzbek-language release. Spain's Intesa Ingenieria Industrial, as the release names it, Japan's Mitsubishi Corporation and Türkiye's Çalık Energy took part in construction. The units were put into operation in December 2025, at a ceremony at the International Congress Centre attended by President Shavkat Mirziyoyev, the release says.</p>
<p>Each of the gas turbines installed has a capacity of 367.4 MW and the steam turbine 185.7 MW, the company said; the release does not set out how the turbines make up the 1,065 MW. A new 500 kV open switchyard carries the output into the national grid. Higher efficiency is meant to save 300 million cubic metres of natural gas a year, and the project created 100 to 120 jobs, the release says. It rests on a presidential resolution on expanding the plant with two more combined cycle units of not less than 900 MW.</p>
<p>The lenders set the targets years ago. The ADB's board approved a $450 million loan on 13 December 2017 for a project to add 850 to 950 MW of combined cycle capacity at Talimarjan, raising the plant's aggregate capacity to approximately 2,600 MW and its thermal efficiency from 48 per cent to 52 per cent, the <a href="https://www.adb.org/news/adb-loan-help-modernize-power-generation-uzbekistan">bank said</a> at the time. In January 2019 the <a href="https://www.ebrd.com/home/news-and-events/news/2019/ebrd-invests-in-modern-power-generation-in-uzbekistan.html">EBRD announced a loan of up to US$240m</a> to JSC Uzbekenergo for at least 900 MW of combined cycle gas turbines at the plant, co-financed with the ADB and the reconstruction fund, and said the design aimed to cut carbon intensity to around 350 kg of CO2 per MWh, approximately half the average of Uzbekistan's power sector.</p>
<p>Thermal plants still carry the system. Uzbekistan generated 254.9 million kWh of electricity on 30 October, 13.2 per cent more than a year earlier, of which thermal power plants produced 200.9 million kWh, the energy ministry said in its <a href="https://t.me/minenergy_uz/21551">daily figures</a>. Solar plants produced 22.1 million kWh, hydropower plants 18.7 million kWh, wind farms 10.0 million kWh and block stations 2.9 million kWh. On those figures thermal plants supplied about 79 per cent of the day's output, on a Corridor Minerals calculation.</p>
<p>Gas, the fuel of the new Talimarjan units, is becoming scarcer. Large enterprises produced 27.0 billion cubic metres of natural gas in January to September, against 32.3 billion a year earlier, as set out in <a href="https://corridorminerals.com/news/uzbekistan-natural-gas-output-falls-27-billion-cubic-metres-nine-months-2026">our report on the nine-month figures</a>, which gives weight to the gas savings the plant claims. Renewables are growing beside them: the 500 MW Forish solar plant generated 897 million kWh this year to late October, as <a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">we reported</a>.</p>
<p>The release does not say how much of the new units' output has been generated since December 2025 or what tariff the plant receives.</p><p><a href="https://corridorminerals.com/news/talimarjan-1065-mw-combined-cycle-units-8-billion-kwh-uzbekistan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan&#x27;s power exports fall by a third as home sales rise</title><link>https://corridorminerals.com/news/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise</guid><pubDate>Tue, 03 Nov 2026 00:00:00 +0000</pubDate><description>Exports fell to 1.59 billion kWh in eight months while imports slipped 1.8 per cent, so net imports rose 82 per cent on our calculation.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise.jpg?v=fa23f4ea" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh power balance, Power exports fall by a third</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise.jpg?v=fa23f4ea" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise.jpg?v=fa23f4ea" length="119841" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan exported 1.59 billion kWh of electricity in the first eight months of 2026, 32.8 per cent less than a year earlier, while imports slipped to 3.17 billion kWh, the Bureau of National Statistics said in a <a href="https://stat.gov.kz/api/iblock/element/413816/file/en/">balance table</a> on 20 October.</p>
<p>The table sets what the country produced and imported against what it exported and sold at home. Power plants generated 82.02 billion kWh from January to August, 2.8 per cent more than in the same months of 2025, and imports were 1.8 per cent lower. Sales on the domestic market rose 3.6 per cent to 83.60 billion kWh, while exports fell.</p>
<p>That shifted the trade further towards imports. Kazakhstan imported 1.59 billion kWh more than it exported in the eight months, against 0.87 billion kWh a year earlier, a rise of 82 per cent on a Corridor Minerals calculation. Imports supplied 3.7 per cent of the electricity available in the period, the table shows.</p>
<table><thead><tr><th>Electricity, million kWh</th><th>January to August 2025</th><th>January to August 2026</th><th>Change</th></tr></thead><tbody><tr><td>Production</td><td>79,794.2</td><td>82,018.0</td><td>+2.8%</td></tr><tr><td>Imports</td><td>3,230.9</td><td>3,173.0</td><td>-1.8%</td></tr><tr><td>Exports</td><td>2,359.2</td><td>1,586.4</td><td>-32.8%</td></tr><tr><td>Sales on the domestic market</td><td>80,665.9</td><td>83,604.6</td><td>+3.6%</td></tr></tbody></table>
<p>August followed the same pattern. Exports were 97.8 million kWh, against 223.0 million kWh in August 2025, and imports 636.4 million kWh, against 723.7 million kWh, the monthly columns show.</p>
<p>Generation kept rising into September. The bureau's <a href="https://stat.gov.kz/api/iblock/element/413699/file/en/">industry table</a>, published on 16 October, puts output at 91.32 billion kWh for the first nine months, 2.6 per cent more than a year earlier. Samruk-Energy's group companies reported 29.6 billion kWh for the same nine months, <a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">as we reported</a>, about a third of the national figure on a Corridor Minerals calculation.</p>
<p>The government has set out how it plans to meet demand. Vice Minister of Energy Bakytzhan Ilyasov told a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting</a>, the government said on 29 October, that the country generated a record 123.1 billion kWh last year against consumption of 124.6 billion kWh. The government plans 13.3 GW of new capacity by 2029 to create a 20 per cent surplus of generating capacity, as set out in <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">our report on the plan</a>.</p>
<p>The balance table does not name the countries that bought or supplied the electricity, and the bureau marks its figures as preliminary. Shares and the net figure above are Corridor Minerals calculations from the bureau's figures in million kWh. The next edition of the table is due on 20 November, the bureau's <a href="https://stat.gov.kz/en/release-calendar/?date=11.2026">release calendar</a> shows.</p><p><a href="https://corridorminerals.com/news/kazakhstan-power-exports-fall-third-eight-months-2026-net-imports-rise">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Samruk-Kazyna names Ansar Aidarov to lead Samruk-Energy&#x27;s management board</title><link>https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman</link><guid isPermaLink="true">https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman</guid><pubDate>Mon, 02 Nov 2026 00:00:00 +0000</pubDate><description>The former chief investment officer takes over as the fund&#x27;s chief executive asks for power stations on time; group plants beat their nine-month plan.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman.jpg?v=8a5063c3" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Samruk-Energy, A new head for Samruk-Energy</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman.jpg?v=8a5063c3" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman.jpg?v=8a5063c3" length="117047" type="image/jpeg"/><content:encoded><![CDATA[<p>Samruk-Kazyna has appointed Ansar Aidarov chairman of the management board of Samruk-Energy, putting the power group's former chief investment officer in charge, the fund said in a <a href="https://t.me/samruk_energy/5119">post that Samruk-Energy shared</a> on its official channel on 30 October.</p>
<p>The decision was taken by the management board of Samruk-Kazyna, says the post, which is in Kazakh and Russian. Nurlan Zhakupov, chairman of the Samruk-Kazyna management board, introduced the new head to the company's staff and held a working meeting, at which he said key investment projects must keep strictly to their deadlines and required power stations to be commissioned on time.</p>
<p>Aidarov has worked in the Samruk-Kazyna group since 2013. He was previously general director of Energiya Semirechya LLP, head of Samruk-Energy's project office and its chief investment officer, the post says. As chief investment officer, he was quoted by the company when it signed a cooperation agreement on about 2 GW of solar and wind projects with Oman's O-GREEN, as <a href="https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement">we reported on 25 October</a>.</p>
<p>He takes over a group whose plants beat their nine-month plan. Samruk-Energy companies generated 29.6 billion kWh of electricity in January to September 2026, 2.9 per cent above target and 1 per cent more than a year earlier, the company said in a <a href="https://samruk-energy.kz/en/press-center/news/2971-samruk-energy-exceeds-electricity-generation-target-by-nearly-3-in-the-first-nine-months-of-2026">statement on 28 October</a>. Thermal plants produced 24.7 billion kWh, 3 per cent above target, including 18 billion kWh at Ekibastuz SDPP-1, which beat its own target by 4 per cent; hydropower plants produced 4.64 billion kWh, also 4 per cent above target, as set out in <a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">our report on the figures</a>. Shardarinsk HPP and Ust-Kamenogorsk HPP reached 108 per cent of their targets, the statement says.</p>
<p>The post does not name the projects Zhakupov referred to. The national programme they sit in is large: Kazakhstan plans to commission 13.3 GW of new capacity through 2029, including 7.4 GW of base generation and 5.9 GW of renewables, Vice Minister of Energy Bakytzhan Ilyasov told a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting on 29 October</a>. The government says the programme is meant to leave the country with a 20 per cent electricity surplus by 2029.</p><p><a href="https://corridorminerals.com/news/samruk-kazyna-appoints-ansar-aidarov-samruk-energy-management-board-chairman">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Samruk-Energy beats its nine-month power plan by 2.9 per cent</title><link>https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan</link><guid isPermaLink="true">https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Its plants generated 29.6 billion kWh, 1 per cent more than a year earlier, with Ekibastuz SDPP-1 supplying 18 billion kWh.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan.jpg?v=d6494749" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh power, Samruk-Energy output runs above plan</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan.jpg?v=d6494749" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan.jpg?v=d6494749" length="111230" type="image/jpeg"/><content:encoded><![CDATA[<p>Samruk-Energy said its group companies generated 29.6 billion kWh of electricity in January to September, 2.9 per cent above plan and 1 per cent more than a year earlier, in a <a href="https://samruk-energy.kz/en/press-center/news/2971-samruk-energy-exceeds-electricity-generation-target-by-nearly-3-in-the-first-nine-months-of-2026">statement on 28 October</a>.</p>
<p>Thermal plants produced 24.7 billion kWh, 3 per cent above their target. Ekibastuz SDPP-1 generated 18 billion kWh, 4 per cent above target. Hydropower plants generated 4.64 billion kWh, also 4 per cent above plan, with the Shardara and Ust-Kamenogorsk plants at 108 per cent of their targets. Thermal and hydro output together come to 29.34 billion kWh, by Data Desk arithmetic; the statement does not say what produced the remaining 0.26 billion kWh. Thermal plants supplied about 83 per cent of the group's output and Ekibastuz SDPP-1 alone about 61 per cent, by the same arithmetic.</p>
<p>The figures matter for the smelters and mines that buy Kazakh power. At the government meeting of 29 October, vice-minister of energy Bakytzhan Ilyasov said the country generated a record 123.1 billion kWh last year against consumption of 124.6 billion kWh, in a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government readout</a>. On that basis, Samruk-Energy's nine months equal about 24 per cent of last year's national generation, the Data Desk calculates. The same readout sets out 13.3 GW of new capacity by 2029, covered in Corridor Minerals' <a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">report on the plan</a>.</p>
<p>The company is also preparing for winter. At a meeting of the Public Council of Samruk-Kazyna, Samruk-Energy and the grid operator KEGOC reported on preparations for the 2026 to 2027 heating season. In an <a href="https://samruk-energy.kz/en/press-center/news/2937-samruk-energy-scompletes-its-maintenance-campaign">update on 9 October</a>, Samruk-Energy said it had scheduled maintenance on 111 major equipment units this year, including 19 major overhauls, five extended overhauls and 87 routine jobs, covering power units, boilers, turbines, transmission lines, substations and heating networks, and that nearly half of the new generating capacity Kazakhstan plans to 2035 is attributable to it. Its renewables work abroad includes the <a href="https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement">2 GW accord with Oman's O-GREEN</a>.</p>
<p>The statement gives no quarterly split and no comparison with plan for the wind and solar plants in the group.</p><p><a href="https://corridorminerals.com/news/samruk-energy-nine-month-2026-power-output-29-6-billion-kwh-above-plan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Türkiye&#x27;s Milli Enerji 2040 plan foresees US$100bn of grid investment</title><link>https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained</link><guid isPermaLink="true">https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The energy ministry launches the 2040 vision on 5 November; here is what it has said so far, and what electricity buyers in industry still do not know.</description><category>Energy Transition</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained.jpg?v=19225012" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Explainer, Milli Enerji 2040 before its launch</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained.jpg?v=19225012" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained.jpg?v=19225012" length="113829" type="image/jpeg"/><content:encoded><![CDATA[<p>Türkiye will launch Milli Enerji 2040, its energy vision to 2040, in Istanbul on 5 November, and expects about US$100bn of investment in electricity transmission and distribution under it, Energy Minister Alparslan Bayraktar <a href="https://enerji.gov.tr/haber-detay?id=31954">said</a>.</p>
<p>Bayraktar made the announcement at an electricity distribution sector event, the energy ministry said on 26 October. Bayraktar said the work on what he called a new energy architecture to 2040 is nearly complete, and has not yet published the document. This explainer sets out what the ministry has said ahead of the launch.</p>
<p>The plan starts from rising electricity use. Bayraktar said Türkiye is entering a period in which the use of electricity will grow in every part of the economy, from industry and transport to buildings and agriculture. Electric vehicles, the electrification of production processes, artificial intelligence and the growth of data centres will raise both the amount of demand and its character, he said.</p>
<p>Electricity made up 15 per cent of final energy consumption in 2002 and 21 per cent today, according to the minister. In industry the share has reached 30 per cent and in buildings 33 per cent. The ministry did not give the year of the latest figures.</p>
<p>The minister's message was that generation alone is not the plan. Transmission and distribution, storage, digital technology and system management have to be developed together, he said, and the US$100bn is for the grid side. He also said the ministry wants domestic software in wide use across the distribution network and the network protected against cyber attacks.</p>
<p>Türkiye's installed power capacity reached 127,355 MW at the end of September, the <a href="https://enerji.gov.tr/haber-detay?id=31953">ministry said on 25 October</a>. Renewable capacity was 80,315 MW, or 63.1 per cent of the total, and domestic sources made up 72.1 per cent. Solar stood at 28,222 MW and wind at 15,540 MW, together 43,762 MW. In September, domestic sources met 70.3 per cent of electricity generation, Bayraktar said. Corridor Minerals set out those figures in its <a href="https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026">data piece on the September capacity</a>.</p>
<p>The launch comes four days before COP31, the <a href="https://unfccc.int/cop31">UN climate conference</a> that Türkiye hosts in Antalya from 9 to 20 November. Bayraktar said the strengthening of electricity grids will be one of the main energy transition subjects on Türkiye's COP31 agenda, including distribution modernisation, digitalisation, the integration of renewables and the financing of grid investment.</p>
<p>For metal producers, the 30 per cent industrial figure is the one to follow. Turkish steel output and export markets are covered in Corridor Minerals' reports on <a href="https://corridorminerals.com/news/turkiye-steel-output-nine-months-2026-cis-kazakhstan-worldsteel">Turkish steel output</a> and on <a href="https://corridorminerals.com/news/erdemir-third-quarter-2026-export-share-buyers-mills-policymakers-analysis">Erdemir's third quarter</a>.</p>
<p>What the statements so far do not give is a timetable for the US$100bn, the split between transmission and distribution, how the investment will be financed, or any generation, storage or demand targets for 2040. Those are the figures industrial buyers will look for on 5 November.</p><p><a href="https://corridorminerals.com/news/turkiye-milli-enerji-2040-launch-100-billion-grid-investment-explained">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Aksa Enerji brings its storage-backed Kırşehir solar plant online</title><link>https://corridorminerals.com/news/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation</link><guid isPermaLink="true">https://corridorminerals.com/news/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>The Alıç plant pairs 48.17 MW of solar with 48.17 MWh of storage, part of an 891 MW storage-backed portfolio the company listed in January.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation.jpg?v=841a923d" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Türkiye, power, Solar with storage enters service in Kırşehir</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation.jpg?v=841a923d" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation.jpg?v=841a923d" length="116411" type="image/jpeg"/><content:encoded><![CDATA[<p>Aksa Enerji has started commercial operation of its Alıç solar plant with storage in Kırşehir province after an energy ministry acceptance covering 48.17 MW of installed capacity and 48.17 MWh of storage, the company <a href="https://www.kap.org.tr/tr/Bildirim/1687483">said</a> on 26 October.</p>
<p>The company's disclosure to the Public Disclosure Platform says Türkiye's Ministry of Energy and Natural Resources completed a partial acceptance of the plant in central Anatolia. It gives no investment figure or offtake terms. It says the plant follows the company's strategy of diversifying its generation portfolio and that it will keep investing in renewable technologies to meet its 2030 targets.</p>
<p>Aksa's January 2026 <a href="https://www.aksaenerji.com.tr/media/hdwfceb4/yatirimci-sunumu_ocak-2026.pdf">investor presentation</a> listed Alıç at 50 MW, licensed and due for commissioning in June 2026, among 13 storage-backed wind and solar projects with pre-licences or licences in 10 provinces, totalling 891.41 MW, of which 10 projects with 700.5 MW had completed their environmental impact assessments. It put the solar hybrids at 225.5 MW across six sites, from Gaziantep Pamuk (40.5 MW, due in February 2026, which the company said in June had entered commercial operation) to two 50 MW projects in Eskişehir due in July 2027, with Van Zümrüt at 25 MW and Kayseri Fatih at 10 MW. Alıç therefore entered service later than the June date in that schedule, with 48.17 MW accepted so far by the ministry against the 50 MW listed. The presentation also said the company's Mersin wind project with storage had become Türkiye's first storage-backed renewable plant to receive a generation licence from the energy regulator, EPDK, in March 2025, and that Alıç received its own generation licence in December 2025, a month after Gaziantep Pamuk.</p>
<p>Financing came partly from the Industrial Development Bank of Türkiye (TSKB), which signed a US$80 million loan with Aksa Yenilenebilir Enerji, the company's wholly owned renewables subsidiary, to fund Alıç, Gaziantep Pamuk and a 50 MW, 50 MWh standalone storage facility in Şanlıurfa, Para <a href="https://www.paradergi.com.tr/is-dunyasi-kulis/2025/07/29/tskb-ve-aksa-enerjiden-80-milyon-dolarlik-anlasma">reported</a> in July 2025. The loan runs for 11 years with a one-year grace period.</p>
<p>Storage lets a solar plant hold daytime output for later hours, and the acceptance covers both parts of Alıç. Renewables already make up most of the country's installed capacity, as our <a href="https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026">September capacity data</a> showed, and storage-linked projects in the region include the <a href="https://corridorminerals.com/news/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage">Kostanay wind and storage agreement</a> in Kazakhstan.</p><p><a href="https://corridorminerals.com/news/aksa-enerji-alic-kirsehir-48-mw-solar-48-mwh-storage-commercial-operation">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan pays UZS 642.1bn in rooftop solar subsidies in nine months</title><link>https://corridorminerals.com/news/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>Payments to 70,700 Solar Home participants are 52.7 times the 2024 total; Bukhara, Khorezm and Karakalpakstan take nearly half.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026.jpg?v=8a3344c1" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan solar, Rooftop solar subsidies reach UZS 642.1bn</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026.jpg?v=8a3344c1" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026.jpg?v=8a3344c1" length="127348" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan paid UZS 642.1 billion from the state budget to 70,700 individuals who delivered surplus power from their rooftop solar panels to the grid in January to September 2026, <a href="https://t.me/minenergy_uz/21537">the energy ministry said</a> on 30 October.</p>
<p>The exact sum is UZS 642 billion 112.1 million, the post says, paid under the Solar Home programme. It repeats the figures of a post published the same morning by <a href="https://t.me/fiskaltahlil/1593">Fiskal tahlillar</a>, a channel that publishes tax administration data, and neither post gives the volume of electricity behind the payments.</p>
<p>Three regions received the largest sums: Bukhara region UZS 116.7 billion, Khorezm region UZS 115.3 billion and the Republic of Karakalpakstan UZS 77.2 billion. Together that is UZS 309.2 billion, or 48.2 per cent of the national figure on the Data Desk's division. The posts do not break down the remaining UZS 332.9 billion between the other regions and Tashkent city.</p>
<h2>How the payment is set</h2>
<p>The programme was created by <a href="https://lex.uz/docs/6385720">presidential resolution PP-57 of 16 February 2023</a> for small solar installations of up to 50 kW in households and started on 1 April 2023. The resolution sets a subsidy of UZS 1,000 from the state budget for each kWh of surplus electricity from panels on property owned by individuals that is delivered to the unified power system.</p>
<p>The subsidy is calculated at the end of each month on the positive difference between the electricity a household delivers to the grid and the electricity it takes from it, and the tax authorities transfer it through the Soliq mobile app by the 25th of the following month, the resolution says. A household that delivers more than it consumes in a month pays nothing to the regional electricity networks company for that month.</p>
<p>At that rate, UZS 642.1 billion corresponds to about 642 million kWh of net supply to the grid, a Data Desk calculation that assumes every payment was made at UZS 1,000 per kWh. Because each payment follows the month of supply, payments made in January to September would mostly cover electricity delivered from December 2025 to August 2026, on the resolution's timetable; the posts do not state the supply period. For scale, the 500 MW Forish solar plant generated 897 million kWh between the start of the year and 24 October, <a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">as Corridor Minerals reported</a> from the ministry's figures.</p>
<h2>More than fifty times the 2024 payments</h2>
<p>The programme was far smaller in 2024. In January 2025 <a href="https://t.me/minenergy_uz/14747">the ministry said</a> 10,826 individuals had received UZS 12.182 billion in 2024 for 12,182,090 kWh delivered to the grid, which matches the UZS 1,000 rate. The largest sums then went to Khorezm region, UZS 2.8 billion, Karakalpakstan, UZS 1.9 billion, and Tashkent city, UZS 1.4 billion.</p>
<p>Nine months of 2026 therefore paid 52.7 times the full-year 2024 sum to 6.5 times as many people, and the average payment per recipient rose to about UZS 9.1 million from about UZS 1.1 million, on the Data Desk's division. The documents opened for this piece give no total for 2025.</p>
<p>The payments are a charge on the state budget that rises with net rooftop supply, and the power they pay for reaches the same grid that supplies mines and metals plants. The statistics committee's investment data show the share of fixed investment going to electricity, gas, steam and air conditioning supply fell to 6.7 per cent in January to September from 12.9 per cent a year earlier, <a href="https://corridorminerals.com/news/uzbekistan-mining-power-share-fixed-investment-falls-january-september-2026">as Corridor Minerals reported</a>.</p>
<p>Method: sums are as the ministry's posts of 30 October 2026 and 29 January 2025 give them; the regional share, the ratios, the averages and the implied kWh are the Data Desk's arithmetic on those sums and on the rate in resolution PP-57.</p><p><a href="https://corridorminerals.com/news/uzbekistan-rooftop-solar-subsidies-642-billion-soums-nine-months-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbek grid nearly doubles transformer power at 10 Tashkent substations</title><link>https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>New transformers add 333.2 MVA before winter, with Qorasuv up from 53.6 to 138.6 MVA, as output on 29 October ran 15.9 per cent above a year earlier.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations.jpg?v=ab2fe8f0" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan grid, Tashkent substations reach 699.8 MVA</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations.jpg?v=ab2fe8f0" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations.jpg?v=ab2fe8f0" length="126747" type="image/jpeg"/><content:encoded><![CDATA[<p>National Electric Grid of Uzbekistan has replaced power transformers at 10 substations in Tashkent, raising their combined capacity from 366.6 MVA to 699.8 MVA ahead of the autumn and winter season, <a href="https://t.me/minenergy_uz/21521">the energy ministry said</a> on 28 October.</p>
<p>The work adds 333.2 MVA of transformer capacity in the capital, the post says. Its stated aims are to raise the load the networks can carry, reduce the risk of supply interruptions and give households and businesses stable electricity. MVA measures the apparent power a transformer can pass, not the output of a power plant.</p>
<p>The largest single change is at the Qorasuv substation, where capacity rose from 53.6 MVA to 138.6 MVA, an increase of 85 MVA. Istiqbol went from 80 MVA to 126 MVA and Bibliotechnaya from 53.2 MVA to 90 MVA. Yangi Tuzel grew almost fourfold, from 12.6 MVA to 50 MVA, the steepest rise in proportion.</p>
<p>Five of the 10 substations now have 50 MVA: Saziit, up from 20 MVA, Risovaya from 32 MVA, Yangi Tuzel, Charogon from 26 MVA and Gornaya from 30 MVA. Vistavochnaya rose from 50 MVA to 80 MVA and Tuzel from 10 MVA to 16 MVA, the smallest of the 10.</p>
<p>The station figures in the post add up to 367.4 MVA before and 700.6 MVA after, 0.8 MVA more than each of the stated totals, on the Data Desk's addition. The difference between the two sums, 333.2 MVA, matches the stated addition; the post does not explain the 0.8 MVA gap between the station figures and its totals.</p>
<p>The upgrade comes as output rises. Uzbekistan generated 255.5 million kWh of electricity on 29 October, 35 million kWh or 15.9 per cent more than on the same day of 2025, <a href="https://t.me/minenergy_uz/21539">the ministry's daily figure shows</a>. The post's breakdown by type of plant adds up to 267.8 million kWh, 12.3 million kWh more than the stated total, and the post does not reconcile the two.</p>
<p>The same grid company is the counterpart in a wider programme. The Asian Development Bank's <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">US$200 million loan</a>, signed in October, will upgrade 60 critical distribution substations across Uzbekistan and strengthen the operational capabilities of JSC National Electric Grid of Uzbekistan; the bank says aging infrastructure, electricity losses and overloaded equipment have made reliable service harder, <a href="https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation">as Corridor Minerals reported</a>. The ministry's post does not say how the Tashkent work was financed or whether any of the 10 substations is part of that programme.</p>
<p>Network capacity and generating capacity are separate constraints. At the annual peak load on 10 December 2024, plants in the Central Asian Unified Power System had 36.4 GW installed but only 28.8 GW available, <a href="https://eabr.org/en/press/detail/edb-proposes-a-framework-for-power-connectivity-in-central-asia-better-system-management-not-just-mo/">the Eurasian Development Bank said</a> on 29 October, a gap <a href="https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained">Corridor Minerals explained</a> this week. Larger transformers let a substation take more load, but they do not add electricity to the system.</p>
<p>For industrial users in and around the capital, the post gives the transformer capacity now installed at each named substation, one measure of the load those nodes can take; it does not say how much new connected load the upgrade allows.</p><p><a href="https://corridorminerals.com/news/uzbekistan-grid-doubles-transformer-power-10-tashkent-substations">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>World Bank approves $100m loan for Uzbekistan&#x27;s power distribution grid</title><link>https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan</link><guid isPermaLink="true">https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan</guid><pubDate>Sun, 01 Nov 2026 00:00:00 +0000</pubDate><description>With ADB&#x27;s $200m and $71m from the state budget, the $371m programme covers 60 substations and aims to cut losses there by 20,000 MWh a year.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan.jpg?v=03b72acb" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek grid, World Bank adds $100m to grid upgrade</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan.jpg?v=03b72acb" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan.jpg?v=03b72acb" length="116000" type="image/jpeg"/><content:encoded><![CDATA[<p>The World Bank's board approved a $100 million loan on 27 October to make Uzbekistan's electricity distribution system more efficient and reliable, <a href="https://www.worldbank.org/en/news/press-release/2026/10/27/uzbekistan-to-modernize-electricity-distribution-systems-enable-job-growth-with-wo">the bank said</a>, adding to the $200 million the Asian Development Bank has lent for the same programme.</p>
<p>With a $71 million contribution from Uzbekistan's budget, the Modernization of Electricity Distribution Systems Program now has $371 million of financing, the World Bank says. The ADB approved its loan with the government on 30 September and <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">signed it in Bangkok on 15 October</a>, as Corridor Minerals reported in its <a href="https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation">report on the ADB loan</a>. The two banks prepare and oversee the programme jointly under their Full Mutual Reliance Framework, which the World Bank says cuts transaction costs and duplicated procedures for the government.</p>
<p>JSC National Electric Grid of Uzbekistan will carry out the programme, modernising and digitalising 60 key substations across the country. By 2031 it is expected to cut losses at the renovated substations by 20,000 MWh a year, help enable at least 3.3 GW of renewable energy and avoid nearly 23,000 tonnes of CO2 equivalent a year. The bank also expects about 11,700 more and better jobs in the five years after the facilities are commissioned.</p>
<p>The programme is aimed at the limit on how much renewable electricity the network can absorb and deliver to households and businesses, the release says. Uzbekistan aims to produce 25 GW of renewable energy by 2030, in the World Bank's words, and much of the distribution network was built decades ago, with many substations overloaded. New wind and solar plants keep connecting, among them the <a href="https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction">300 MW wind farm commissioned in Karakalpakstan</a>.</p>
<p>"Reliable electricity is essential for households and economic activity. It is a foundation for jobs, public services, and economic growth," said Najy Benhassine, the World Bank's Division Director for Central Asia.</p>
<p>The approval was also reported in Tashkent by <a href="https://www.gazeta.uz/en/2026/10/28/wb/">Gazeta.uz</a>. The World Bank release does not list the 60 substations, say how the loan will be disbursed or say when the first upgraded substation will be finished. Industrial users on the distribution network will feel the change only as upgraded substations come into service.</p><p><a href="https://corridorminerals.com/news/world-bank-approves-100-million-uzbekistan-electricity-distribution-loan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan&#x27;s 500 MW Forish solar plant generated 897m kWh this year</title><link>https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The ministry gives 897 million kWh against 1.1 billion kWh of yearly capability, 81.5 per cent by Data Desk arithmetic, a load factor near 25 per cent.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026.jpg?v=32ab33eb" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek solar, Forish solar plant tests Uzbek load factor</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026.jpg?v=32ab33eb" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026.jpg?v=32ab33eb" length="115180" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's energy ministry said the 500 MW Forish solar plant in Jizzakh region has generated 897 million kWh since the start of this year, in a <a href="https://t.me/minenergy_uz/21487">Telegram post on 24 October</a>.</p>
<p>The same post says the plant can produce 1.1 billion kWh a year.</p>
<p>The post gives no end date for the 897 million kWh beyond "since the beginning of the current year". The figure is therefore not a full-year result. It also says the output saved 239.2 million cubic metres of natural gas and avoided 515.8 thousand tonnes of emissions, and equals the average electricity use of 448.5 thousand households over 10 months.</p>
<p>The two figures in the post can be set against each other. Output of 897 million kWh is 81.5 per cent of the 1.1 billion kWh annual capability. If the period runs to the day of the post, 24 October, it covers 297 days of the year, or about 81.4 per cent of the 365. That is the Data Desk's arithmetic, not a ministry figure, and it assumes the period ended on the post date.</p>
<p>On that assumption, the Data Desk calculates a capacity factor, the share of the plant's maximum possible output that it actually delivered, of about 25.2 per cent. The calculation divides 897 million kWh by 500 MW running for 7,128 hours (297 days). The design figure gives almost the same answer: 1.1 billion kWh over the 4,380 million kWh a 500 MW plant would produce in 8,760 hours is about 25.1 per cent. As yield, that is about 1,794 kWh per installed kilowatt against a design level of 2,200.</p>
<p>The design figure is not new. Trend reported in April 2024, citing the president's office, that the plant would cost $350 million and <a href="https://www.trend.az/casia/uzbekistan/3886726.html">produce 1.1 billion kWh of green energy a year</a>, with the first 200 MW due on the grid later that year. A June 2025 article on the Chinese state asset regulator's website describes a <a href="http://en.sasac.gov.cn/2025/06/23/c_19477.htm">CHD Jizzakh 500 MW solar project</a> that would supply over 1.1 billion kWh a year once operational. The sources differ on the developer: Trend names China Poly Group and China Electric, while the regulator's article refers to CHD, and the ministry post names none.</p>
<p>Three limits apply to the test. The post does not say when the whole 500 MW entered service, so any capacity connected part-way through the period would make the calculated factor look lower than the plant's true performance. It does not say whether 500 MW is the alternating-current or the panel rating, which changes the denominator. And the straight-line comparison ignores seasonality: the months the figure leaves out fall in the colder part of the year, when solar output is typically lower, so a full-year total would not simply continue at the same daily rate.</p>
<p>Within those limits, output to date sits close to the stated design level for the part of the year elapsed. It is a ministry statement, not a metered series, and the post gives no monthly data. For other recent Uzbek power projects, see Corridor Minerals' reports on the <a href="https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction">300 MW wind plant in Karakalpakstan</a> and the <a href="https://corridorminerals.com/news/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan">battery storage project in Bukhara</a>.</p><p><a href="https://corridorminerals.com/news/uzbekistan-forish-500-mw-solar-897-million-kwh-load-factor-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Türkiye&#x27;s renewables reach 63.1 per cent of installed power capacity</title><link>https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026</link><guid isPermaLink="true">https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Installed capacity reached 127,355 MW at the end of September; solar, at 28,222 MW, is now larger than gas, energy ministry figures show.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026.jpg?v=3944a146" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Türkiye power, Renewables reach 63.1 per cent of Turkish capacity</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026.jpg?v=3944a146" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026.jpg?v=3944a146" length="123339" type="image/jpeg"/><content:encoded><![CDATA[<p>Renewable plants made up 80,315 MW, or 63.1 per cent, of Türkiye's 127,355 MW of installed power capacity at the end of September, <a href="https://enerji.gov.tr/haber-detay?id=31953">the Ministry of Energy and Natural Resources said</a> on 25 October, up from 62.9 per cent a month earlier.</p>
<p>Hydropower remains the largest single source at 32,332 MW, or 25.4 per cent of the total. Solar follows with 28,222 MW, or 22.2 per cent, ahead of natural gas at 25,009 MW, or 19.6 per cent. Wind has 15,540 MW, domestic coal 11,565 MW, imported coal 10,466 MW, biomass 2,423 MW and geothermal 1,798 MW, the ministry's table shows. Solar and wind together reached 43,762 MW, 34.4 per cent of capacity.</p>
<p>Coal plants held 17.3 per cent between them, 9.1 per cent for domestic coal and 8.2 per cent for imported coal, a Data Desk sum of the ministry's shares. Biomass and geothermal plants together came to 4,221 MW, or 3.3 per cent.</p>
<h2>One month of additions</h2>
<p>The August figures, published by the ministry on 26 September and <a href="https://www.foreks.com/haber/detay/6ab7a68c24008d7d437379cc/AA/tr/turkiye-nin-elektrik-kurulu-gucunde-yenilenebilirin-payi-artiyor-26-09-26/">reported by Anadolu Agency</a>, put total capacity at 126,944 MW and renewable capacity at 79,902 MW, with 27,914 MW of solar and 15,434 MW of wind. On those numbers, Türkiye added 411 MW of capacity in September, of which 308 MW was solar and 106 MW wind, and the headline renewable figure grew by 413 MW, a Data Desk calculation.</p>
<p>Renewables grew slightly more than the total. Gas capacity edged down, to 25,009 MW from 25,012 MW in the August table, while both coal lines were unchanged. Both months put the share of domestic sources in installed capacity at 72.1 per cent. The <a href="https://www.cnbce.com/haberler/turkiyenin-elektrik-kurulu-gucunde-yeni-esik-yenilenebilirin-payi-yuzde-629-oldu-h38097">August release</a> already gave solar a 22 per cent share of capacity.</p>
<h2>Capacity is not output</h2>
<p>The share of renewables in what the plants generate is lower than their share of capacity. Türkiye generated 31.79 billion kWh in September, and renewable sources supplied 18.10 billion kWh, or 56.9 per cent, the ministry said. Hydropower supplied 8.27 billion kWh, about 26 per cent, solar 4.32 billion kWh, or 13.6 per cent, and wind 3.84 billion kWh, or 12.1 per cent. Domestic sources, which include domestic coal as well as renewables, produced 22.35 billion kWh, 70.3 per cent of the month's output.</p>
<p>Solar therefore made up 22.2 per cent of capacity but 13.6 per cent of September generation, a gap that reflects the lower load factor of solar plants, which generate only in daylight. The ministry publishes these figures monthly, so the September share is a single month and not an annual average.</p>
<h2>Why metal makers watch the grid</h2>
<p>Türkiye is one of the corridor's largest buyers of metal and a large steel producer in its own right. Its crude steel output rose 6.1 per cent in the first nine months of the year, as <a href="https://corridorminerals.com/news/turkiye-steel-output-nine-months-2026-cis-kazakhstan-worldsteel">Corridor Minerals reported</a> from World Steel Association data, and Turkish buyers took 59 per cent of Kazakhstan's refined copper exports by value in the first eight months, <a href="https://corridorminerals.com/news/kazakhstan-refined-copper-exports-turkiye-china-unit-values-2026">customs tables show</a>. The power those plants and cable makers buy now comes from a grid in which renewable plants hold close to two thirds of capacity and supplied a little over half of September's electricity.</p>
<p>Energy Minister Alparslan Bayraktar said Türkiye had brought its dependence on imported sources in power generation below 30 per cent in September and would keep expanding capacity.</p>
<p>Capacity and generation figures are the ministry's, as published on 25 October for the end of September and on 26 September for the end of August. Month-on-month changes are Data Desk subtractions from the published numbers. The ministry's renewable total is the sum of hydropower, solar, wind, biomass and geothermal capacity.</p><p><a href="https://corridorminerals.com/news/turkiye-renewables-63-1-per-cent-installed-power-capacity-september-2026">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan plans 13.3 GW of new power capacity by 2029</title><link>https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>Renewables supplied 8.5 per cent of output in nine months against a 7 per cent target, and the plan aims for a 20 per cent capacity surplus.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables.jpg?v=374aa026" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan power, 13.3 GW planned through 2029</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables.jpg?v=374aa026" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables.jpg?v=374aa026" length="119013" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan plans to commission 13.3 GW of new generating capacity through 2029, including 5.9 GW of renewables, Vice Minister of Energy Bakytzhan Ilyasov told <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">a government meeting</a>, the government said on 29 October.</p>
<p>The plan splits into 7.4 GW of base generation and 5.9 GW of renewable capacity. Ilyasov said it would cover the whole demand of the economy and the population, including energy-intensive artificial intelligence infrastructure and large data centres, and would create a 20 per cent surplus of generating capacity. The government's published account of the meeting gives no yearly schedule and no project list for the 13.3 GW.</p>
<h2>Where the system stands</h2>
<p>The grid now has 254 power sources, 172 of them renewable, with a combined capacity of 27.1 GW. Coal plants make up 13.7 GW, gas plants 7.1 GW and large hydropower stations 2.5 GW. Together those three come to 23.3 GW of the 27.1 GW, on a Corridor Minerals calculation, and the account does not break down the remainder.</p>
<p>Generation last year reached 123.1 billion kWh, which the account describes as a historical maximum, against consumption of 124.6 billion kWh. On Newsdesk's arithmetic, consumption was 1.5 billion kWh higher than generation. The account does not say how the difference was met.</p>
<p>Renewables supplied 8.5 per cent of total generation in the first nine months of 2026, against a target of 7 per cent, the account said.</p>
<h2>Coal, solar and what is contracted</h2>
<p>On renewables, the account says work is under way on auction tenders and on large solar initiatives, including a 300 MW China Energy plant and Tumar Commerce projects of up to 1 GW. It does not call either contracted, auctioned or financed, and it gives no dates. At least 8.4 GW of new renewable capacity is expected by the end of 2035, about 1.8 GW of it solar. Small distributed generation for businesses has grown fivefold since 2024 after legislative incentives, the account said.</p>
<p>A separate national project for coal generation covers 19 investment projects of about 7.8 GW: eight new plants of 5.3 GW and 11 expansion and modernisation projects of 2.5 GW. The account names Ekibastuz GRES-3, a thermal plant in Kurchatov and three combined heat and power plants in Kokshetau, Semey and Ust-Kamenogorsk. It does not say whether these projects fall inside the 7.4 GW of base generation.</p>
<p>Nor does it say which projects make up the 5.9 GW of renewables. Corridor Minerals reported 2.45 GW of Chinese wind agreements signed in September, including <a href="https://corridorminerals.com/news/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola">a 1 GW wind farm tied to an aluminium smelter</a>, but the government's statement does not mention them.</p>
<h2>What has been built so far</h2>
<p>Official <a href="https://stat.gov.kz/api/iblock/element/519454/file/en/">commissioning statistics</a> for January to September 2026, published on 23 October, list the power facilities put into operation. Wind plants account for 250 MW, in Aktobe region (150 MW) and Karaganda region (100 MW). Solar plants add 95.8 MW, in Kostanay region (25.8 MW) and Mangystau region (70 MW). The tables also show 34.8 MW of hydropower in Zhetisu, 30.7 MW of gas turbines in Zhetisu and 22 MW of thermal capacity in Astana.</p>
<p>Those five lines add up to 433.3 MW, on a Corridor Minerals calculation. The tables mark some power entries as confidential, so the sum is not a full count, and the nine-month period is not the same as the plan's horizon.</p>
<p>The Eurasian Development Bank (EDB) added a regional caution in <a href="https://eabr.org/en/press/detail/edb-proposes-a-framework-for-power-connectivity-in-central-asia-better-system-management-not-just-mo/">a report published on 29 October</a>. It reported that installed capacity and available capacity differ: at the annual peak on 10 December 2024, about 6.6 GW of plant in the Central Asian Unified Power System was unavailable, because of cold reserve capacity, water and fuel limits, equipment condition and network constraints. The bank also put regional demand growth at up to 6 per cent a year, reaching around 370 billion kWh by 2030. These are regional figures, not Kazakhstan's alone.</p>
<p>The government statement names no industrial customers and does not mention metals producers. One metals project shows the gap: ERG's proposed second phase at its Pavlodar aluminium smelter, <a href="https://corridorminerals.com/news/erg-kazakhstan-aluminium-smelter-second-phase-1bn-pavlodar">up to 400,000 tonnes a year</a>, was announced without a named power source for the new potlines, as Corridor Minerals reported. Which of the new plants would supply such loads is not stated in the government's account.</p><p><a href="https://corridorminerals.com/news/kazakhstan-plans-13-3-gw-new-power-capacity-2029-renewables">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>EDB finds Central Asia could run 28.8 GW of its 36.4 GW at peak demand</title><link>https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained</link><guid isPermaLink="true">https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained</guid><pubDate>Sat, 31 Oct 2026 00:00:00 +0000</pubDate><description>The shortfall at the 10 December 2024 peak came from reserves, water, fuel and grid limits; better operation could add 6 billion kWh of trade a year.</description><category>Energy Transition</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained.jpg?v=f20c2fde" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Central Asia power, Why Central Asia ran short of power capacity at peak</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained.jpg?v=f20c2fde" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained.jpg?v=f20c2fde" length="135254" type="image/jpeg"/><content:encoded><![CDATA[<p>Power plants in the Central Asian Unified Power System could deliver only 28.8 GW of their 36.4 GW of installed capacity at the annual peak load on 10 December 2024, <a href="https://eabr.org/en/press/detail/edb-proposes-a-framework-for-power-connectivity-in-central-asia-better-system-management-not-just-mo/">the Eurasian Development Bank said</a> on 29 October.</p>
<p>The bank puts the capacity that was unavailable at around 6.6 GW, held back by cold reserve, hydrological and fuel constraints, the condition of equipment and limits on the network. The <a href="https://eabr.org/upload/iblock/321/g9jrc9eb26lym7xsg8o1k7l6bdikurjg/EDB_2026_Energy-Without-Borders_Summary_EN.PDF">report's summary</a> lists a further 0.85 GW under repair separately, which accounts for most of the 7.6 GW difference between the two totals; the remaining 0.15 GW is not explained and may reflect rounding. <a href="https://eabr.org/en/analytics/special-reports/energy-without-borders/">Its report on power connectivity in Central Asia</a>, published as Energy Without Borders, argues that the region can make more electricity available through coordinated system operation, digital monitoring and phased market development, without building new power plants first.</p>
<h2>Installed capacity is not available capacity</h2>
<p>Installed capacity is the nameplate total of every plant connected to the system. Available capacity is what can run at a given hour once plants kept in reserve, units under repair, plants short of water or fuel and lines that cannot carry the power are taken out. The bank's point is that the gap opened at the one hour of the year when the system needed every plant.</p>
<p>For a smelter or a mine on a long-term power contract, available capacity at the peak is the figure that counts. Kazakhstan alone reported 27.1 GW of capacity across 254 power sources at a <a href="https://primeminister.kz/ru/news/20-procentnyy-proficit-elektroenergii-k-2029-godu-planiruetsya-sformirovat-v-kazahstane-32050">government meeting on 29 October</a>, where the vice minister of energy said generation reached a record 123.1 billion kWh last year against consumption of 124.6 billion kWh. Of the 2.45 GW of Chinese wind deals Kazakhstan signed in September, <a href="https://corridorminerals.com/news/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola">1 GW is tied to an aluminium smelter</a>.</p>
<h2>Lines on the map, little trade</h2>
<p>Cross-border electricity trade inside the unified system came to 12.1 billion kWh in 2024, which the bank calls well below the levels of mature regional markets. Digital monitoring, an accurate assessment of available transmission capacity and coordinated operation could add up to 6 billion kWh of trade a year without major construction, it estimates. Its scenarios put the gross benefit of deeper integration at up to US$640m a year and the net benefit, after integration costs, at up to US$120m a year.</p>
<p>Pressure is rising on both sides of the balance. Demand is growing by up to 6 per cent a year and could reach about 370 billion kWh by 2030, the bank says, while more than 35 GW of variable generation capacity is planned by 2035. Uzbekistan alone is projected to curtail between 2.1 billion and 3.5 billion kWh of renewable output a year in 2026 to 2028, electricity that plants could produce but the system could not take. Uzbekistan commissioned <a href="https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction">300 MW of wind and 100 MW of storage in Karakalpakstan</a> in September.</p>
<h2>Five steps the bank proposes</h2>
<p>The report sets five priorities: digital monitoring and commercial metering of deliveries; calculating and publishing available transmission capacity; grid reinforcements chosen on the rule of one constraint, one system-wide benefit, one project, each with measurable indicators; a market built in phases, from structured bilateral trade with clear rules for settling deviations to a regional day-ahead market and then balancing and ancillary services markets; and payment, under contract, for the flexibility of upstream hydropower.</p>
<p>Hydropower carries much of the argument. Toktogul, the Naryn cascade, Nurek and the planned Rogun plant provide regulation, peak supply and seasonal balancing for the region, and the bank argues that this flexibility should be treated as a paid system service with explicit rules, because water in Central Asia also serves irrigation, food security and interstate commitments on releases. It also warns that gains for the region as a whole do not mean even gains for each country, and that an economically beneficial project can stay politically difficult unless the sharing of gains is agreed in advance.</p>
<p>The report draws on operational data from the Energia Coordinating Dispatch Centre and also reviews links beyond the region, including the risks and conditions around CASA-1000 and the northern, eastern and trans-Caspian connections. On the Caspian side, Azerbaijan has <a href="https://corridorminerals.com/news/azerbaijan-four-power-export-links-under-way-studied-open">one export link under way, two studied and one open</a>, with a Central Asian study due in May 2027.</p><p><a href="https://corridorminerals.com/news/edb-central-asia-28-8-gw-of-36-4-gw-power-capacity-available-at-peak-explained">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Tajikistan signs Obikhingou hydropower MoU with China&#x27;s Xinjiang Shouhai</title><link>https://corridorminerals.com/news/tajikistan-obikhingou-hydropower-mou-xinjiang-shouhai-ebrd-kulob-grid-loan</link><guid isPermaLink="true">https://corridorminerals.com/news/tajikistan-obikhingou-hydropower-mou-xinjiang-shouhai-ebrd-kulob-grid-loan</guid><pubDate>Tue, 27 Oct 2026 00:00:00 +0000</pubDate><description>Deputies approved a €10 million EBRD loan for Kulob&#x27;s grid, while ministry data show the TALCO aluminium smelter owing 991.4 million somoni for power.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/tajikistan-obikhingou-hydropower-mou-xinjiang-shouhai-ebrd-kulob-grid-loan.jpg?v=ef82b987" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Tajik hydropower, Tajikistan signs Obikhingou hydropower MoU</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/tajikistan-obikhingou-hydropower-mou-xinjiang-shouhai-ebrd-kulob-grid-loan.jpg?v=ef82b987" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/tajikistan-obikhingou-hydropower-mou-xinjiang-shouhai-ebrd-kulob-grid-loan.jpg?v=ef82b987" length="130813" type="image/jpeg"/><content:encoded><![CDATA[<p>Tajikistan's Ministry of Energy and Water Resources signed a memorandum of understanding on 14 October with China's Xinjiang Shouhai Power Development Co., Ltd. on studying the potential for, and the construction of, hydropower plants on the Obikhingou river, <a href="https://www.mewr.tj/?p=8928">the ministry said</a>.</p>
<p>The document was signed in Dushanbe on the sidelines of the "Tajikistan, Forward" business forum by Energy Minister Daler Jumma and the company's head, Chen Zhengjiang. A second memorandum signed at the forum covers a private electricity distribution project in Dushanbe's Sino district, with a consortium led by Avesto Group LLC, signed for the company by Bezhan Azonov, its director for investment projects and international cooperation, <a href="https://www.mewr.tj/?p=8928">the release says</a>. The ministry said the two documents create a basis for wider cooperation with the private sector and foreign partners in power distribution and hydropower development. It gave no capacity, investment figure or timetable for either project.</p>
<p>Earlier plans for the Obikhingou envisaged five hydropower stations with a combined capacity of 2,610 MW, <a href="https://asiaplus.news/en/2026/10/15/chinese-company-to-explore-possibility-of-building-hydropower-plant-on-obikhingou-river-in-tajikistan/">Asia-Plus reported</a>, citing the ministry's announcement.</p>
<h2>EBRD money for distribution losses</h2>
<p>The same week, the lower house of parliament, the Majlisi Namoyandagon, approved a €10 million loan agreement with the European Bank for Reconstruction and Development to modernise electricity distribution in Kulob and surrounding districts, <a href="https://asiaplus.news/en/2026/10/14/tajikistans-parliament-approves-%e2%82%ac10-million-for-modernization-of-kulob-power-grids/">Asia-Plus reported</a> on 14 October, citing the parliamentary newspaper Sadoi Mardum. Finance Minister Fayziddin Qahhorzoda told deputies the agreement was signed on 5 August; the EBRD board approved the additional financing on 22 July.</p>
<p>The money is a long-term sovereign loan that will be passed to OJSC Shabakahoi Taqsimoti Barq, the distribution company, to upgrade ageing networks, install automated meters, introduce a new billing system, build a new 110/35/10 kV substation and modernise an existing one, <a href="https://asiaplus.news/en/2026/10/14/tajikistans-parliament-approves-%e2%82%ac10-million-for-modernization-of-kulob-power-grids/">the report says</a>. It adds to an EBRD-backed loss reduction project approved in November 2020 for Kulob, Bokhtar and nearby areas, valued at €36.4 million, including an EBRD loan of up to €20 million and a €15 million European Union investment grant. Parliament has also approved an earlier agreement to mobilise about €49.6 million, of which €28 million in loans, for loss reduction in nine distribution branches in Sughd and Khatlon regions, due to be completed by 30 May 2030.</p>
<h2>Losses and the aluminium smelter's arrears</h2>
<p>Losses remain large. In the first half of 2026 they totalled 1.654 billion kWh, or 12.9 per cent of electricity supplied, 607.9 million kWh less than a year earlier, ministry figures <a href="https://asiaplus.news/en/2026/10/14/tajikistans-parliament-approves-%e2%82%ac10-million-for-modernization-of-kulob-power-grids/">cited by Asia-Plus</a> show. Outstanding electricity bills, including debts from previous years, reached 3.835 billion somoni on 1 June 2026. Households owed about 1.127 billion somoni and the state aluminium producer TALCO 991.4 million somoni. On those figures the smelter alone accounted for about a quarter of the arrears.</p>
<p>The automated metering in Kulob is expected to improve the accuracy of consumption data and billing, reduce commercial losses and raise collection rates, <a href="https://asiaplus.news/en/2026/10/14/tajikistans-parliament-approves-%e2%82%ac10-million-for-modernization-of-kulob-power-grids/">the report says</a>, which bears directly on how much of the system's revenue reaches the distribution company. The ministry's release on the Shouhai memorandum does not say whether any output studied under it would be reserved for industrial users such as the smelter, or sold abroad.</p>
<h2>Regional grid talks in Varzob</h2>
<p>On 15 October Tajikistan hosted the 46th meeting of the Coordination Electric Power Council of Central Asia in Varzob, attended by representatives of the power sectors of Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan and Russia, <a href="https://www.mewr.tj/?p=8953">the ministry said</a>. Deputy Minister Sharif Mahmadzoda told the meeting that modernising infrastructure, introducing digital technology, developing renewable energy and improving grid reliability required coordinated action by the countries of the region. The council oversees the stable operation of the region's interconnected power system, according to the release, which reported no decisions.</p>
<p>The ministry did not publish the texts of the two memorandums, and its release describes them as a basis for cooperation rather than as commitments to build.</p><p><a href="https://corridorminerals.com/news/tajikistan-obikhingou-hydropower-mou-xinjiang-shouhai-ebrd-kulob-grid-loan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan signs 2.45 GW of Chinese wind deals, 1 GW tied to a smelter</title><link>https://corridorminerals.com/news/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola</guid><pubDate>Tue, 27 Oct 2026 00:00:00 +0000</pubDate><description>The three projects are 1 GW in Zhetysu with storage and an 800 km line, 1 GW in Abai and 450 MW in Akmola; no costs or tariffs were published.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola.jpg?v=47ae5d03" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakh wind power, 2.45 GW of Chinese wind deals for Kazakhstan</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola.jpg?v=47ae5d03" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola.jpg?v=47ae5d03" length="125422" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakh state and regional bodies signed agreements with Chinese companies for 2.45 gigawatts of wind power in Almaty on 25 September, including a 1 GW wind farm meant to accompany a new aluminium smelter, <a href="https://invest.gov.kz/media-center/press-releases/v-almaty-s-uchastiem-glavy-gosudarstva-prokhodit-investitsionnyy-forum-kazakhstan-kitay/">Kazakh Invest said</a>.</p>
<p>The agreements were signed at the Kazakhstan and China Investment Forum, which Kazakh Invest organised. The three wind projects were among 10 documents worth a total of $5.4 billion exchanged in the presence of President Kassym-Jomart Tokayev; about 50 commercial documents worth more than $8.2 billion were exchanged at the forum in all. The forum brought together about 600 participants, including some 300 Kazakh and Chinese companies, and one of its three panels, on industrial cooperation, gathered heads of mining and processing companies to discuss the shift from raw materials to deep processing.</p>
<p>The largest grid-connected package is in Zhetysu region. Samruk-Energy, China Energy Overseas Investment and Sany Renewable Energy signed an agreement to jointly develop wind plants with a total capacity of 1 GW, <a href="https://samruk-energy.kz/en/press-center/news/2911-samruk-energy-and-chinese-companies-agree-to-develop-1-gw-wind-power-project">Samruk-Energy said</a>. Kazakh Invest describes the project as two 500 MW wind farms with a 300 MWh energy storage system and a 500 kV transmission line of about 800 kilometres. Samruk-Energy said the project would improve the reliability of power supply to the southern regions and support the country's carbon neutrality goals. Neither release gives a cost or a timetable.</p>
<h2>Wind for a smelter</h2>
<p>In Abai region, the regional administration signed with a consortium of Xinjiang Sanbao Industrial Group and Inner Mongolia Wanjiang Investment for an electrolytic aluminium plant with capacity of 300,000 tonnes a year and an accompanying 1 GW wind power plant, <a href="https://invest.gov.kz/media-center/press-releases/v-almaty-s-uchastiem-glavy-gosudarstva-prokhodit-investitsionnyy-forum-kazakhstan-kitay/">the release says</a>. The same consortium signed for a particleboard plant in Semey. The release does not say whether the wind farm would supply the smelter directly or feed the grid, or how much of the smelter's demand it would cover. It also gives no investment figure for either the smelter or the wind farm.</p>
<p>The third wind agreement covers plants with a combined capacity of 450 MW in Akmola region, signed by the regional administration and Sungrow Renewable Development, <a href="https://invest.gov.kz/media-center/press-releases/v-almaty-s-uchastiem-glavy-gosudarstva-prokhodit-investitsionnyy-forum-kazakhstan-kitay/">Kazakh Invest said</a>. Other documents signed before the president included a urea plant in Turkestan region, an automotive complex in East Kazakhstan, a fund at the Astana International Financial Centre with Silk Road Finance Corporation to finance priority projects, and financing from China Construction Bank's Astana branch for the Development Bank of Kazakhstan.</p>
<h2>A growing wind pipeline</h2>
<p>The September agreements add to projects already financed. Earlier this year the EBRD organised an A/B loan of up to $548 million for Aktas Energy to build the 1 GW Mirny wind plant in Zhambyl region with a 300 MW and 600 MWh battery system, which it described as the country's largest onshore wind development and its first industrial-scale wind plant with battery storage, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-invests-us--250-million-in-kazakhstan-s-wind-farm-with-stor.html">according to the bank</a>. Co-lenders in the syndicated B-loan include China Construction Bank, Qatar National Bank, Societe Generale and Standard Chartered.</p>
<p>The EBRD has also lent up to €25 million to Sarens Kazakhstan for heavy lifting and installation equipment expected to enable at least 11.75 GW of additional wind capacity, in support of the government's plan to raise the share of renewables in total energy output to 15 per cent by 2030, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-facilitates-development-of-renewables-and-logistics-infra.html">the bank said</a>.</p>
<p>Chinese investment in Kazakhstan reached a record $2.8 billion of foreign direct investment in 2025, and China's share of the country's total FDI rose from 6.7 per cent in 2005 to 13.8 per cent in 2025, <a href="https://invest.gov.kz/media-center/press-releases/v-almaty-s-uchastiem-glavy-gosudarstva-prokhodit-investitsionnyy-forum-kazakhstan-kitay/">Kazakh Invest said</a>. Bilateral trade was $48.7 billion last year. The forum followed agreements reached at a Kazakhstan and China round table in Shanghai on 16 July.</p>
<p>The forum documents are a mix of agreements and project accords rather than financing contracts, and none of the three wind projects has published a capital cost, offtake tariff or construction schedule.</p><p><a href="https://corridorminerals.com/news/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan signs $730m deal for 1,000 MW Kostanay wind plant with storage</title><link>https://corridorminerals.com/news/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage</guid><pubDate>Tue, 27 Oct 2026 00:00:00 +0000</pubDate><description>The deal is the only energy agreement the government listed from the Shymkent roundtable and gives no storage size, buyer, tariff or start date.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage.jpg?v=f2797725" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, wind power, $730m agreement for 1 GW Kostanay wind plant</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage.jpg?v=f2797725" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage.jpg?v=f2797725" length="125552" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's Ministry of Energy and Turan Wind Energy LLP have signed an investment agreement for the construction of a 1,000 MW wind power plant with energy storage in Kostanay region for $730 million, <a href="https://primeminister.kz/en/news/olzhas-bektenov-attended-the-9th-kazakhstan-global-investment-roundtable-in-shymkent-48-billion-worth-of-documents-signed-32023">the government's press service said on 22 October</a>.</p>
<p>The agreement was one of 22 documents worth $4.8 billion signed on the sidelines of the 9th Kazakhstan Global Investment Roundtable (KGIR) in Shymkent, an event listed in <a href="https://corridorminerals.com/news/week-ahead-2026-10-19-c5-1-samarkand-kgir-shymkent">The Week Ahead</a>. The release does not say whether any money has been committed, how the plant would be financed or who owns the developer.</p>
<p>The government listed 11 of the 22 documents, "among others": three investment agreements, seven memorandums and one framework agreement. The wind plant is the largest of the three investment agreements, ahead of an intelligent road control system for $249.6 million and a glass container plant in Aktobe for $150 million. On Offtake's arithmetic, it accounts for about 65 per cent of the $1.13 billion that the three carry. The memorandums, which include a $1 billion multifunctional terminal in the first phase of the Kuryk port development, are a different instrument and are not added here.</p>
<p>The release gives no storage capacity or duration, turbine supplier, site, construction schedule or grid connection, and does not say to whom or under what contract the power would be sold. The stated value works out at about $730,000 per megawatt of wind capacity with the storage included, on simple division; the release does not break the sum down.</p>
<h2>A mining region, no named buyer</h2>
<p>Kostanay is a mining region. Eurasian Resources Group's Aluminium of Kazakhstan mines bauxite in Kostanay and Pavlodar regions for its alumina plant in Pavlodar, as Corridor Minerals reported from <a href="https://corridorminerals.com/news/aluminium-of-kazakhstan-taunsor-bauxite-deposit-2028">the company's Taunsor plans</a>. The government's release does not link the wind plant to any industrial user. Some earlier wind agreements have been explicit about industry: one of the documents signed at the Kazakhstan and China investment forum in September paired a wind farm with a new aluminium smelter in Abai region, as <a href="https://corridorminerals.com/news/kazakhstan-china-forum-2-45gw-wind-aluminium-smelter-zhetysu-akmola">reported here</a>.</p>
<p>Wind also featured before the roundtable's plenary session, when Prime Minister Olzhas Bektenov reviewed projects including the construction of the Masdar wind power plant in Zhambyl region and China Energy renewable energy facilities in Karaganda and Turkestan regions, according to the same release. Masdar's chief executive officer, Mohamed Jameel Al Ramahi, and the president of Sarens Kazakhstan, Ludo Anton Sarens, spoke at the plenary, and the release cites Air Liquide among foreign companies with projects in Kazakhstan, saying it is developing the hydrogen industry. It gives no capacity or value for the Masdar and China Energy projects, or for Air Liquide's hydrogen work.</p>
<h2>Thermal power and grid equipment</h2>
<p>Bektenov also met Naci Agbal, chief executive officer and chairman of the executive committee of Aksa Energy, whose combined-cycle power plant in Kyzylorda, worth 215 billion tenge, has an electric capacity of 240 MW and a thermal capacity of 277 Gcal/h and was put into commercial operation in June, <a href="https://primeminister.kz/en/news/kgir-2026-olzhas-bektenov-discussed-joint-project-implementation-with-foreign-investors-32024">the government said</a>. The company's further investment plans in Kazakhstan were reviewed, but no new project was named.</p>
<p>Some of the equipment for new plants is made in Shymkent. Asia Trafo LLP, whose chairman of the board, Dauirbek Ateyev, showed the prime minister its production at the Tassai industrial zone, has a design capacity of over 12 thousand MVA a year, which meets up to 90 per cent of Kazakhstan's demand for the main types of substation equipment with voltage classes up to 500 kV, <a href="https://primeminister.kz/en/news/olzhas-bektenov-reviews-industrial-development-of-shymkent-and-inspected-work-to-improve-road-quality-32025">the government said</a>. It supplies the combined-cycle power plant in Turkestan region and delivers transformers to new thermal power plants and power stations. Bektenov instructed the ministries of industry and construction, energy and foreign affairs and the Shymkent city administration to support the expansion of plants in the city's industrial zones.</p>
<p>The government has not published the text of the wind agreement. A site allocation, a grid connection decision or a disclosure by the developer would be the first document to show who is building the plant and when; the release gives no date for any of them.</p><p><a href="https://corridorminerals.com/news/kazakhstan-730m-investment-agreement-1000-mw-kostanay-wind-storage">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazakhstan and Uzbekistan supplied about a third of US and EU uranium</title><link>https://corridorminerals.com/news/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025</link><guid isPermaLink="true">https://corridorminerals.com/news/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025</guid><pubDate>Mon, 26 Oct 2026 00:00:00 +0000</pubDate><description>EIA and Euratom data for 2025 show Uzbekistan&#x27;s EU volume up more than sixfold, while Kazatomprom reports higher output, flat sales and rising costs.</description><category>Energy Transition</category><dc:creator>Assay</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025.jpg?v=d988b131" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uranium Supply, Central Asia supplied a third of US and EU uranium</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025.jpg?v=d988b131" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025.jpg?v=d988b131" length="132398" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan and Uzbekistan together supplied 35 per cent of the uranium delivered to US civilian reactor owners in 2025 and 30.7 per cent of natural uranium bought by EU utilities, <a href="https://www.eia.gov/uranium/marketing/">US Energy Information Administration</a> (EIA) and <a href="https://euratom-supply.ec.europa.eu/activities/market-observatory_en">Euratom Supply Agency</a> (ESA) data show.</p>
<p>Kazatomprom's first-half results, <a href="https://www.kazatomprom.kz/en/media/view/Kazatomprom%20announces%201H2026%20Financial%20Results">published on 21 August</a>, show output up, sales slightly lower and costs sharply higher. This note sets the buyer-side and producer-side figures together.</p>
<h2>What US and EU buyers received in 2025</h2>
<p>US owners and operators of civilian reactors bought 46.9 million pounds of U3O8 equivalent in 2025, down 16 per cent from 55.9 million pounds in 2024, at a weighted-average price of $58.46 a pound, up 11 per cent, <a href="https://www.eia.gov/uranium/marketing/">the EIA report shows</a>. By country of origin, Canada supplied 32 per cent of total deliveries, Kazakhstan 28 per cent, Australia 15 per cent, Uzbekistan 7 per cent, the United States 7 per cent and Namibia 4 per cent. The EIA gives the shares as proportions of deliveries, not purchases, and its page notes a re-release on 13 August with a revision notice that does not describe the changes.</p>
<p>EU utilities purchased 14,678 tonnes of uranium (tU) in 147 deliveries, up 4.94 per cent on 2024, the <a href="https://euratom-supply.ec.europa.eu/activities/market-observatory_en">ESA data show</a>. Canada supplied 5,384 tU (36.68 per cent), Kazakhstan 2,981 tU (20.31 per cent), Russia 2,346 tU (15.98 per cent), Uzbekistan 1,522 tU (10.37 per cent) and Australia 1,379 tU (9.39 per cent). Against 2024, Kazakhstan's volume fell 12.11 per cent while Uzbekistan's rose 511.83 per cent, more than sixfold, and Russia's rose 7.37 per cent. Backing out the 2024 base from those changes, the two Central Asian suppliers' combined volume rose about 24 per cent and their combined share moved from about 26 per cent to about 31 per cent (a Data Desk calculation).</p>
<h2>Prices: contracts lag the spot market</h2>
<p>The ESA's 2025 indices put the spot price at $70.33 a pound, up 31 per cent, and the multiannual price at $54.70, down 8 per cent, <a href="https://euratom-supply.ec.europa.eu/activities/market-observatory_en">it reports</a>, which leaves spot about 29 per cent above the long-term contract average (a Data Desk calculation). Kazatomprom's group average realised price for the first half of 2026 was $67.88 a pound, up 16 per cent, against an average month-end spot price of $86.83, up 25 per cent, a gap of about 28 per cent (a Data Desk calculation), <a href="https://www.kazatomprom.kz/en/media/view/Kazatomprom%20announces%201H2026%20Financial%20Results">its results show</a>. The company noted that some long-term contracts include fixed pricing components, including price ceilings, agreed in a different pricing environment. The periods and bases differ, so the two sets are not like for like.</p>
<h2>Producer side in 2026</h2>
<p>Kazatomprom produced 13,291 tU on a 100 per cent basis in the first half, up 9 per cent, while group sales were 7,586 tU, down 1 per cent, and KAP-basis sales fell 13 per cent to 6,083 tU, which the company attributed to delivery timing and customer schedule changes. Group finished-goods inventory rose 23 per cent to 8,245 tU, <a href="https://www.kazatomprom.kz/en/media/view/Kazatomprom%20announces%201H2026%20Financial%20Results">according to the release</a>. Production guidance for 2026 is unchanged at 27,500 to 29,000 tU on a 100 per cent basis.</p>
<p>Costs moved the other way. The attributable C1 cash cost rose 37 per cent to $24.48 a pound and the all-in sustaining cost rose 25 per cent to $38.45, with the company citing a rise in the mineral extraction tax rate from 9 per cent to 12.4 per cent, higher sulphuric acid costs and a stronger tenge, <a href="https://www.kazatomprom.kz/en/media/view/Kazatomprom%20announces%201H2026%20Financial%20Results">the release says</a>. It raised its 2026 all-in sustaining cost guidance to $39.00 to $40.50 a pound from $35.00 to $36.50 and cut group uranium revenue guidance to 1,900 to 2,000 billion tenge from 2,075 to 2,175 billion. It also said commissioning of its TQZ sulphuric acid plant, originally planned for the first quarter of 2027, is now expected between the third quarter of 2027 and the first quarter of 2028, after earthworks uncovered possible palaeontological finds.</p>
<p>The Times of Central Asia, in a <a href="https://timesca.com/kazatomprom-secures-new-uranium-block-as-nuclear-demand-expands/">25 September report</a> citing Kazatomprom's 21 September announcement, said Kazatomprom won six-year exploration rights to the Kyzyltu block in Kyzylorda region, with preliminary resources of about 10,000 tonnes, and that Russian measures from 12 September changed export approval procedures for sulphuric acid through the end of 2026 without banning exports. It said Kazatomprom did not expect a material effect on 2026 operations.</p>
<p>The data are by country of origin, not by supplier or contract type, so they do not show how much of Kazakhstan's and Uzbekistan's volumes reach buyers under long-term contracts. The sources also do not explain the sharp rise in Uzbekistan's EU volume.</p><p><a href="https://corridorminerals.com/news/kazakhstan-uzbekistan-third-of-us-eu-uranium-deliveries-2025">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Azerbaijan has one power export link under way, two studied and one open</title><link>https://corridorminerals.com/news/azerbaijan-four-power-export-links-under-way-studied-open</link><guid isPermaLink="true">https://corridorminerals.com/news/azerbaijan-four-power-export-links-under-way-studied-open</guid><pubDate>Mon, 26 Oct 2026 00:00:00 +0000</pubDate><description>On the minister&#x27;s figures, a 1 GW Nakhchivan line to Türkiye leads; a Central Asian study is due in May 2027 and a Bulgarian route awaits signing.</description><category>Energy Transition</category><dc:creator>Drill Core</dc:creator><media:content url="https://corridorminerals.com/img/covers/azerbaijan-four-power-export-links-under-way-studied-open.jpg?v=5d1a7fd7" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Azerbaijan power links, Azerbaijan has one power link under way, two studied</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/azerbaijan-four-power-export-links-under-way-studied-open.jpg?v=5d1a7fd7" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/azerbaijan-four-power-export-links-under-way-studied-open.jpg?v=5d1a7fd7" length="136648" type="image/jpeg"/><content:encoded><![CDATA[<p>Azerbaijan is pursuing four electricity interconnection projects with partner countries, meant to connect the power systems of Central Asia, the South Caucasus and Europe, Minister of Energy Parviz Shahbazov said at a World Bank meeting on 22 October, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00928">the ministry reported</a>.</p>
<p>An article he wrote for Power Engineers' Day in the Azerbaijan newspaper, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00919">reproduced in Azerbaijani on the ministry's website on 20 October</a>, sets out where each stands. This explainer sorts them into what is under way, what is being studied and what is still open, using the minister's figures.</p>
<p>The links start from a system of 10,072.5 MW, of which 7,903 MW is at 24 thermal plants, the article says. Renewable plants including hydropower total 2,169.6 MW, about 21.5 per cent, against targets of 33.3 per cent of installed capacity by 2027 and 38.7 per cent by 2030. Renewables supplied 20 per cent of the 21.2 billion kWh generated in the first nine months of 2026, against 13.4 per cent of 28.7 billion kWh last year.</p>
<p>About $2.6 billion is to be invested in renewable projects and grid development by 2027, of which $600 million goes directly to grid infrastructure, the minister writes. Grid capacity rose by 1,540 MVA over the past year to 31,429.9 MVA, and the country installed its first battery storage this year, 250 MW with 500 MWh of capacity. For business users, connections of non-residential consumers to the grid are now handled exclusively online, <a href="https://minenergy.gov.az/en/xeberler-arxivi/elektrik-techizati-sebekelerine-qosulma-isci-qrupunun-iclasi-kecirilib_11353">the ministry said on 21 October</a>.</p>
<h2>Under way: the Nakhchivan line to Türkiye</h2>
<p>The link with the most hardware in place is the Azerbaijan-Türkiye-Europe Energy Corridor through Nakhchivan, whose first phase would carry 1 GW from Nakhchivan to Türkiye. A 330 kV substation at Jabrayil has been built and connected to the national grid. The next phase is a new 330 kV substation in Nakhchivan, linked to Jabrayil by lines able to carry 1,000 MW. Work on the Jabrayil to Aghband line is nearly complete, construction continues on the section from the Armenian border to Nakhchivan, and the foundation of the Nakhchivan substation has been laid. A 400 kV converter substation and further lines would come last. The article says completing the link through the Trump Route for International Peace and Prosperity (TRIPP) could create a Central Asia-Azerbaijan-Türkiye energy bridge. Nakhchivan's own renewable capacity is 108 MW, about a tenth of the planned first-phase transfer, on Drill Core's arithmetic.</p>
<h2>Being studied: the Black Sea cable and the Central Asian link</h2>
<p>The Caspian-Black Sea-Europe Green Energy Corridor, planned with Georgia, Romania and Hungary at up to 4 GW, has a completed feasibility study, whose key findings the consultancy CESI <a href="https://minenergy.gov.az/en/xeberler-arxivi/00922">presented at a forum in Baku on 22 October</a>. The minister's article adds that Türkiye joining the project is under consideration and that the application for the EU's Project of Mutual Interest status is nearing completion. A final investment decision is planned for 2029.</p>
<p>The Central Asia-Azerbaijan Green Energy Corridor would link the power systems of Azerbaijan, Kazakhstan and Uzbekistan directly for the first time. Its feasibility study is being prepared by Italy's CESI S.p.A. with support from the Asian Development Bank and the Asian Infrastructure Investment Bank, and is expected to be completed in May 2027; $2 million has been allocated to its first stage, the article says. That makes CESI the consultant on both studied links. The lenders' earlier steps on this route are covered in <a href="https://corridorminerals.com/news/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors">Corridor Minerals' report on the AIIB grants</a> and <a href="https://corridorminerals.com/news/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline">its report from the CAREC ministerial</a>.</p>
<h2>Still open: the Bulgarian route and the supply</h2>
<p>The fourth link, between Azerbaijan, Georgia, Türkiye and Bulgaria, is at the signing stage: an intergovernmental agreement on developing and transmitting green energy, and a shareholders' agreement to set up a joint venture, are expected to be signed soon, the minister writes, without giving a date, a capacity or a cost.</p>
<p>The power to fill the links is also still being lined up. Of 11 solar and wind plants with 2 GW of capacity planned in the first phase, three with 570 MW are operating, two solar plants with 470 MW between them are due by the end of 2026 and five with 680 MW in 2027, while Masdar's 200 MW wind project is under way. An implementation agreement with Clean Energy Capital LLC covers 600 MW of offshore wind in the Caspian, 200 MW of it in an initial phase. The 8 GW of solar and wind planned by 2032 is meant for domestic demand, including data centres, and for export.</p>
<p>On hydrogen, an implementation plan for the national hydrogen strategic vision document is being prepared, and three possible pilot projects, for sustainable aviation fuel, green methanol and green fertiliser, are being studied, the article says.</p>
<p>The article does not give the cost of any of the four links or say who would finance the Nakhchivan line and its converter substation. It does not say how much power Kazakhstan and Uzbekistan would send west, and at what price, or when the agreements on the Bulgarian route would be signed.</p>
<p>The next dated milestones are the Central Asian feasibility study, due in May 2027, and the Black Sea link's final investment decision, planned for 2029.</p><p><a href="https://corridorminerals.com/news/azerbaijan-four-power-export-links-under-way-studied-open">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Kazchrome&#x27;s Aktobe smelter installs boilers for 80 MW furnace-gas station</title><link>https://corridorminerals.com/news/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw</link><guid isPermaLink="true">https://corridorminerals.com/news/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>The ERG plant expects up to 532 million kWh a year from ferrochrome off-gas once the station is commissioned in 2027; no cost has been published.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw.jpg?v=9592a4bb" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, ferroalloys, Aktobe smelter builds 80 MW furnace-gas station</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw.jpg?v=9592a4bb" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw.jpg?v=9592a4bb" length="123160" type="image/jpeg"/><content:encoded><![CDATA[<p>The Aktobe Ferroalloys Plant in western Kazakhstan, owned by <a class="hub-link" href="https://corridorminerals.com/eurasian-resources-group">ERG</a>'s TNC Kazchrome JSC, has begun installing two high-pressure steam boilers for an 80 MW power station that will run entirely on gas from ferrochrome smelting, a <a href="https://www.erg.kz/ru/news/show/3875">report ERG republished on 6 October 2026</a> said.</p>
<p>The report, first published by <a href="https://kz.kursiv.media/2026-10-05/bolshaya-strojka-bolshoj-energii/">Kursiv on 5 October</a>, gives the station a maximum capacity of 87 MW and planned output of up to 532 million kWh a year. The project turns a smelting by-product into power for the smelter itself. Instead of being disposed of, the furnace gas will be burned to generate electricity for the plant, which will burn more than 80 thousand cubic metres of the gas an hour, <a href="https://www.erg.kz/ru/news/show/3875">the ERG text says</a>. Construction started at the end of 2025 and the station is scheduled to be finished and commissioned in 2027, the report says.</p>
<p>The plant is the older of Kazchrome's two ferroalloy smelters. ERG's <a href="https://www.erg.kz/en/enterprises/ao-transnacionalnaia-kompaniia-kazxrom">page on Kazchrome</a> says it produces more than 700 thousand tonnes of ferroalloys a year and that its smelting shop No. 4, opened in 2014, has four direct-current furnaces rated at 72 MW each, now operating at 75 MW with a prospect of moving to 80 MW. The new station's design capacity is therefore about the size of one of those furnaces, a comparison the company does not make.</p>
<h2>What is on site</h2>
<p>Work is running on several parts of the station at once, <a href="https://www.erg.kz/ru/news/show/3875">the report says</a>. Besides the two boilers, the main building and turbine hall are going up, along with a gasholder, a cooling tower and an 80-metre chimney, and utility networks and electrical systems are being installed. The boilers, generator, condenser, pumps and other large items have been delivered; the turbine, electrical systems and automation are the next stage.</p>
<p>The plant's main step-down substation, GPP-2, is being rebuilt so that the station can be tied into the works' power system, the report says. Project coordination sits with ERG's energy division and the smelter's own engineers, and the international inspection company Bureau Veritas checks the quality of the main equipment at the manufacturers' works, <a href="https://kz.kursiv.media/2026-10-05/bolshaya-strojka-bolshoj-energii/">Kursiv reported</a>. A priority for the coming months is to close the building envelope so that installation and commissioning work can continue through the winter.</p>
<h2>Carbon and market access</h2>
<p>Kudrat Shamiyev, chief executive of ERG in Kazakhstan, said that the carbon footprint of products was becoming more important alongside quality and price and was now an important condition of access to world markets, and described the station as an example of the group using secondary energy to generate its own power while reducing its environmental impact, <a href="https://www.erg.kz/ru/news/show/3875">the Russian-language report says</a>. Artem Pirozhkov, chief engineer of the project, said the station would become an important part of the plant's energy system once running, <a href="https://kz.kursiv.media/2026-10-05/bolshaya-strojka-bolshoj-energii/">Kursiv reported</a>.</p>
<p>The <a href="https://www.erg.kz/ru/news/show/3875">planned output</a> of 532 million kWh a year is equivalent to the station running at about 76 per cent of its 80 MW design capacity across a full year, on Headframe's arithmetic (80 MW multiplied by 8,760 hours gives 700.8 million kWh). That is a high load factor, which fits a station fed by a continuous by-product stream rather than by wind or sun.</p>
<h2>What the report does not say</h2>
<ul>
<li>The capital cost of the station, or how it is financed.</li>
<li>The name of the EPC contractor, which the report mentions without naming.</li>
<li>How much of the plant's electricity demand the station will cover, or how much it will cut the plant's purchases from the grid.</li>
<li>Any estimate of the reduction in carbon dioxide emissions.</li>
</ul>
<p>The report also does not say whether a similar unit is planned at Kazchrome's larger Aksu plant in Pavlodar region, which ERG's <a href="https://www.erg.kz/en/enterprises/ao-transnacionalnaia-kompaniia-kazxrom">Kazchrome page</a> describes as producing more than 1 million tonnes of products a year. The next milestone named in the report is installation of the turbine, ahead of commissioning in 2027.</p><p><a href="https://corridorminerals.com/news/kazchrome-aktobe-ferroalloy-gas-power-station-80-mw">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Samruk-Energy and Oman&#x27;s O-GREEN sign accord to develop 2 GW of solar and wind</title><link>https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement</link><guid isPermaLink="true">https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>The framework, signed during the Omani sultan&#x27;s state visit, targets industrial users and data centres but names no sites, cost or timetable.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/samruk-energy-o-green-oman-2-gw-renewables-agreement.jpg?v=4a19da37" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, renewables, Samruk-Energy and O-GREEN plan 2 GW of renewables</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/samruk-energy-o-green-oman-2-gw-renewables-agreement.jpg?v=4a19da37" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/samruk-energy-o-green-oman-2-gw-renewables-agreement.jpg?v=4a19da37" length="122836" type="image/jpeg"/><content:encoded><![CDATA[<p>Samruk-Energy JSC, Kazakhstan's state-owned power holding, has signed a strategic cooperation agreement with Oman's O-GREEN to develop solar and wind projects with a total installed capacity of about 2 GW, with energy storage, in Kazakhstan, Central Asia and other markets, according to a <a href="https://samruk-energy.kz/en/press-center/news/2928-samruk-energy-and-o-green-sign-agreement-to-jointly-develop-2-gw-of-renewable-energy-projects">Samruk-Energy statement dated 6 October 2026</a>. The agreement was signed during the state visit of Oman's Sultan Haitham bin Tarik to Kazakhstan.</p>
<p>The projects are aimed at the wholesale electricity market, industrial consumers and data centres, including through arrangements that would supply renewable power around the clock, <a href="https://samruk-energy.kz/en/press-center/news/2928-samruk-energy-and-o-green-sign-agreement-to-jointly-develop-2-gw-of-renewable-energy-projects">the statement says</a>. That points to storage sized for firm supply rather than only for grid balancing, although the statement gives no storage capacity.</p>
<p>O-GREEN will contribute project development work and technical expertise, while Samruk-Energy will handle engagement with its subsidiaries, government bodies, the power system operator and potential offtakers in Kazakhstan, <a href="https://samruk-energy.kz/en/press-center/news/2928-samruk-energy-and-o-green-sign-agreement-to-jointly-develop-2-gw-of-renewable-energy-projects">according to the statement</a>. Samruk-Energy describes O-GREEN as Oman's global platform for green energy, technology and digital infrastructure, specialising in renewable energy and infrastructure for artificial intelligence.</p>
<p>Ansar Aidarov, Samruk-Energy's chief investment officer, said the focus should be on projects that are "technically sound, commercially viable and aligned with the needs of the power systems in which they are implemented", <a href="https://samruk-energy.kz/en/press-center/news/2928-samruk-energy-and-o-green-sign-agreement-to-jointly-develop-2-gw-of-renewable-energy-projects">the statement shows</a>.</p>
<p>The Oman agreement is the second large renewable framework Samruk-Energy has signed in less than two weeks. On 25 September, at the Kazakhstan and China investment forum, it agreed with China Energy Overseas Investment and Sany Renewable Energy to jointly develop wind plants with a total capacity of 1 GW, <a href="https://samruk-energy.kz/en/press-center/news/2911-samruk-energy-and-chinese-companies-agree-to-develop-1-gw-wind-power-project">according to an earlier Samruk-Energy statement</a>. Taken together, the two documents cover about 3 GW of planned capacity, an Offtake sum, but part of the Oman portfolio may be built outside Kazakhstan.</p>
<p>The <a href="https://samruk-energy.kz/en/press-center/news/2928-samruk-energy-and-o-green-sign-agreement-to-jointly-develop-2-gw-of-renewable-energy-projects">6 October statement</a> gives no investment figure, no site, no split between solar and wind, no timetable and no indication of which industrial consumers might take the power. It does not say whether any of the capacity would be offered through the government's renewable auctions or sold directly to large users.</p>
<p>A project list or a site allocation would be the first document showing where the 2 GW is to be built; the statement gives no date for either.</p><p><a href="https://corridorminerals.com/news/samruk-energy-o-green-oman-2-gw-renewables-agreement">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>EBRD weighs €70m for Voltalia&#x27;s 100 MW battery plant in Uzbekistan</title><link>https://corridorminerals.com/news/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan</link><guid isPermaLink="true">https://corridorminerals.com/news/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>Three project documents disclosed on 9 October put the battery&#x27;s cost at up to €83m; board consideration is set for 16 December.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan.jpg?v=68f6e44b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan, battery storage, EBRD weighs €70m for Bukhara battery plant</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan.jpg?v=68f6e44b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan.jpg?v=68f6e44b" length="122219" type="image/jpeg"/><content:encoded><![CDATA[<p>The European Bank for Reconstruction and Development (EBRD) is considering up to €70.2 million of financing for a 100 MW, 200 MWh battery storage plant in Uzbekistan's Bukhara region sponsored by France's Voltalia, three project summaries the bank disclosed on 9 October 2026 show.</p>
<p>The largest is a <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56135.html">senior loan of up to €52 million</a> to Artemisya BESS FE LLC, a special purpose company wholly owned by Voltalia, against a total project cost of up to €83 million. The bank's board is scheduled to consider the loans on 16 December 2026.</p>
<p>The other two facilities are smaller and guaranteed by the sponsor: up to <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56136.html">€8.2 million to pay value added tax</a> during construction, and up to <a href="https://www.ebrd.com/home/work-with-us/projects/psd/57523.html">€10 million for the electrical interconnection</a> that will connect the batteries to the grid. Together with the senior loan they add up to €70.2 million, an Offtake sum of the three documents. The senior loan includes an unfunded partial guarantee from the European Union under its European Fund for Sustainable Development Plus (EFSD+) HiiBar programme, <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56135.html">the bank says</a>.</p>
<p>The project is a test of storage in a system still dominated by thermal plants. The EBRD expects the batteries to provide ancillary services and stabilise the grid so that more intermittent wind and solar can be connected, in a country that it describes as highly reliant on thermal power generation, <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56135.html">the summary says</a>. The bank calls Uzbekistan a relatively new and developing market for battery storage.</p>
<h2>Part of a wider Voltalia complex</h2>
<p>The battery is one piece of a larger programme. The environmental and social summary describes the plant and a 15 km, 220 kV transmission line as part of a wider programme comprising a 300 MW wind farm, a 100 MW solar plant and a further 55 km of line, <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56135.html">the EBRD says</a>. The documents do not say whether the EBRD will finance the wind and solar plants, or who will buy their output.</p>
<p>The bank has classified the project as Category A, its highest environmental and social risk rating, because of potentially substantial and cumulative impacts. Baseline studies carried out in 2024, 2025 and 2026 identified 29 bird species as priority biodiversity features, with moderate risk of collision with the transmission line for 20 of them, <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56135.html">the summary says</a>. Land acquisition will cause economic displacement from agricultural land along the line and at the generation sites, and a livelihood restoration plan is being prepared.</p>
<p>The environmental and social impact assessment package was published on the bank's and sponsor's websites on 17 August 2026 for a 60-day consultation before board consideration, and a public hearing on the project location was held in September 2026, <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56135.html">the bank says</a>. Due diligence on the battery supply chain is still under way and the summary will be updated when it is complete. The EBRD gives the project a transition impact score of 65.</p>
<h2>Bukhara's other wind project</h2>
<p>Voltalia's complex is not the only large renewable development in the region with development bank money. In May 2026 the Asian Development Bank signed a $116 million financing package with Acwa for a separate 300 MW wind plant in Bukhara region, to be built, operated and transferred under a public-private arrangement, <a href="https://www.adb.org/news/adb-acwa-sign-116-million-financing-expand-wind-power-boost-clean-energy-and-resilience-uzbekistan">the ADB said</a>.</p>
<p>The EBRD also links the battery project to training. The <a href="https://www.ebrd.com/home/work-with-us/projects/psd/56136.html">summary for the VAT facility</a> says Voltalia will introduce a nationally accredited training programme for young people entering the labour market in Bukhara region and support an outreach campaign to attract women into the energy sector.</p>
<h2>What the documents do not say</h2>
<ul>
<li>The tenor and pricing of the loans, or whether other lenders will join.</li>
<li>Who will pay the battery operator, and under what contract, for the ancillary services it provides.</li>
<li>When construction will start or when the batteries are due to come online.</li>
<li>Where the battery cells will be sourced, pending the supply chain review.</li>
</ul>
<p>The next document is the EBRD board decision scheduled for 16 December 2026.</p><p><a href="https://corridorminerals.com/news/ebrd-voltalia-artemisya-battery-storage-bukhara-uzbekistan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Caspian-Black Sea-Europe power link study goes to investors</title><link>https://corridorminerals.com/news/caspian-black-sea-europe-power-link-feasibility-study-investors-baku</link><guid isPermaLink="true">https://corridorminerals.com/news/caspian-black-sea-europe-power-link-feasibility-study-investors-baku</guid><pubDate>Sun, 25 Oct 2026 00:00:00 +0000</pubDate><description>The 4 GW link would be commissioned in phases from 2032, but no financing or power purchase deal was reported and a final decision is planned for 2029.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/caspian-black-sea-europe-power-link-feasibility-study-investors-baku.jpg?v=8032574f" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Caspian power link, Black Sea power link study goes to investors</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/caspian-black-sea-europe-power-link-feasibility-study-investors-baku.jpg?v=8032574f" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/caspian-black-sea-europe-power-link-feasibility-study-investors-baku.jpg?v=8032574f" length="127750" type="image/jpeg"/><content:encoded><![CDATA[<p>The results of the feasibility study for the Caspian-Black Sea-Europe Green Energy Corridor were presented for the first time to international investors, financial institutions and business partners at a forum in Baku on 22 October, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00932">Azerbaijan's energy ministry said</a>.</p>
<p>The ministry's accounts of the day report no financing, equity or power purchase agreement. Participants agreed next steps on a partnership roadmap and on the final investment decision, which is planned for 2029.</p>
<p>The corridor, initiated under a strategic partnership agreement that Azerbaijan, Georgia, Romania and Hungary signed in Bucharest in 2022, would be about 3,000 kilometres long, be commissioned in phases from 2032 and reach a transmission capacity of 4 GW, the ministry said. The feasibility study, completed in July, says the project would facilitate the development of at least 8 GW of renewable capacity in the region and carry about 20 billion kWh of electricity a year to Europe from 2040. That volume equals running a 4 GW link at about 57 per cent of its capacity all year, on Offtake's arithmetic. The Black Sea cable would be laid at depths of up to 2,200 metres.</p>
<p>The business model under consideration is a hybrid of regulated and commercial components, based on long-term power purchase agreements, private equity and cross-border electricity trade. The ministry said the project's inclusion in the draft Ten-Year Network Development Plan (TYNDP) 2026 and its work towards Project of Mutual Interest status were strengthening its investment prospects. "Our objective is to transform the Green Energy Corridor into a regional infrastructure project with a clear business model, a sustainable financial structure and attractive conditions for investors," said Minister of Energy Parviz Shahbazov. Earlier in October, Azerbaijan had held <a href="https://corridorminerals.com/news/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors">talks with European and British partners on the corridor</a>.</p>
<h2>Lenders and buyers at one table</h2>
<p>A financing roundtable moderated by the World Bank brought together the European Investment Bank, the EBRD, the Asian Development Bank, the Black Sea Trade and Development Bank and Brookfield Asset Management to discuss financing models, risk sharing and ways of combining public and private money, the ministry's summary says. In a separate session, MVM, Transelectrica, Masdar, ACWA Power and PowerChina discussed demand for green electricity in European markets and long-term power purchase agreements. Marsh McLennan, Straife, Gala Insurance, PASHA Insurance and KPMG covered risk, insurance and bankability.</p>
<p>In side meetings with Shahbazov, three companies set out roles they could play. James Humfrey, chief executive officer of the British company Xlinks, expressed interest in supporting project development, making joint investments and participating with the company's own funds during the development phase, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00931">the ministry said</a>. Proposals to optimise capital expenditure, shorten implementation and make the electricity delivered to European markets more competitive were submitted at the meeting, and the hybrid financing model's compatibility with the EU's regulatory framework was reviewed. The ministry said the inclusion of a fibre-optic connection in the corridor widens energy and digital cooperation.</p>
<p>Zhero, whose managing director Michele Vadora met the minister, presented plans to form a buyer portfolio for long-term electricity procurement, its access to European markets and its experience with the Medlink projects that will connect North Africa with Italy, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00930">according to the ministry</a>. The meeting reviewed supplying green power to Central Europe and neighbouring markets, including the southern regions of Germany, and the opportunities of the EU's Project of Mutual Interest status. Zhero expressed interest in a partnership.</p>
<p>On the generation side, a delegation led by Zhao Yongli, chairman of China Datang Overseas Investment Co., Ltd., discussed the status of a 100 MW solar plant project in Azerbaijan and the possibility of a 200 MW offshore wind plant in an initial phase, and said the company would explore taking part in the corridor, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00927">the ministry said</a>. No agreement was reported from any of the three meetings.</p>
<h2>Technical support and cables</h2>
<p>The World Bank's technical support for green energy corridors covers the regulatory environment in the participating countries, electricity demand and supply, cross-border transmission capacity, business models and financing options, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00928">the ministry said</a> after Shahbazov met Stephanie Gil, the bank's energy practice manager for the Europe and Central Asia region. The minister told her that Azerbaijan's four interconnection projects with partner countries aim to connect the power systems of Central Asia, the South Caucasus and Europe. A separate power link across the Caspian to Kazakhstan and Uzbekistan has drawn interest from the Asian Development Bank, as <a href="https://corridorminerals.com/news/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline">reported from the CAREC ministerial</a>.</p>
<p>In the technology session, Siemens Energy, Jan De Nul, Prysmian, NKT, ZTT, Hengtong, Hellenic Cables and Orient Cable discussed high-voltage direct current technology, the production and installation of subsea cables and supply chain capabilities. Jan De Nul presented a cable technology for depths of more than 4,000 metres which, the ministry says, has passed tests and could be used on the corridor if an appropriate financing mechanism is in place.</p>
<h2>What the documents do not say</h2>
<ul>
<li>The corridor's capital cost, or how it would be shared among the four countries.</li>
<li>Which companies or funds would hold equity in the cable, and on what terms.</li>
<li>Who would buy the 20 billion kWh a year, and at what price.</li>
<li>Which renewable plants would feed the link.</li>
</ul>
<p>The ministry gave no date for the partnership roadmap; the next dated step is the final investment decision planned for 2029.</p><p><a href="https://corridorminerals.com/news/caspian-black-sea-europe-power-link-feasibility-study-investors-baku">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>ADB plans over $7.5bn for CAREC corridors, with a $1.5bn energy pipeline</title><link>https://corridorminerals.com/news/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline</link><guid isPermaLink="true">https://corridorminerals.com/news/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline</guid><pubDate>Sat, 24 Oct 2026 00:00:00 +0000</pubDate><description>Ministers in Ulaanbaatar marked $60.2bn of CAREC investment; ADB is also exploring a Caspian power link between Azerbaijan, Kazakhstan and Uzbekistan.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline.jpg?v=acb61ebd" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: CAREC, energy finance, ADB lines up $7.5bn for CAREC corridors to 2030</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline.jpg?v=acb61ebd" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline.jpg?v=acb61ebd" length="128025" type="image/jpeg"/><content:encoded><![CDATA[<p>The Asian Development Bank (ADB) plans to provide over $7.5 billion through 2030 for new-generation economic corridors in the Central Asia Regional Economic Cooperation (CAREC) region, with an energy pipeline expected to reach about $1.5 billion by 2030, <a href="https://www.adb.org/news/carec-marks-25-years-over-60-billion-investment">it said on 29 September</a>.</p>
<p>The energy figure is modest against the size of the programme. CAREC, now an 11-country partnership that grew from five founding members, has reached $60.2 billion of cumulative investment as of August 2026, of which $19.9 billion came from ADB, <a href="https://www.adb.org/news/carec-marks-25-years-over-60-billion-investment">the bank said</a>.</p>
<p>The statement from the 25th CAREC Ministerial Conference in Ulaanbaatar says ADB also aims to catalyse around $3 billion of private sector financing. The ministers adopted a declaration setting priorities for the next phase, which ADB said would focus on easier trade and investment, better border crossings and stronger electricity and digital networks.</p>
<p>The energy pipeline is linked to ADB's Pan-Asia Power Grid Initiative, and the bank is exploring a proposed power link across the Caspian Sea involving Azerbaijan, Kazakhstan and Uzbekistan to expand trade in clean electricity, <a href="https://www.adb.org/news/carec-marks-25-years-over-60-billion-investment">the statement says</a>. It gives no list of projects, no capacity for the Caspian link and no split of the $1.5 billion by country.</p>
<h2>Committed so far</h2>
<p>ADB has committed about $3 billion since the start of 2025, roughly 30 per cent of the indicative $10 billion financing envelope through 2030 that it announced at the previous ministerial conference, <a href="https://www.adb.org/news/carec-marks-25-years-over-60-billion-investment">the statement shows</a>. That financing covers projects in Azerbaijan, Georgia, Kazakhstan, Kyrgyzstan, Pakistan, Tajikistan, Turkmenistan and Uzbekistan. The statement does not say how much of the $3 billion went to energy.</p>
<p>On transport, ADB projects under CAREC have improved more than 20,000 km of roads and railways, and the recently approved Border Upgrades for Integration, Logistics and Development (BUILD) Facility will provide up to $400 million to modernise border crossings, <a href="https://www.adb.org/news/carec-marks-25-years-over-60-billion-investment">the bank said</a>. Trade among CAREC countries was only about 5 per cent of their total trade last year, it said.</p>
<p>The conference programme ran from 28 September to 2 October and included a development partners dialogue, the ministerial meeting itself on 29 September and a business forum, according to the <a href="https://www.carecprogram.org/?event=25th-carec-ministerial-conference">CAREC programme's event page</a>.</p>
<h2>Minerals memorandums and Mongolia</h2>
<p>The meeting also produced documents on critical minerals. During the visit, ADB President Masato Kanda witnessed the signing of CAREC memorandums on capital market development, critical minerals and the establishment of a CAREC Chambers Alliance, <a href="https://www.adb.org/news/adb-president-announces-1-3-billion-planned-financing-mongolia">ADB said on 1 October</a>. The bank has not published the text of the critical minerals memorandum or named its signatories.</p>
<p>Kanda used the visit to announce plans to invest $1.3 billion in Mongolia by 2027, and ADB signed three loan agreements that week totalling $455 million, <a href="https://www.adb.org/news/adb-president-announces-1-3-billion-planned-financing-mongolia">the bank said</a>: $225 million for provincial health services, $130 million in second additional financing for education and $100 million for disaster resilience. None of the three is an energy or mining loan.</p>
<p>The corridors themselves are meant to bundle sectors rather than fund them one by one. ADB said in the <a href="https://www.adb.org/news/carec-marks-25-years-over-60-billion-investment">statement</a> that the new generation of economic corridors would bring together investments in transport, energy, digital connectivity, trade, human capital and urban development, and that the investments were intended to create bigger markets and better jobs across the region. The statement does not connect any of the planned energy projects to mines, smelters or other industrial users, and gives no breakdown of the $7.5 billion by sector.</p>
<h2>What the statements do not say</h2>
<ul>
<li>Which energy projects make up the $1.5 billion pipeline, and in which countries.</li>
<li>The text of the Ulaanbaatar declaration, which ADB summarises but does not publish in its statement.</li>
<li>Whether the proposed Caspian power link has a feasibility study, a sponsor or a timetable.</li>
</ul>
<p>The declaration and conference materials listed on the <a href="https://www.carecprogram.org/?event=25th-carec-ministerial-conference">CAREC event page</a> are the next documents to read for project-level detail.</p><p><a href="https://corridorminerals.com/news/adb-carec-ministerial-7-5bn-corridors-1-5bn-energy-pipeline">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Azerbaijan signs AIIB grants and meets EU, UK on green energy corridors</title><link>https://corridorminerals.com/news/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors</link><guid isPermaLink="true">https://corridorminerals.com/news/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors</guid><pubDate>Sat, 24 Oct 2026 00:00:00 +0000</pubDate><description>The energy ministry reports $1.1m in grants, a finished feasibility study for the Caspian-Black Sea-Europe link and a 2029 investment decision target.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors.jpg?v=f833c77e" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Energy Transition, Azerbaijan courts backers for Caspian power links</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors.jpg?v=f833c77e" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors.jpg?v=f833c77e" length="132704" type="image/jpeg"/><content:encoded><![CDATA[<p>Azerbaijan signed two grant agreements worth $1.1 million with the Asian Infrastructure Investment Bank (AIIB) on 9 October to prepare a Caspian green energy corridor and offshore wind infrastructure, the energy ministry <a href="https://minenergy.gov.az/en/xeberler-arxivi/00909">said</a>. They followed talks with the EU and the UK.</p>
<p>Those talks were an energy roundtable with the European Commission on 2 October and a joint commission meeting with the United Kingdom on 6 October, as Baku seeks investors for cross-border power links.</p>
<h2>The AIIB grants</h2>
<p>Energy Minister Parviz Shahbazov signed for the government and Konstantin Limitovskiy, AIIB's chief investment officer, for the bank, in an online meeting, <a href="https://minenergy.gov.az/en/xeberler-arxivi/00909">according to the ministry</a>. AIIB acts as implementing partner of the finance facility of the Multilateral Cooperation Center for Development Finance. A grant of $1 million will fund development of the Caspian Green Energy Corridor, which links Azerbaijan, Kazakhstan and Uzbekistan, and $100,000 will fund concept development of coastal infrastructure to support large-scale offshore wind plants in the Caspian Sea.</p>
<p>Shahbazov said the agreements support Azerbaijan's goals of large-scale Caspian offshore wind and the regional and intercontinental export of green energy, the ministry said. Limitovskiy described them as the first two grant agreements under these projects supported by the multilateral centre and as groundwork for future sustainable energy investment. The ministry gave no information on grid design, storage, generation capacity, timelines or total project cost.</p>
<h2>Brussels and Baku talks</h2>
<p>On 2 October a business roundtable held as part of the High-Level Energy Dialogue in Brussels was led by Shahbazov and EU Energy and Housing Commissioner Dan Jørgensen, the ministry <a href="https://minenergy.gov.az/en/xeberler-arxivi/00901">reported</a>. Participants included Azerbaijan Renewable Energy Sources, SOCAR Green, the energy regulator, WindEurope, Siemens Energy and Vestas. The ministry said Azerbaijan plans to raise the share of wind and solar energy to 38.7 per cent by 2030 with foreign and private companies, and that the feasibility study for the Caspian-Black Sea-Europe corridor is complete and the project is moving to its next stage, with the focus on attracting investors and strategic partners. European companies were invited to the corridor, to other green energy corridors and to the next phase of renewable development starting in 2028. The page does not mention any agreements being signed or say whether the 38.7 per cent refers to capacity or generation.</p>
<p>On 6 October the eighth meeting of the Azerbaijan-UK Joint Intergovernmental Commission on Trade and Economic Cooperation took place in Baku, co-chaired by Shahbazov and a UK Minister of State for Trade, the ministry <a href="https://minenergy.gov.az/en/xeberler-arxivi/00903">said</a>. Azerbaijan aims to reach a final investment decision on the Caspian-Black Sea-Europe Green Energy Corridor by 2029 and invited UK partners to join, and the UK company Xlinks has joined as a partner, the statement said. A memorandum of understanding was signed between Xlinks and the Green Corridor Alliance. The ministry also said the 240 MW Shafag solar plant is expected to become operational next year.</p>
<p><a href="https://minenergy.gov.az/en/xeberler-arxivi/00903">The same statement</a> gave trade figures: UK investment in Azerbaijan exceeds $39 billion, bilateral trade rose 67 per cent last year, and in the first half of 2026 trade grew more than 5.5-fold to $3.6 billion, with Azerbaijan's exports to the UK up 24-fold. The commission adopted a 2026 to 2027 action plan with more than 60 actions across 10 areas.</p>
<h2>What the record shows</h2>
<p>The grants fund preparation only, and the ministry's accounts of the EU and UK meetings describe invitations and a memorandum, not financing commitments. Current output gives a sense of the starting point: wind and solar plants supplied 1,270.2 million kWh, or about 6.0 per cent of Azerbaijan's 21,190.9 million kWh of generation in January to September 2026, by <a href="https://minenergy.gov.az/en/xeberler-arxivi/00911">ministry figures</a> (the share is Offtake's calculation). The ministry has not published capacity, cost or schedule figures for either corridor in the statements reviewed.</p><p><a href="https://corridorminerals.com/news/azerbaijan-aiib-grants-eu-uk-talks-caspian-green-energy-corridors">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan commissions 300 MW wind and 100 MW storage in Karakalpakstan</title><link>https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction</guid><pubDate>Sat, 24 Oct 2026 00:00:00 +0000</pubDate><description>Construction of the 1.5 GW Kungrad wind project, valued by the government at $2.6 billion, enters its active phase with 1,500 km of high-voltage lines.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction.jpg?v=a572e740" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Energy Transition, Karakalpakstan wind: 300 MW live, 1.5 GW building</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction.jpg?v=a572e740" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction.jpg?v=a572e740" length="135942" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan has commissioned two wind plants totalling 300 MW and a 100 MW energy storage system in Karakalpakstan's Karaozyak district, and construction of a 1.5 GW wind project in neighbouring Kungrad district is entering its active phase, the <a href="https://president.uz/en/lists/view/9634">presidential website</a> reported on 18 September.</p>
<p>The Kungrad project is being built with the Saudi company ACWA, and the <a href="https://president.uz/en/lists/view/9634">presidential website</a> puts its cost at $2.6 billion. Its scope includes 1,500 km of high-voltage transmission lines, three 500 kV substations and upgrades to two more substations, <a href="https://president.uz/en/lists/view/9634">the report says</a>. It gives no completion date for Kungrad and no duration for the storage system.</p>
<h2>What the developer says</h2>
<p>ACWA Power describes Kungrad as three 500 MW wind projects, each with a 100 MW battery energy storage system, and put the investment value at $2.4 billion when it signed power purchase agreements with National Electric Grid of Uzbekistan in December 2022, its <a href="https://acwapower.com/en/media-center/latest-news/acwa-power-signs-power-purchase-and-investment-agreements-for-15gw-wind-plant-in-uzbekistan/">release</a> says, against the $2.6 billion on the presidential website. The Times of Central Asia, which <a href="https://timesca.com/karakalpakstan-investment-new-projects/">reported on the package</a> on 24 September, quoted Abid Malik, ACWA Central Asia president, as saying the company's portfolio in Karakalpakstan is about 2.3 GW and around $4 billion of investment.</p>
<p>The <a href="https://president.uz/en/lists/view/9634">presidential report</a> gives no tariff, offtake or financing terms for either wind project.</p>
<h2>The wider package</h2>
<p>The wind plants were part of a larger set of announcements. In total, 11 projects worth $592 million were launched and construction began on 47 more worth $7 billion with foreign partners, which <a href="https://president.uz/en/lists/view/9634">the presidential website said</a> are expected to create 8,000 high-income jobs. <a href="https://president.uz/en/lists/view/9634">The report says</a> more than $5 billion of investment has been attracted to the region over nine years.</p>
<p>Other energy-related items in the package, <a href="https://president.uz/en/lists/view/9634">the report says</a>, include a thermal waste processing project in Nukus to generate electricity, a Korean-backed plant at Chimbay that will produce 3 million cubic metres of biogas a year from licorice root, which the report calls the first of its kind in the republic, and an EBRD-backed purchase of 112 electric buses with a new depot in Nukus. The package also covers projects with Chinese partners to produce digital currency and build artificial intelligence data centres in Kungrad and Takhiatash districts, with a combined value of $2.281 billion, <a href="https://president.uz/en/lists/view/9634">the report adds</a>. The Times of Central Asia noted that the Chinese partners were not named.</p>
<p>There is also a small mining link. <a href="https://president.uz/en/lists/view/9634">The same report</a> says a $20 million gold mining enterprise will be set up at the Zengibobo deposit in the Karaozyak district, where the new wind capacity sits. It gives no production target or power requirement for the mine, so the report does not show whether the wind plants will supply it.</p>
<h2>Grid and permitting remain the constraint</h2>
<p>Connection to the grid is a recurring issue for developers. On 16 October President Mirziyoyev announced an Investors' Council for the fuel and energy sector, to be chaired by Saida Mirziyoyeva, head of the Presidential Administration, after proposals from ACWA, Vision Invest, DataVolt, Voltalia and EDF to resolve problems through continuing dialogue with government agencies, <a href="https://www.gazeta.uz/en/2026/10/16/saida-mirziyoyeva/">Gazeta.uz reported</a>. The president said a single delay in land allocation, grid connection or technical specifications could affect an entire project. The council's powers and membership have not been announced.</p>
<p>A day before that announcement, the Asian Development Bank signed a $200 million loan to modernise Uzbekistan's electricity distribution system, which <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">it said</a> would enable at least 3.3 GW of renewable energy capacity. For Kungrad, the open points in the public record are a completion date, offtake and tariff terms, and the identity of the Chinese partners in the data centre projects. The council's mandate is the other unknown.</p><p><a href="https://corridorminerals.com/news/uzbekistan-commissions-300-mw-wind-karakalpakstan-kungrad-construction">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>YPP memo weighs 1 GW green hydrogen complex in East Kazakhstan at $2bn</title><link>https://corridorminerals.com/news/ypp-east-kazakhstan-green-hydrogen-ammonia-1-gw-memorandum</link><guid isPermaLink="true">https://corridorminerals.com/news/ypp-east-kazakhstan-green-hydrogen-ammonia-1-gw-memorandum</guid><pubDate>Fri, 23 Oct 2026 00:00:00 +0000</pubDate><description>The energy ministry&#x27;s figures of 55,000 tonnes of hydrogen or 310,000 tonnes of ammonia describe the same output; the cost depends on a feasibility study.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/ypp-east-kazakhstan-green-hydrogen-ammonia-1-gw-memorandum.jpg?v=3841d40b" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, green hydrogen, YPP weighs $2bn green hydrogen plant in East Kazakhstan</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/ypp-east-kazakhstan-green-hydrogen-ammonia-1-gw-memorandum.jpg?v=3841d40b" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/ypp-east-kazakhstan-green-hydrogen-ammonia-1-gw-memorandum.jpg?v=3841d40b" length="131494" type="image/jpeg"/><content:encoded><![CDATA[<p>Kazakhstan's Ministry of Energy, the East Kazakhstan regional administration and South Korea's YPP Corporation have signed a memorandum under which a renewable energy complex of about 1 GW is being considered to produce up to 55,000 tonnes of green hydrogen or up to 310,000 tonnes of green ammonia a year in East Kazakhstan region, the ministry said in a statement <a href="https://www.trend.az/casia/kazakhstan/4224944.html">quoted by Trend on 17 September 2026</a>. If the project is found to be feasible, its preliminary cost is estimated at $2 billion, the ministry said.</p>
<p>The memorandum was signed during President Kassym-Jomart Tokayev's visit to South Korea and covers analytical and research work, exchange of expertise and joint development of projects in hydrogen and renewable energy, <a href="https://www.trend.az/casia/kazakhstan/4224944.html">according to the ministry statement</a>. The complex is one area of cooperation under the document, not a signed investment.</p>
<p>The wording matters because some reports went further. Kursiv reported that YPP Corporation would finance the construction of a $2 billion green hydrogen and ammonia complex, <a href="https://kz.kursiv.media/2026-09-17/dnlt-va-milliarda-dollarov-vlozhat-v-zavod-zelenogo-ammiaka-na-vostoke-kazakhstana/">according to its article</a>, while the ministry text quoted by Trend speaks of a project under consideration with a preliminary cost conditional on feasibility. Neither source names a site, a water source or an offtaker.</p>
<h2>Two products, one quantity of hydrogen</h2>
<p>The two <a href="https://www.trend.az/casia/kazakhstan/4224944.html">output figures</a> are alternatives, and they describe the same hydrogen. Ammonia (NH3) is about 17.8 per cent hydrogen by mass, using atomic masses of 1.008 for hydrogen and 14.007 for nitrogen, so 310,000 tonnes of ammonia contains about 55,000 tonnes of hydrogen, on Offtake's arithmetic. The complex would therefore sell either the hydrogen itself or the same hydrogen converted into ammonia, not both.</p>
<p>The power figure can be tested in the same way, with one stated assumption. Electrolysers typically use in the region of 50 kWh of electricity per kilogram of hydrogen, a figure we assume here; on that basis 55,000 tonnes a year would need about 2.75 billion kWh, which a 1 GW renewable fleet would supply only if it ran at an average of about 31 per cent of capacity across the year, before any power for compression or for the ammonia synthesis plant itself. The <a href="https://www.trend.az/casia/kazakhstan/4224944.html">ministry statement</a> gives no electrolyser capacity and no capacity factor.</p>
<p>The ministry said green hydrogen is used in metallurgy, the chemical industry, energy and transport as a low-carbon fuel and raw material, and that green ammonia is mainly used to make fertiliser and in the chemical industry and is also considered a low-carbon energy carrier for international supply, <a href="https://www.trend.az/casia/kazakhstan/4224944.html">Trend reported</a>. The statement does not link the project to any metals producer or fertiliser plant.</p>
<p>YPP Corporation is a South Korean engineering and EPC company with more than 40 years of experience in energy projects including renewables, battery storage, nuclear power and green hydrogen, and since 2024 has been promoting hydrogen export projects under South Korea's National Hydrogen Strategy, <a href="https://www.trend.az/casia/kazakhstan/4224944.html">according to Trend</a>.</p>
<h2>Part of a larger visit</h2>
<p>Tokayev told the Central Asia and Republic of Korea business summit in Seoul on 16 September that around 80 commercial agreements worth approximately $19 billion had been signed between Kazakhstan and Korea during his visit, and that the government would closely monitor their implementation, <a href="https://www.akorda.kz/en/president-tokayev-addresses-the-central-asia-republic-of-korea-business-summit-1685841">according to the president's office</a>. He also said a comprehensive programme for trade, economic and investment cooperation between the two countries for 2027 to 2030 would be drawn up. Kursiv counted 12 intergovernmental and commercial agreements in energy, nuclear power and technology, <a href="https://kz.kursiv.media/2026-09-17/dnlt-va-milliarda-dollarov-vlozhat-v-zavod-zelenogo-ammiaka-na-vostoke-kazakhstana/">it reported</a>; the two counts use different scopes.</p>
<h2>What the memorandum does not say</h2>
<ul>
<li>Where in East Kazakhstan the complex would be built, and the split between wind and solar.</li>
<li>Who would buy the hydrogen or ammonia, and by what route it would be exported.</li>
<li>When a feasibility study would be completed.</li>
</ul>
<p>The <a href="https://www.trend.az/casia/kazakhstan/4224944.html">statement</a> sets no date for the feasibility work on which the $2 billion estimate depends.</p><p><a href="https://corridorminerals.com/news/ypp-east-kazakhstan-green-hydrogen-ammonia-1-gw-memorandum">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan signs $4.7bn of power deals and plans second and third nuclear plants</title><link>https://corridorminerals.com/news/uzbekistan-signs-4-7bn-power-deals-plans-second-third-nuclear-plants</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-signs-4-7bn-power-deals-plans-second-third-nuclear-plants</guid><pubDate>Fri, 23 Oct 2026 00:00:00 +0000</pubDate><description>Six projects add 3,000 MW of generation and 400 MW of storage; the president tied new reactors to rising uranium output but gave no sites, sizes or partners.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-signs-4-7bn-power-deals-plans-second-third-nuclear-plants.jpg?v=5c9f4725" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbek power deals, Uzbekistan signs $4.7bn of power deals</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-signs-4-7bn-power-deals-plans-second-third-nuclear-plants.jpg?v=5c9f4725" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-signs-4-7bn-power-deals-plans-second-third-nuclear-plants.jpg?v=5c9f4725" length="118783" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan signed agreements for six power projects worth a combined $4.7 billion on 16 October, adding 3,000 megawatts of generating capacity and 400 megawatts of energy storage, <a href="https://president.uz/en/lists/view/9726">according to the presidential press service</a>. The agreements were signed during an open dialogue between President Shavkat Mirziyoyev and investors in the fuel and energy sector. The release did not name the projects, their sponsors or their locations.</p>
<p>At the same meeting Mirziyoyev said Uzbekistan planned a second and a third nuclear power plant and tied the plans to its uranium mining. "Our uranium production is growing significantly," he said, <a href="https://www.gazeta.uz/en/2026/10/16/nuclear-power-station/">according to Gazeta.uz</a>, which reported that talks with new partners and investors on the second plant were scheduled for 17 October. He did not give locations, capacities, timelines or costs, and it was unclear which investors would take part, the outlet said.</p>
<p>The first plant is being built with Russia's state nuclear corporation Rosatom in Forish district of Jizzakh region. It combines two 1,000 MW VVER-1000 units and two 55 MW RITM-200N small reactors, for 2,110 MW in total, and was estimated on 2 September to cost $9.5 billion, <a href="https://www.gazeta.uz/en/2026/10/16/nuclear-power-station/">Gazeta.uz reported</a>. The first small reactor is scheduled for technical commissioning in 2029 and the first large unit in 2033. The presidential release says a dedicated industrial zone is planned to make equipment and materials for the plant.</p>
<h2>Targets for 2030</h2>
<p>The government aims to add 22,000 MW of generating capacity by 2030, lift annual electricity output above 129 billion kWh and raise the renewable share to 54 per cent, from 31 per cent of generation now, <a href="https://president.uz/en/lists/view/9726">the release says</a>. The sector has attracted $35 billion of investment over the past decade. Six more solar and wind projects with a combined 2,200 MW are to be put out to tender "in the near future".</p>
<p>Networks are to grow alongside generation. By 2030 Uzbekistan plans to build 5,000 kilometres of power lines and 16 major substations and to raise storage capacity to 4.5 gigawatts, <a href="https://president.uz/en/lists/view/9726">according to the release</a>. A map of available grid connections is due by 1 March next year and a National Energy Master Plan to 2050, the first to be published, by 1 July. Fully prepared projects will be offered through open competitive tenders, with land allocation, grid connection and electricity purchase terms set out in advance. The release also cites the need to secure reliable supply for industrial enterprises and data centres as their demand grows.</p>
<h2>An investor council and local manufacturing</h2>
<p>Investors at the meeting proposed a permanent mechanism to deal with land allocation, grid connections and technical approvals. In response, an Energy Sector Investors Council will be set up under the head of the Presidential Administration to resolve issues from project preparation to commissioning, <a href="https://president.uz/en/lists/view/9726">the release says</a>. Twelve projects worth a total of $850 million have been prepared to localise production of high-voltage equipment, energy storage systems and wind turbine components, and new mechanisms will let green power producers earn additional revenue from certificates and carbon credits.</p>
<p>On the sidelines of a meeting of the Council of Foreign Investors in the Fuel and Energy Sector the same day, Mirziyoyev received the heads of the Chinese companies CAMCE, China Energy and Sinoma Energy and supported their initiatives to set up a logistics hub in Andijan region, develop agrivoltaics and carry out oil and gas projects, <a href="https://president.uz/en/lists/view/9733">a separate release shows</a>. In oil and gas, exploration is under way on six investment blocks on the Ustyurt plateau with SOCAR and BP, and another 128 blocks have been prepared for potential foreign investors, <a href="https://president.uz/en/lists/view/9726">according to the main release</a>, which also mentions a methanol-to-olefins project in Bukhara region and the modernisation of the Bukhara and Fergana refineries.</p>
<p>Neither presidential release identifies the six signed projects or their sponsors, and no tariffs or financing terms were published. Mirziyoyev first spoke publicly about preparations for a second nuclear plant on 17 August, during a visit to Khorezm region, <a href="https://www.gazeta.uz/en/2026/10/16/nuclear-power-station/">Gazeta.uz noted</a>, and the authorities have not officially announced a builder for it.</p><p><a href="https://corridorminerals.com/news/uzbekistan-signs-4-7bn-power-deals-plans-second-third-nuclear-plants">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>ADB lends Uzbekistan $200 million to upgrade 60 power distribution substations</title><link>https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation</link><guid isPermaLink="true">https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation</guid><pubDate>Wed, 21 Oct 2026 00:00:00 +0000</pubDate><description>The results-based loan targets losses and reliability and is expected to enable at least 3.3 GW of renewable capacity; the World Bank may add $100 million.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/adb-lends-uzbekistan-200-million-power-distribution-modernisation.jpg?v=667bb611" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Energy Transition, ADB backs Uzbekistan&#x27;s distribution grid</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/adb-lends-uzbekistan-200-million-power-distribution-modernisation.jpg?v=667bb611" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/adb-lends-uzbekistan-200-million-power-distribution-modernisation.jpg?v=667bb611" length="127445" type="image/jpeg"/><content:encoded><![CDATA[<p>The Asian Development Bank has signed a $200 million loan with Uzbekistan to modernise its electricity distribution system, cut power losses and improve reliability as demand rises, the bank <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">said on 15 October</a>. ADB President Masato Kanda and Deputy Prime Minister and Minister of Economy and Finance Jamshid Kuchkarov signed the agreement, and ADB is the lead lender. The release is datelined Bangkok.</p>
<p>The Modernization of Electricity Distribution Systems Program, project 58309-001, will upgrade 60 critical distribution substations, introduce digital systems for network management and strengthen the operational capabilities of JSC National Electric Grid of Uzbekistan, <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">according to the release</a>. It also covers training in technical skills, management and financial controls at the national power transmission utility, and workforce training with greater participation of women in the energy industry.</p>
<h2>Results and co-financing</h2>
<p>ADB said the investments should reduce electricity losses and transformer overloading and improve reliability, but it gave no quantified loss target. It expects the programme to enable at least 3.3 GW of renewable energy capacity and to cut greenhouse gas emissions by nearly 23,000 tonnes of carbon dioxide equivalent a year, <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">the release says</a>. The loan is ADB's first energy operation under the ADB and World Bank Full Mutual Reliance Framework and the first results-based lending operation in Uzbekistan's energy sector. World Bank management is expected to seek Board approval later in October for an additional $100 million.</p>
<p>ADB has provided more than $3.4 billion in financing and guarantees for Uzbekistan's energy sector since 2010, <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">the release says</a>, and the programme supports the Uzbekistan 2030 Strategy and ADB's country partnership strategy for 2024 to 2028. Kanda said in the release that a reliable power supply is one of the most basic promises a modern economy must keep to its people.</p>
<h2>Generation, ownership and tariffs</h2>
<p>The loan targets the distribution end of a system where generation is expanding. On 18 September Uzbekistan commissioned two wind plants totalling 300 MW with 100 MW of storage in Karakalpakstan and said construction of a 1.5 GW wind project with ACWA, with 1,500 km of high-voltage lines, was entering its active phase, according to the <a href="https://president.uz/en/lists/view/9634">presidential website</a>. The first nuclear plant, a 2,110 MW project in Jizzakh region that began construction of its first unit on 4 June, is estimated to cost $9.5 billion, and on 16 October President Shavkat Mirziyoyev said Uzbekistan has plans for a second and third plant, <a href="https://www.gazeta.uz/en/2026/10/16/nuclear-power-station/">Gazeta.uz reported</a>.</p>
<p>Private capital is also entering distribution. Aksa Enerji will invest $357 million over the first 12 years to modernise and operate the distribution grids of Samarkand region, which remain state-owned, under a decree signed on 14 August, <a href="https://www.gazeta.uz/en/2026/08/20/aksa-enerji/">Gazeta.uz reported</a>. It described the project as the first in Uzbekistan to transfer distribution networks to a private operator with investment obligations.</p>
<p>Tariff reform is the other piece. In May the Ministry of Economy and Finance announced plans to use a regulated asset base method to calculate electricity and gas tariffs, and projected cost increases of about 9 per cent for generation, 30 per cent for transmission and about 10 per cent for distribution, with a suggested after-tax cost of capital of 14 per cent to 16 per cent, according to a <a href="https://www.gazeta.uz/en/2026/08/27/rab-tariffs-uznif/">Gazeta.uz report</a> of a 24 August forum speech by a Franklin Templeton executive. The ministry noted that these figures do not directly equal changes in household tariffs.</p>
<h2>What the release does not say</h2>
<p>The ADB release does not name an executing agency, does not state the loan's maturity or interest terms, and does not give a baseline for current distribution losses. It describes the 3.3 GW of enabled renewable capacity as a minimum and does not say which projects it counts. It does not name any mining, metals or other industrial consumer among the beneficiaries, and it says only that the investments will <a href="https://www.adb.org/news/adb-uzbekistan-sign-200-million-power-modernization-loan">help enable renewable capacity</a> as demand grows.</p><p><a href="https://corridorminerals.com/news/adb-lends-uzbekistan-200-million-power-distribution-modernisation">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>Uzbekistan guarantees purchase of small hydro output, indexing tariffs to consumer prices</title><link>https://corridorminerals.com/news/uzbekistan-small-micro-hydro-guaranteed-purchase-indexed-tariffs</link><guid isPermaLink="true">https://corridorminerals.com/news/uzbekistan-small-micro-hydro-guaranteed-purchase-indexed-tariffs</guid><pubDate>Mon, 19 Oct 2026 00:00:00 +0000</pubDate><description>The energy ministry says private micro plants pay back from 3.7 years; Andijan alone has 400 applicants for 44 MW.</description><category>Energy Transition</category><dc:creator>Headframe</dc:creator><media:content url="https://corridorminerals.com/img/covers/uzbekistan-small-micro-hydro-guaranteed-purchase-indexed-tariffs.jpg?v=30055b49" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Uzbekistan, small hydro, Uzbekistan guarantees purchase of small hydro power</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/uzbekistan-small-micro-hydro-guaranteed-purchase-indexed-tariffs.jpg?v=30055b49" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/uzbekistan-small-micro-hydro-guaranteed-purchase-indexed-tariffs.jpg?v=30055b49" length="132995" type="image/jpeg"/><content:encoded><![CDATA[<p>Uzbekistan's Ministry of Energy says the state will buy all electricity produced by privately built small and micro hydropower plants under long-term guaranteed contracts, with purchase tariffs indexed automatically to consumer tariffs, according to a <a href="https://t.me/minenergy_uz/21053">post on the ministry's official Telegram channel on 11 September 2026</a>. The ministry had announced on 7 September that <a href="https://t.me/minenergy_uz/20997">new opportunities and simplified requirements</a> were being introduced for entrepreneurs in the segment.</p>
<p>The ministry is pitching the scheme as an investment. Plants built to optimal parameters pay back from 3.7 years of operation and can earn up to 27 per cent net profit a year, and unlike solar plants they provide stable income over many years, <a href="https://t.me/minenergy_uz/21053">it said</a>. Those are the ministry's own projections; it published no model or tariff level behind them.</p>
<p>Andijan region has hydropower potential of 200 MW, enough for 500 million kWh a year, and there are already 400 applicants to build small and micro plants with a combined 44 MW, the ministry said in a <a href="https://t.me/minenergy_uz/21188">post on 24 September</a>. Turbine production has been set up in the region. The post says instructions were given to start a two-year programme to build micro plants turnkey and lease them to entrepreneurs, and to build a cascade of plants on 81 km of canals due to be lined with concrete.</p>
<p>The Andijan figures imply an average of about 110 kW per applicant and a capacity factor of about 28.5 per cent for the regional potential (500 million kWh divided by 200 MW running for 8,760 hours), on Headframe's arithmetic from the <a href="https://t.me/minenergy_uz/21188">ministry's numbers</a>.</p>
<p>The ministry has taken the offer on the road, holding open dialogues with entrepreneurs in Andijan on 17 September, <a href="https://t.me/minenergy_uz/21092">according to the channel</a>, followed by <a href="https://t.me/minenergy_uz/21126">Namangan</a> on 19 September and <a href="https://t.me/minenergy_uz/21153">Fergana</a> on 23 September, and announcing a further session in Sariosiyo district of Surkhandarya region for 15 October, <a href="https://t.me/minenergy_uz/21327">it said</a>.</p>
<p>The posts give no national capacity target for small hydro, no purchase tariff in soums per kWh and no name or number for the legal act that set up the guaranteed purchase system. They also do not say whether the plants will connect to distribution networks or how their output is expected to vary by season.</p>
<p>The next scheduled step in the posts is the Surkhandarya dialogue; the ministry has not given a date for publishing the tariff.</p><p><a href="https://corridorminerals.com/news/uzbekistan-small-micro-hydro-guaranteed-purchase-indexed-tariffs">Read on Corridor Minerals</a></p>]]></content:encoded></item>
<item><title>EBRD lends up to KZT 102bn to Almaty grid company Alatau Zharyk</title><link>https://corridorminerals.com/news/ebrd-kzt-102bn-alatau-zharyk-almaty-grid-loan</link><guid isPermaLink="true">https://corridorminerals.com/news/ebrd-kzt-102bn-alatau-zharyk-almaty-grid-loan</guid><pubDate>Sun, 18 Oct 2026 00:00:00 +0000</pubDate><description>The loan to Samruk-Energy&#x27;s distributor pays for smart meters and a substation for Alatau city; it equals a sixth of the utility programme&#x27;s 2026 borrowing.</description><category>Energy Transition</category><dc:creator>Offtake</dc:creator><media:content url="https://corridorminerals.com/img/covers/ebrd-kzt-102bn-alatau-zharyk-almaty-grid-loan.jpg?v=566e5627" medium="image" type="image/jpeg" width="1600" height="900"><media:description type="plain">Cover card: Kazakhstan, power grid, EBRD lends KZT 102bn to Almaty grid operator</media:description></media:content><media:thumbnail url="https://corridorminerals.com/img/covers/ebrd-kzt-102bn-alatau-zharyk-almaty-grid-loan.jpg?v=566e5627" width="1600" height="900"/><enclosure url="https://corridorminerals.com/img/covers/ebrd-kzt-102bn-alatau-zharyk-almaty-grid-loan.jpg?v=566e5627" length="115947" type="image/jpeg"/><content:encoded><![CDATA[<p>The European Bank for Reconstruction and Development (EBRD) is lending up to KZT 102 billion, about €194 million, to Alatau Zharyk Company (AZhC), the electricity distributor for Almaty city and Almaty region, the bank said in a <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-contributing-to-modernisation-of-kazakhstan-national-grid.html">statement on 7 September 2026</a>. AZhC is wholly owned by Samruk-Energy, Kazakhstan's largest diversified energy holding, and supplies about four million people and around 50,000 commercial consumers, according to the EBRD.</p>
<p>The long-term loan will pay for automated metering and telemechanic equipment and for upgrading the company's low and medium-voltage network, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-contributing-to-modernisation-of-kazakhstan-national-grid.html">the bank said</a>. It sits inside the government's National Project for the Modernisation of Energy and Utility Sectors, known by its Russian initials as MEKS, which aims to cut the wear on Kazakhstan's heat, power, water and sewerage networks.</p>
<p>The loan is a large share of the programme's borrowing. The government expects total investment of KZT 13 trillion under the national project from 2025 to 2029, of which KZT 6.2 trillion is for the energy sector, and approved KZT 625 billion of borrowed funds for 2026, raised with six international financial institutions, Deputy Minister of National Economy Asan Darbayev told a <a href="https://primeminister.kz/en/news/it-is-planned-to-reduce-the-wear-of-utility-networks-to-40-by-2029-in-kazakhstan-31705">government session on 28 July</a>. The EBRD loan alone equals about a sixth of that 2026 borrowing figure, on Offtake's arithmetic, although the bank does not say over how many years it will be drawn.</p>
<h2>Smart meters, a substation and Alatau city</h2>
<p>The project will add smart meters at substations, pilot smart grid technologies and strengthen cybersecurity at AZhC and at Samruk-Energy group level, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-contributing-to-modernisation-of-kazakhstan-national-grid.html">according to the EBRD</a>. The bank expects annual electricity savings of about 22 GWh and a cut in carbon dioxide emissions of around 12,000 tonnes a year, and says the work should help more renewable generation connect in Almaty region.</p>
<p>Part of the money will rebuild the Zhetygen substation and an associated 110 kV transmission line to secure supply for Alatau, the new smart city the government is developing north of Almaty, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-contributing-to-modernisation-of-kazakhstan-national-grid.html">the statement says</a>. That component falls under a five-year enhanced partnership framework agreement between Kazakhstan and the EBRD.</p>
<p>The bank framed the loan against the size of the system it serves. Kazakhstan's grid has more than 24 GW of installed generation capacity and stretches across more than 470,000 square kilometres, making it one of the world's largest, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-contributing-to-modernisation-of-kazakhstan-national-grid.html">according to the EBRD</a>.</p>
<h2>How worn the networks are</h2>
<p>The government's own figures show why distribution companies are being financed first. After two years of the national project, the average wear of electricity networks is expected to fall from 67 per cent to 62 per cent, with accident rates down 3.9 per cent and power losses down 0.6 per cent, Darbayev <a href="https://primeminister.kz/en/news/it-is-planned-to-reduce-the-wear-of-utility-networks-to-40-by-2029-in-kazakhstan-31705">told the session</a>. The target for 2029 is to bring average wear across all engineering infrastructure down to 40 per cent, to commission 7,309 MW of generating capacity and to repair or modernise 84 thousand km of networks, he said.</p>
<p>Financing raised in 2025 under the national project totalled KZT 31.7 billion, and funding for housing and communal services in 2026 has doubled from 2025, <a href="https://primeminister.kz/en/news/it-is-planned-to-reduce-the-wear-of-utility-networks-to-40-by-2029-in-kazakhstan-31705">according to the government</a>. A single EBRD loan of KZT 102 billion is more than three times the 2025 amount.</p>
<p>The EBRD has invested almost $13.6 billion (€11.7 billion) in Kazakhstan through 358 projects, the largest and longest-running recipient of its investment in Central Asia, <a href="https://www.ebrd.com/home/news-and-events/news/2026/ebrd-contributing-to-modernisation-of-kazakhstan-national-grid.html">the bank said</a>.</p>
<h2>What the statement does not say</h2>
<ul>
<li>The tenor, pricing or any guarantee on the loan, or whether it is disbursed in tranches.</li>
<li>How many smart meters will be installed or how many kilometres of line will be rebuilt.</li>
<li>Whether tariffs in Almaty will be adjusted to service the debt.</li>
</ul>
<p>The statement gives no completion date for the Zhetygen substation, the component most closely tied to the Alatau city timetable.</p><p><a href="https://corridorminerals.com/news/ebrd-kzt-102bn-alatau-zharyk-almaty-grid-loan">Read on Corridor Minerals</a></p>]]></content:encoded></item>
</channel>
</rss>
